No.

MHU-MIN-MO-429
PT. MULTI HARAPAN UTAMA Efective : 28 September 2018
Approval : 30 September 2018
BLAST DESIGN Revision : 0
Page : 1 of 1
Lokasi Peledakan KONTROL 25
Pit : Pit M SAYAP 109
Tanggal : 23-Jan-24
Block/ Strip : 106-111
Elevasi : -15
RL : -21
Geometri Peledakan
Pit 270 Merbabu
Spacing : 8 Meter
Burden : 7 Meter
Coloum charge : 4.5 Meter
Sub drill : 0.5 Meter
Depth : 9 Meter
Delay Pattern :
Total Holes : 168 Ea
Pemakaian Bahan Peledak
Ammonium Nitrat : Kg
Emulsion : 17,498 Kg Pit SST
Dinamite : 200 Pcs
Dayagel Magnum (@0.5 Kg) : 100 Pcs
Electrik Detonator : 3 Pcs
Surface Delay (TLD)
17 MS (12 Meter) : 45 Pcs
25 MS (12 Meter) : Pcs
42 MS (12 Meter) : 123 Pcs
67 MS (12 Meter) : Pcs
109 MS (9 Meter) : Pcs
176 MS (9 Meter) : Pcs
In Hole Delay (DTH)
500 MS ( 9 Meter) : Pcs
500 MS ( 12 Meter) : 168 Pcs
3000 MS (9 Meter) : Pcs
Dibuat oleh, Disetujui oleh, Diketahui oleh : Volume by formula (BCM ) Ket :
Kode kondisi lubang
Plan Actual
Lubang Kering
79,968
Lubang Basah
Powder faktor (Kg/BCM)
Lubang Rusak
( ) ( ) ( ) ( ) Plan Actual
D&B Engineer PT. CK D&B Spv PT. Dahana D&B Engineer PT. MHU Mining Superintendent PT. MHU 0.22
Distribusi : Asli : Drill & Blast Spv PT. DHN, Yellow : D&B Engineer PT. MHU, Green: Mining
Contractor