Contract No.

: ORRO-2012 Date: 15-04-2023


DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

 MSRA HSE induction for all site operatives/Workforce prior to


start the work.
 MSRA briefing conducted prior to start the work by engineer.
 Always follow defensive driving techniques.
 Never drive without being authorized to do so.
 Equipment transportation on truck with proper fastening and
securing wedges to restraining movements.
 High visibility marking/signs while transporting oversized
objects
 Secure the materials by belts, Wedges, Slings Etc...
Traffic incidents while driving  Mobilization of equipment which are in good condition is prime Project Manager
to the site importance at commencement of project to avoid delay due to
Site Site Engineer
Mobilization High break down and accidents. Low Site Engineer
Driver fatigue  Third party certification for construction equipment where
01. Site Supervisor
(Manpower and (3x4=12) applicable. (1x3=3) Site Supervisor
Equipment/Vehicle Failure  Vehicle/machinery documentation for the equipment in
Materials). HSE Officer
compliance with local lows and client requirements. HSE Officer
Abnormal Weather condition  Obey all traffic rules/signs and markings.
 Trained and Licensed operator. Drivers with all the vehicle and
equipment.
 All the workers involved in the activity must be physically fit.
 Provision for trained banks man/flagman.
 Driver should take enough break after each shift or long
journey
 Avoid long hour driving and night driving if possible.
 Avoid driving in adverse weather conditions like fog, sandstorm
 Driver’s cabin should be equipped with air conditioner and in
good working condition.
02. Storage of Insecure stacking or storage Medium  Good Housekeeping to be maintained at the site in daily basis. Low Project Manager Site Engineer
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

 Close supervision required by competent supervisor.


 Stacked load correctly piled and cross tiered.
 Place higher object closer to the ground and smaller object
higher.
 Inspect material storage area in daily basis.
 Keep storage are free from accumulated materials that may
Material falling from height cause slip trip and fall.
 Apply segregation of materials according to its classification.
Blocking Access/Exit routes  Periodic training provides for all the employees those who
involved in the activity.
Materials storing near to Site Engineer
 Need to maintain a minimum distance of 2 meters from the
vehicle access area. Site Supervisor
edge of the cable trough.
materials (3x3=9)  Barricading and signage’s to provide. (1x3=3) Site Supervisor
Manual Handling HSE Officer
 Single entry/Exit point implements to avoid unauthorised
entry. HSE Officer
Unauthorised Entry
 All the materials stack separately as per the material
Storage, use and handling of classification.
hazardous material.  Hazardous chemical Follow the instructions from
MSDS/COSHH.
 Adequate number of fire extinguisher provide as per local
Authority regulation.
 Emergency contact details will be display inside the storage
area.
 Drip trays will be provided for smaller chemical and fuel
storage areas.
Low Site Engineer Site Supervisor
 Obtain the permit if required.
03. Loading High  All workforce shall be briefed on the task prior to start the (1x3=3) Site Supervisor Site Engineer
unloading work by supervisor.
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

 MSRA Briefing needs to conduct by site engineer.


 Plan the work and ensure safe access, working platform and
Improper Loading. system of work shall be ensured.
 Suitable working platform/Ladder/Fall protection to be used
Defective Equipment.  Movement of personnel near the edge of the vehicle bed
should be avoided/ restricted.
Over Loading.  Proper edge protection shall be installed.
 Follow proper safe lifting/Loading procedure Technique.
Defective Chain binder.  Use proper restraining devices to secure the materials with
transporting.
Material falling from height  Proper competent supervision while loading /Unloading
materials form
Truck/Trailer  Use certified lifting equipment/tools tackles and restraining
Lack of proper Restraining (3x4=12) accessories. HSE Officer HSE Officer
Devices.  Use training and experienced personnel for loading and
unloading task.
Manual Handling.  Ensure and verify competence of the personnel involved in
loading/unloading activities.
Slackness Dimensions of the
 Use all necessary PPEs.
load ETC...
 Barricade the work area to restrict the unauthorised entry.
 Testing and certification of the equipment will be done prior to
use.
 Activities to be planned and coordinated in advance with
regards to the area of intervention and equipment to be used.
 Equipment maintenance to be carried out as per the
requirement
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

 Obtain the permit if required.


 All workforces shall be briefed on the task prior to start the
Lifting heavy loads
work by supervisor. Engineer
Material Medium  Max weight of 25 kg shall not be exceeded for individual lifting Low Site Engineer
Sharp edges
04. Handling capacity. Supervisor
(Manual) (2x3=6)  Employing trained and experienced persons. (1x3=3) Site supervisor
Whipping action
 Proper lifting procedures. HSE team
 Good housekeeping.
Weight & dust
 Use of proper PPE.

 Obtain the permit if required.


 All workforce shall be briefed on the task prior to start the
Lack of knowledge work by supervisor.
 Approved lifting plans to be available for lifting materials more
Defective equipment than 2 tons. Engineer
Material Medium  Use only competent and third party trained operator for lifting Low Site Engineer
05. Handling Defective lifting tackles operations. Supervisor
(Mechanical) (2x3=6)  Equipment and lifting tackles regularly inspected and well (1x3=3) Site supervisor
Overloading maintained. HSE team
 Follow safe work procedures.
Untrained personnel  Operate with authorized banks man.
 Proper training to personnel involved.
 Never over load than the capacity of the equipment.

06. Height Work High Low Site Engineer Engineer


 Approved method statement shall follow for scaffolding
(Usage of Collapse of scaffolding (4x3=12) erecting. (1x3=3) Site supervisor Supervisor
Scaffolding) structure  Scaffolds shall be erected or dismantled by a trained scaffolding
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

Uneven ground surface. team under the supervision of a competent scaffolding HSE Officer
inspector/ Supervisor.
Improper scaffolding erection  All platforms are to be fully boarded and hand railed.
 Worker erecting and dismantling scaffolds shall be provided
Fall hazard (Man/ Material). with proper fall protection measures and shall be provided
with the suitable personal protective equipment to protect
Workers hit by falling them from fall hazard
materials, protruding nails,  Full body harness with Double lanyard to be used all the time
sharp edges. while erecting, modifying or dismantling of scaffolding.
 Full body harness to be inspected by the user before wearing
Exhaustion due to climbing  Toe boards are to be installed on all used platform levels.( Toe
high ladders. boards should be no less than 150mm)
 Tool-retainers (boxes and buckets) to be used to reduce the
adverse weather conditions risk of tools falling form scaffold.
(wind and run)  Suitable signs and barriers below work to inform others of
work above.
Unsecured equipment.  Leaning from the guard rail, over reach and throwing materials
from top are all not allowed.
Inappropriate use of access  All workers in elevated positions are to wear a safety harness
and/or fall arrest equipment: and must be anchored to a safe anchoring point where primary
fall protection is unavailable.
scaffold elevated work  Start from the bottom and construct the scaffold safely
platform upwards. Only continue to the next level once all the bracing
and fittings are in place in the lower level.
harnesses and lanyards  Secure the ladders/ stairs properly.
 Minimize number of people in the area.
anchor points  Train the workers on Manual handling techniques.
 Wherever possible, minimize human involvement by using
mechanical handling methods.
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

 Ensure good standard of lighting in the work area.


 A scaffolding supervisor should be present during the erection
of the scaffolds.
 Resting at height shall not be allowed.
 Stairs should have regular landings where workers can rest
effectively.
 Access points are to be identified clearly and chosen at
appropriate positions where access is most practical.
 The scaffold is only to be put into use once the 3rd party
trained scaffold inspector has inspected the scaffold and
deemed it safe to use and place the signed ‘Scafftag.‘ .
 All workers on site must have received site-specific safety
induction
 JSTI to be given to workers on subjects relevant to task being
carried out. Records to be kept.
 All personnel should be trained to a level of competence
sufficient to enable them to carry out their work whilst
ensuring the health and safety of themselves and others.
 Scaffold must be inspected prior to use/weekly or as per client
requirements( Renew the scaffold tag every week by
competent scaffolding foreman )
 While working with mobile scaffolding, caster wheel shall lock
while working over the scaffolding
 Access must be achieved from inside by way of secured ladder.
 No overloading with materials.
 Brakes must be applied when stationary.
 No persons to be on mobile scaffold during movement.
 Partially erected or dismantled scaffolds shall not be used, and
a prominent warning notice indicating that the scaffold is
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

incomplete and not safe to be used (Red Scaffold Tag) shall be


posted. The access to the scaffold shall physically be blocked.
 PPE compliance shall follow.
 Ladder shall inspect before use at site
 Periodic inspection of ladder and colour-coding procedure shall
follow, as applicable(Monthly)
 Ladder shall place over firm ground surface
Insecure ladder
 Only one person allowed to work over ladder
 One person should hold the ladder While using ladder
Procurement of
 Suitable signs and barriers below work to inform others of
inappropriate ladder Project Manager
work above.
Use of damaged ladder Site Engineer
Height Work  Three-point contact procedure shall follow
Medium  Top three steps shall secure to prevent climb at top of the Low Engineer
07. Use of non-standard or Site supervisor
(Usage of ladder
mixed component (2x4=8) (1x3=3) Supervisor
Ladder)  Awareness training shall be conducted for safe use of ladder
 Ladders / step ladders shall be manufactured to EN or HSE Officer
Modification of ladder by HSE Officer
equivalent standards. Fabricated ladders are strictly prohibited
unauthorized person
at site
 Use straight ladder and secure in 4:1 ratio.
Manmade ladder
 Ladder shall be acceptable for short duration works or
inspections when used as work platform.
 Trainings on ladder safety shall be delivered to the workers
 PPE compliance shall follow.

08. Hot Work Flying particles, High  Obtain work permit if required.
Activity  MSRA briefing for all the employees prior to start this activity
Flames (4 x5=20)  Tool box talk to be conducted prior to start the activity
(Cutting conducting by supervisor.
work/Grinding Contact with moving tools  The hot work area must be free from combustible/
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

work/Drilling bit. Flammables.


Work/Welding  110 voltage tools with power supplied through an isolating
work) Generation of hazards & centre tapped to earth should be used. Project Engineer
wastes.  Where use of 220v (+) tools is unavoidable, use a residual
current device (RCD) or an earth leakage circuit breaker (ELCB) Site supervisor
Electricity protection device.
 The supply voltage must be within the operating range as Labour
Vibration/Noise marked on the tool-plate.
 Trailing cables should not be in the path of other workers and Foreman
Incompetency of person to be routed overhead or protected.
Monitoring by HSE
 Cables shall not have any cuts. Use only industrial plugs and
officer
connectors
 Tools should be either earthed or doubled-insulated. Low Engineer
 All cable joints should be very rigidly made and insulated to
avoid getting heated up /producing sparks & fires. (1x5=5) Supervisor
 If adjustments need to be made, tools should be disconnected
from the mains supply. Workers
 All cables shall be routed along dry surfaces and not entangles
with nails or any other protruding metal pieces.
 Equipment should be inspected by the user before each period
of use to ensure it is not damaged.
 Electrical equipment will be inspected and maintained as per
manufacturer’s recommendations by a competent and trained
electrician at the Plant Department.
 Work area should be properly barricaded with proper sign
boards to prevent unauthorized entry.
 Valid Fire extinguisher, Fire blanket must be provided.
 Ensure all the mechanical equipment must attach with
protection guards.
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

 Any combustible that cannot be removed, such as wood


platforms, should be covered with a flame-resistant material.
 Maintain good housekeeping.
 PPE compliances shall follow.
WELDING WORKS
 Provide proper hazard signs in the vicinity of the area.
 Welding machine body earthing must be given.
 Except the electrode holding jaw, the remaining part of the
welding holder should be fully insulated.
 Proper cables must be used for the return path of the welding
machine.
 Welding machine & the cables should not be kept in wet
places.
 Welding machine and cables should be checked before start of
the job.
 Welding machine should be switched off when the welding
work is finished.
 Fire extinguishers shall be provided at work spot.
 Provide proper local exhaust ventilation to avoid inhalation of
fumes.
 Remove all other employees where the risk of fumes is present.
 Welding machine and the operator should be third party
certified for performing the activity.
 Ensure welding and connections are not obstructing the
walkways.
 Supervisor to keep track of the activity and give proper
instructions.
 Ensure good housekeeping practice for the duration of the
work.
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

 No smoking policy should be strictly followed.


 Competent supervision shall be made available.
 A person who is well-trained on fire fighting shall be assigned
as a firewatcher to maintain a watch for flying sparks resulting
from the welding operation.
 PPE such as leather hand gloves, face shield Fire Retardant
clothes, aprons shall be used.

NOTE: The Welding of channel support will be outside of work


area at designated welding workshop Except welding to be done
with already erected Structure.
09. Portable Hand / Medium  Task briefing need to conduct for all the workers prior to start Low Site Engineer Project Manager
Power Tools Defective Tools the work by supervisor.
(3x3=9)  Periodic training need to be conducted to all operatives to (1x3=3) Site supervisor Engineer
Improper handling improve awareness on how to use power tools.
 Electrical instrument will be inspected and maintained as per Supervisor
Improper storage manufactures recommendation’s by a competent and trained
electrician at the plant. HSE team
Misuse of tools  Replace /repair defective tools.
 Use with proper PPE
Damaged cable  Correct usage as per manufacture recommendation.
 Proper storage of tools
Unguarded tool  Use only with required protective handles.
 Use tool with proper guard only
Loose components  Trained personnel.
 Do not use loose cloth while using tools with rotating Wheels
Excess pressure on tools  Avoid working with equipment and tools for long term.
 Job rotation to be implemented for long term use of power
Rotating wheels tools.
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

 Appropriate voltage tools with power supplied through an


isolating centre tapped to earth should be used.
 The supply voltage must be within the operating range as
marked on the tool-plate.
 Always use the industrial socket and shall be check for safe
working condition
Non-use of PPE
 Where use of 220V (+) tools is unavoidable, use a residual
current device (RCD) or an earth leakage circuit breaker (ELCB)
Vibration/Noise
protection device.
 Equipment should be inspected by the user before each period
of use to ensure it is not damaged.
 Only skilled personnel shall be allowed to use the power cable
cutter
 PPE compliance shall follow.
10 Cable tray Medium  Obtain work permit if required. Site engineer
structure  Provide task briefing prior to start the work by site supervisor.
Height works (3x3=9)  Working at height platform must be inspected and ensure safe
installation HSE Officer
works. to work prior to start the work (Scaffolding/MEWP).
 Cable tray accessories shall keep in a bucket to avoid material
Slip/Trip
fall from height.
 Cable tray work shall be conducted by competent fitter.
Personnel injury  Manual handling activities will be kept to a minimum.
 Where ever-possible use mechanical aids to reduce manual
handling.
Manual Handling  Barricade the work area /Provide signage.
 Manual handling techniques must be briefed and followed by
all team members. Low Site engineer
Poor illumination  Assess the load prior to proceed lifting.
 Protect sharp edges suitably protected before lifting.
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

 Toolbox/Training is must for all involved persons. (1 x 4=4) Supervisor


 Ensure there are adequate information, instruction, training
and supervision. Workers
 Work area must be adequately illuminated.
Improper access and egress  Pinch points must be identified and avoided while handling.
 Close supervision must be available all the time.
 Max weight of 25 kg shall not be exceeded for individual lifting
capacity.
 Ensure all mandatory and task specific PPE are issued and
used.
11. Working with High Low Site Engineer Project Manager
plant and Collision of plant.  Obtain the permit if required.
equipment (5x4= 20)  Conduct task-briefing prior to start the activity by Supervisor. (1x3=3) Site Supervisor Engineer
Collision with operatives.  Only competent and authorized personnel with valid license &
(Forklift/man 3rd party certificate must operate the Plant. HSE Officer Supervisor
lift/Boom Run over.  Banks man to control plant / vehicles movements on site
loader)  All plants shall be subjected to Pre deployment checking by
Misuse of Plant. authorized person.
 No defective plants shall be used on site. All systems and safety
Mechanical failure. features such as seat belts, warning indicators etc. must be
fully operational
Blind spot.  Equipment to be well maintained and inspected as per
manufacturer’s recommendations and the daily plant
Unauthorized operation. inspection checklist shall be maintained.
 Flashing warning lights to be used on moving plant.
Toppling / fall over.  Reversing warning signals to be used on all plant.
 Plant shall not left with its key on board.
 Only competent flagman be used and he shall be equipped
with flag/ whistle during day and baton light with whistle
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

during night and will be at safe distance and out of blind spot.
 Steel toe safety boots, hard hat and fluorescent vest are
mandatory outside of vehicles
 Flagmen to be used for traffic management, plant operations
and signalling.
 On site equipment/Machinery maintenance is not permitted.
 Equipment maintenance to be carried out as per the
requirement.(must provide ground protection to avoid soil
contamination)
 After the completion of maintenance the hazardous waste
must be disposed as per local authority regulation(Waste
management plan)
 Use of trained personnel Project Manager
 Good house keeping
Medium  Barricading the area Low Site Engineer Engineer
Use of Leakage
12.  Proper ventilation
Chemicals  Use of required PPE
Spillage / spray of Chemicals (2x3=6) (1x3=3) Site supervisor Supervisor
 Inspection
 Proper packaging and storage HSE team
 Follow the instructions from MSDS/COSHH.
Environmental Risk Assessment

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

01 Waste/Refuse Contaminated soil, Medium  The use of small water bottles will be limited and the use of Low Site Engineer Project Manager
if found water dispenser and reusable glasses will be enhanced,
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

especially in offices.
 Will try to prohibit the use of plastic carry cases; however it
will be reduced to maximum possible.
 Waste collection, segregation, storage and disposal will be in
compliance to project.
 No littering and good housekeeping will be maintained at all Engineer
times.
Food waste (3x3=9) (1x3=3) Site supervisor Supervisor
 Incompatible waste will not be mixed or transported
together.
Polyethene waste, if any HSE team
 No waste will transport to other Emirates.
 Changing of oil and grease is prohibited. On emergency
cases, it will be undertaken in a designated hard standing
area provided with drip trays.
 Onsite vehicle and equipment maintenance is prohibited.

Traffic
 Vehicles will be switched off when not in use. Project Manager
Auxiliary units such as  Containers of fuel, chemicals and paints will always be
generators Medium covered (lid closed) when not in use. Low Site Engineer Engineer
02 Air pollution  Toilets will be regularly cleaned and managed
Solvents (3x3=9)  Trained HSE personnel on site to make sure the effective (1x3=3) Site supervisor Supervisor
implementation of mitigation measures
Release of gaseous  Adequate training HSE team
pollutants. CO, SOx, NOx  Incident reporting
Public nuisance
03 Poisonous Plants Medium  Ensure pre mobilization assessment in the area of the Low Site Engineer Project Manager
snakes Animals project activities.
Reptiles (3x3=9)  Identify the preventive & protective measures (camel (1x3=3) Site supervisor Engineer
Pests barriers, fencing, removal of the bushes etc.)
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

 Ensure Periodic Pest control activity in the area.


reptiles Insects  Ensure effective food waste disposal practices.
Location of the activity.  Ensure regular Fumigation Supervisor
Plants (Forest, water, marshy land  Communicate information & alerts with regards to the
etc.) dangerous flora & fauna (identification/ signs & symptoms HSE team
Animals Personnel awareness etc.) and the requirements to keep out.
Emergency Preparedness.  Ensure emergency preparedness & drills.
 Ensure the personnel are provided with appropriate PPE
 Maintenance of plant/ equipment and tools adequately.
 Avoid working with plant/equipment and tools for long term.
 Job rotation wherever practicable. Project Manager
Use of plant
Health hazard  Keep away from noisy equipment.
Noise Medium  Job rotation to be implemented for long term use of power Low Site Engineer Engineer
Equipment
04 Vibration tools.
(3x3=9)  Long term driving of plant and equipment in terrain area to (1x3=3) Site supervisor Supervisor
vehicles, power
tools etc. be avoided.
HSE team
 Adequately maintained tools and equipment to be used
 Hearing protection to be used.
 Suitable hand gloves.
 Housekeeping on daily basis.
 Skips / drums to be provided to dispose debris Project Manager
 Keep walkways and site always clear. Ensure access routes
Medium are firm and level where possible. Low Site Engineer Engineer
05 Housekeeping Tripping hazard, fire hazard  All personnel to wear safety boots at all times.
(4x2=8)  Care to be taken when walking on an uneven road / path (1x3=3) Site supervisor Supervisor
surface.
 Ensure the material storage does not obstruct the access and HSE team
egress.
 Secure all the materials properly
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

 Work must be stopped immediately there is rain/sand Project Manager


Inclement storm/windstorm.
Damage to equipment  Weather forecasts must be strictly monitored/followed.
High Low Site Engineer Engineer
06 Adverse  Winds speed/direction to be monitored regularly.
Materials, injuries to  Anemometer must be provided to monitor wind speed in
weather (4x4=16) (1x3=3) Site supervisor Supervisor
workmen. sites.
condition
 All Equipment/materials/ work areas must be properly HSE team
secured during inclement weather conditions.
 Social distancing must be maintained at 2 meters gap
between two workmen.
 Regular hand wash for at least 20 seconds. Project Manager
High temperature
 Hand sanitizers must be provided
High  Face masks must be worn by everyone on site. Low Site Engineer Engineer
Covid 19 Headache, Short breath,
07  Hand gloves must be provided
Precautions Breathing difficulties, body (4x5=20)  All workmen must undergo Covid test before being deployed 1x5=5 Site supervisor Supervisor
pains,
to site.
HSE team
 Covid 19 awareness training to be provided with posters
posted all areas of the site.
 Emergency procedure to be in place.
08 Working under Heat exhaustion High  Drinking station to be provided Low Site Engineer Project Manager
direct sun light  Shaded rest area to be provided
stroke (4x3=12)  Welfare facilities to be in place (1x3=3) Site supervisor Engineer
Heat  First aider & first aid facilities to be in place.
fatigue  Heat stress awareness training to be given. Supervisor
Heat stress  Heat Stress Plan to be strictly implemented.
 Electrolyte must be distributed to all and ensure sufficient HSE team
stock.
 Job rotation must be implemented.
 Frequent rest shall be ensured.
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1

Health & Safety Risk Assessment


Operation: Containment work Risk Assessment No:1

Location: Dubai. Person Completing Assessment: Mr. Sreehari

Activity: Containment works Assessment Date: 15-04-2023

Item Activity Hazards Initial Risk Precautions Monitoring


Final Risk Responsibility Responsibility

Health and safety Risk Assessment.

 Emergency Response plan must be in place.


 Emergency contact numbers must be posted on all site
notice boards and also all workmen must have the numbers
stored in mobile phones.
 Temperature flag system shall be implemented in the site to
notify the workers about hot weather condition in the site.
Project Manager
Lack of Toilets  Provide Clean cool drinking water
Medium  Proper rest areas must be provided Site Engineer Engineer
Welfare
09 Rest Areas  Adequate number of Toilets must be in place 1x3=3
Facilities
(3x3=9)  Regular disinfection of washrooms Site supervisor Supervisor
Drinking water  Sanitizers with hand washing facilities must be in place
HSE team

DEGREE OF RISK CONSEQUENCES


1 - Very Low 2 - Low 3 - Medium 4 - High 5 - Very High
1 - Improbable 1 2 3 4 5
OCCURRENCE
PROBABILITY

2 - Remote 2 4 6 8 10
OF

3 - Occasional 3 6 9 12 15

SEVERITY WEIGHTING (P 4x C)
4 - Probable 8 12 16 20
1-3 Low (L)
5 - Frequent 5 10 15 20 25
4-9 Medium (M)
10-25 High (H)