RA-Containment Works
RA-Containment Works
Uneven ground surface. team under the supervision of a competent scaffolding HSE Officer
inspector/ Supervisor.
Improper scaffolding erection All platforms are to be fully boarded and hand railed.
Worker erecting and dismantling scaffolds shall be provided
Fall hazard (Man/ Material). with proper fall protection measures and shall be provided
with the suitable personal protective equipment to protect
Workers hit by falling them from fall hazard
materials, protruding nails, Full body harness with Double lanyard to be used all the time
sharp edges. while erecting, modifying or dismantling of scaffolding.
Full body harness to be inspected by the user before wearing
Exhaustion due to climbing Toe boards are to be installed on all used platform levels.( Toe
high ladders. boards should be no less than 150mm)
Tool-retainers (boxes and buckets) to be used to reduce the
adverse weather conditions risk of tools falling form scaffold.
(wind and run) Suitable signs and barriers below work to inform others of
work above.
Unsecured equipment. Leaning from the guard rail, over reach and throwing materials
from top are all not allowed.
Inappropriate use of access All workers in elevated positions are to wear a safety harness
and/or fall arrest equipment: and must be anchored to a safe anchoring point where primary
fall protection is unavailable.
scaffold elevated work Start from the bottom and construct the scaffold safely
platform upwards. Only continue to the next level once all the bracing
and fittings are in place in the lower level.
harnesses and lanyards Secure the ladders/ stairs properly.
Minimize number of people in the area.
anchor points Train the workers on Manual handling techniques.
Wherever possible, minimize human involvement by using
mechanical handling methods.
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1
08. Hot Work Flying particles, High Obtain work permit if required.
Activity MSRA briefing for all the employees prior to start this activity
Flames (4 x5=20) Tool box talk to be conducted prior to start the activity
(Cutting conducting by supervisor.
work/Grinding Contact with moving tools The hot work area must be free from combustible/
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1
during night and will be at safe distance and out of blind spot.
Steel toe safety boots, hard hat and fluorescent vest are
mandatory outside of vehicles
Flagmen to be used for traffic management, plant operations
and signalling.
On site equipment/Machinery maintenance is not permitted.
Equipment maintenance to be carried out as per the
requirement.(must provide ground protection to avoid soil
contamination)
After the completion of maintenance the hazardous waste
must be disposed as per local authority regulation(Waste
management plan)
Use of trained personnel Project Manager
Good house keeping
Medium Barricading the area Low Site Engineer Engineer
Use of Leakage
12. Proper ventilation
Chemicals Use of required PPE
Spillage / spray of Chemicals (2x3=6) (1x3=3) Site supervisor Supervisor
Inspection
Proper packaging and storage HSE team
Follow the instructions from MSDS/COSHH.
Environmental Risk Assessment
01 Waste/Refuse Contaminated soil, Medium The use of small water bottles will be limited and the use of Low Site Engineer Project Manager
if found water dispenser and reusable glasses will be enhanced,
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1
especially in offices.
Will try to prohibit the use of plastic carry cases; however it
will be reduced to maximum possible.
Waste collection, segregation, storage and disposal will be in
compliance to project.
No littering and good housekeeping will be maintained at all Engineer
times.
Food waste (3x3=9) (1x3=3) Site supervisor Supervisor
Incompatible waste will not be mixed or transported
together.
Polyethene waste, if any HSE team
No waste will transport to other Emirates.
Changing of oil and grease is prohibited. On emergency
cases, it will be undertaken in a designated hard standing
area provided with drip trays.
Onsite vehicle and equipment maintenance is prohibited.
Traffic
Vehicles will be switched off when not in use. Project Manager
Auxiliary units such as Containers of fuel, chemicals and paints will always be
generators Medium covered (lid closed) when not in use. Low Site Engineer Engineer
02 Air pollution Toilets will be regularly cleaned and managed
Solvents (3x3=9) Trained HSE personnel on site to make sure the effective (1x3=3) Site supervisor Supervisor
implementation of mitigation measures
Release of gaseous Adequate training HSE team
pollutants. CO, SOx, NOx Incident reporting
Public nuisance
03 Poisonous Plants Medium Ensure pre mobilization assessment in the area of the Low Site Engineer Project Manager
snakes Animals project activities.
Reptiles (3x3=9) Identify the preventive & protective measures (camel (1x3=3) Site supervisor Engineer
Pests barriers, fencing, removal of the bushes etc.)
Contract No.: ORRO-2012 Date: 15-04-2023
DUBAI MUSIC INSTITUTE
Sheet No.:1
2 - Remote 2 4 6 8 10
OF
3 - Occasional 3 6 9 12 15
SEVERITY WEIGHTING (P 4x C)
4 - Probable 8 12 16 20
1-3 Low (L)
5 - Frequent 5 10 15 20 25
4-9 Medium (M)
10-25 High (H)