Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

YANB

SW

OR
CC
U EXP

ID
PO

ORR
WE
R
RESS

GL C
&W
AT
WAY

CO N
MYAS

ER
GRID

CO

M
RR

ARA
CH

I
MY RID

DO
AN
TAM

G
NE

R
COMMUNITY 2

AS
A CO L2

FU
MM B

TU
UN
7096-CE-A1-1004

T5
GE

RE
ITY NE AH
KK

RA
3 RA
MA

IL
GE LI

AL
BY
COMMUNITY 1 NE ND

IG
US

PA
RA

NM
TR

SS
LI

EN
ND YA Y

-2

T
NB
TA UST CH

IN
EX
HE

T8
U AN

DI
MA RY

PR
AV EX

CA
Y PR NE

ES

TI
IN L3
MAK ES

SW

VE
DU S C ARA
KAH S W

AY
TR GE AY MCO
HE TRA

AL
Y AV NE NS-A

IG
RA RAB

OR
Y

NM
IN LI IANCORRIDOR

GE

RID
DU

EN
ND
ST

NE

T
US

OR
RY

RA
HE TR

ZC
AV Y

L IN
Y

EL

AJI
IN

CH
YA

DU
NN
DU

MA
HA

NB

AN
S
ST

TR
LC

NE
RY

RA

Y
EX

L2
CO
NT

PR
CE
TA

A
AM
ES
MA

G
IN

AR
SW
IST
EX
SWCC POWER & WATER CORRIDOR

AY
RED SEA
10
METER

WIDE
SWCC
CORRIDOR

SW
SURVEY LIMIT CC

KEY PLAN
NOTES
1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE NOTED.
2. LEVELS AND ELEVATIONS ARE IN METERS BASED ON MYAS LOCAL DATUM.
3. COORDINATES ARE BASED ON MYAS ARBITRARY LOCAL GRID SYSTEM.
4. TOPOGRAPHIC SURVEY IS PROVIDED BY RC YANBU AND WAS CARRIED
ARAMCO CORRIDOR OUT IN OCTOBER, 2021

.50
14.50

17
16.50

0
18.5

0
0

19.0
0
18.
LEGEND

17.00
LIMIT OF WORK LIMIT OF WORK
RC BOUNDARY
LIMIT OF WORK
17.50
15. EXISTING SPOT ELEVATION
50
FOR CONTINUATION SEE DWG NO.7096 - CE - A1 - 1202

14.50 21.00 EXISTING CONTOURS


0
0
13.5 14.5 15.00
13.50
SURVEY LIMITS
12.00

14.50 14
0

15.0

11.50
13.50
.50
0

14
11.5

DUMPING HIGH VOLTAGE OVERHEAD TOWER


.5

13
0

.0
11.50

15.00

0
0
13.5
11.50

13.50 E HIGH VOLTAGE ELECTRIC LINES


0
13.00

0
13.5
11.

13.0

14
13.00
12

13.00
50

DUMPING

.00
420.0
DEMOLITION PLAN - LOCAL TRACK AND EMBANKMENT

ROW
.50
.00

13.00

0
.0
11

13

15
13
.00

11.
.0

0
13.50
11.5
.50
00
0

13
12.00 13 REFERENCE DRAWINGS

.5
0
14.00 DRAWING NO. DRAWING TITLE REV
12.5
12.00 0 0 7096-CE-A1-1202DEMOLATION PLAN - LOCAL TRACK AND EMBANKMENT
F
14.0

15.50
7096-CE-A1-1204DEMOLATION PLAN - LOCAL TRACK AND EMBANKMENT
F
50
11.

EDGE OF ROAD
0
.5

16
12

.50
.50

12.5013.00 0 50 100 150 200 250m


11

0
13.514
12.50 .0104 SCALE IN METERS SCALE = 1 : 2500
.50

.00
17
LIMIT OF WORK LIMIT OF WORK
This drawing and the design it covers are the property of the
Royal Commission for Jubail and Yanbu, Royal Commission
at Yanbu. These drawings are loaned on the borrower's
express agreement that they will not be reproduced, copied,
loaned, exhibited or used except in the limited way, if any,
0 permitted by written consent of the Royal Commission.
.0
17

18.00
19.50
0
17.5
F DEC 2022 SC ISSUED FOR 100% DESIGN REVIEW
E OCT 2022 SC ISSUED FOR 90% REVISED DESIGN REVIEW
D AUG 2022 SC ISSUED FOR 90% DESIGN REVIEW
C JUL 2022 SC ISSUED FOR 60% DESIGN REVIEW
B JUN 2022 SC ISSUED FOR 30% REVISED DESIGN REVIEW
A APR 2022 SC ISSUED FOR 30% DESIGN REVIEW
NO. DATE BY DESCRIPTION APPROVED BY

LINE
KINGDOM OF SAUDI ARABIA

D PIPE
18.00.50
Royal Commission for Jubail and Yanbu

DARY
18.50 17.50
17.00 17.00
18

GROUN

BI A
Royal Commission at Yanbu

KIN
17.00
D

RA
G
WORK
M A
O F S A U DI

RC BOUN

O
MADINAT YANBU AL-SINAIYAH
50
15.

UNDER
19.

DRAWING TITLE

LIMIT OF
13.50

00

CONSTRUCTION OF FLOOD MITIGATION CHANNEL PHASE 2A & 3C


18 15.00
17.50

18
.50

.00
.5
16.00
14.00

16

0
0

50
14.5

DEMOLITION PLAN - LOCAL TRACK AND EMBANKMENT

19.50
16.

8.00
117.50
17.00

15.00 ARA

17.00
MCO COR
15.00

RIDOR
18
CHANNE5L.0

LIMIT
R.O.W
DESIGNED BY: M.SALMAN

DRAWN BY: Imtiaz Alam


SAUDI CONSULTING SERVICES Co.
ENGINEERING CONSULTANTS

SURVEY
CHECKED BY: S.Asim Ali

PROJ. MGR.: M. Alam Shahzad


Engineer Dr. Tarek M.A. Shawaf

19.00
QA/QC. MGR.: Syed Asim Ali
CR (1010322156)

A/E APPROVAL :M. Alam Shahzad WBS NO. DRAWING No.

FOR CONTINUATION SEE DWG NO.7096 - CE - A1 - 1204 R. C. APPROVAL:Yousef M. Abuaskar CONT. NO. PIC I - T - 7096 7096 - CE - A1 - 1203
DATE December 2022 SCALE 1:2500 REV No. F

You might also like