1rev 0 - 0039 Suzuki Indomobil Plant Cakung Pak Siswo - PT - Parker Engineering
1rev 0 - 0039 Suzuki Indomobil Plant Cakung Pak Siswo - PT - Parker Engineering
1rev 0 - 0039 Suzuki Indomobil Plant Cakung Pak Siswo - PT - Parker Engineering
SENOPATI SEJATI
MANUFACTURING & ENGINEERING
Jl. Pulogadung I No. 9-11, Kawasan Industri Pulogadung, Jakarta Timur
Phone : +62 21 4608182, Fax : +62 21 4608183
Email : info@senopatisejati.com, website : www.senopatisejati.com
Kepada :
PT. PARKER ENGINEERING INDONESIA
Telp. : +62 21 - 7884 8033
Fax. : +62 21 - 7884 8030
attn. : Mr. Siswo
cc. :
Dear Sir,
We would like to submit quotation as per your requirement SUZUKI TAMBUN PROJECT
The scope of work and spesification are listed below :
No. Description Qty Unit Price TOTAL PRICE
B. LOADING PREPARATION
a. Palleting and packaging c/w packing list 1 Ls 84.760.000 84.760.000
b. Wrapping and belting equipment 1 Ls 32.400.000 32.400.000
c. Pre-cleaning before packaging 1 Ls 12.500.000 12.500.000
d. Re-check broken part or old/fatique equipment which 1 Ls 8.700.000 8.700.000
cannot re-used
SUB TOTAL B 138.360.000
C. EXPEDITION /DELIVERY TO SUZUKI TAMBUN
a. Loading all equipment / part section assy 1 Ls 48.760.000 48.760.000
b. Heavy duty / forklift rent 1 Ls 18.600.000 18.600.000
c. Delivery / Transporting to Suzuki Tambun 1 Ls 42.640.000 42.640.000
d. Expedition Insurance Cost 1 Ls 17.670.000 17.670.000
e. Police forwarder patrol 1 Ls 16.480.000 16.480.000
f. Tol/High way cost 1 Ls 4.200.000 4.200.000
g. Society / LSM / CSR Cost 1 Ls 12.400.000 12.400.000
h. Safety Protection Belting 1 Ls 14.600.000 14.600.000
i. Safety Protection wooden dumper skirt 1 Ls 8.760.000 8.760.000
SUB TOTAL C 184.110.000
D. UNLOADING ON SUZUKI - TAMBUN I
1. Heavy duty / forklift / handlift 1 Ls 18.600.000 18.600.000
2. Unloading all equipment c/w C5R 1 Ls 24.680.000 24.680.000
3. Recheck mark and cleaning 1 Ls 8.700.000 8.700.000
SUB TOTAL D 51.980.000
Exclude Electrical Scopes TOTAL I (A,B,C,D) 680.332.000
II.) SUZUKI INDOMOBIL PLANT-1 TAMBUN
A. PHOSPATE SETTLING TANK SYSTEM
1. FABRICATION NEW SETTLING TANK 1 unit 76.420.000 76.420.000
Dimension : Upper Square 1250 x 1100 x H1800 [mm]
Lower pyramid 1250 x 1100 x H400 // DN65 [mm]
Leg : H1400mm (4 ea) RHS100, Frame RHS50
Material : Shell body SUS 304 t.2mm thk
Inside membran plate : SUS 304 t.1,2mm thk
Membran Raill : SUS 304 L30 x 30 x 2mm thk
Nozzles :
- Measuring Box 50A SUS 304 Inlet
- Overflow 65A SUS 304 JIS10K
- Return 65A SUS 304 JIS10K
- Drain 65A SUS 304 JIS10K
- Air Nozzle 25A SUS 304 NPT #1000
Air Spray distribution header 25A SUS 304
Exclude :
- Accessories valve
- Instrument control
- Electrical and civil works
SUB TOTAL II A -1 76.420.000
2. SETTLING TANK PIPE LINES
a. Inlet lines DN50 SUS 304 SCH10S c/w fittings 1 Ls 16.744.000 16.744.000
b. Overflow DN65 SUS 304 SCH10S c/w fittings 1 Ls 21.620.000 21.620.000
c. Return line DN65 SUS 304 SCH10S c/w fittings 1 Ls 19.460.000 19.460.000
d. Supply to exceller filter DN40 SUS 304 c/w fittings 1 Ls 4.860.000 4.860.000
e. Drain line DN65 SUS 304 SCH10S c/w fittings 1 Ls 3.200.000 3.200.000
f. Air spray Distribution line SGP DN25 c/w fittings 1 Ls 14.465.000 14.465.000
g. Air spray for drain clogging SGP DN25 c/w fittings 1 Ls 6.760.000 6.760.000
h. Pump Discharge line DN65 SUS 304 SCH10S c/w fittings 1 Ls 16.745.000 16.745.000
i. Pump bypass line DN50 SUS 304 SCH10S c/w fittings 1 Ls 14.224.000 14.224.000
j. Finishing, passivating, general cleaning 1 Ls 3.420.000 3.420.000
k. Leak Test and commissioning 1 Ls 2.800.000 2.800.000
SUB TOTAL II A -2 124.298.000
3. INSTALLATION WORKS
a. Install of new settling tank ass'y 1 Ls 12.400.000 12.400.000
b. Install of new exceller filter ass'y 1 Ls 6.700.000 6.700.000
c. Install filter line pipe DN40 SUS 304 (Outlet) 1 Ls 14.860.000 14.860.000
d. Box for Exceller filter waste 1 Ls 11.400.000 11.400.000
e. Install new settling tank cent. Pump 1 Ls 5.200.000 5.200.000
f. Piping for settling tank pump SUS 304 1 Ls 4.620.000 4.620.000
g. Commissioning test ass'y 1 Ls 3.500.000 3.500.000
SUB TOTAL II A -3 58.680.000
SUB TOTAL II A (1,2,3) 259.398.000
B. TAMBUN PLANT CLEARING AREA PROJECT
1. Dismantling of mezzanine pillar c/w Access 1 Ls 159.550.000 159.550.000
Deck and railling W2000 x L72000 x H4800 [mm]
2. Dismantling highbay lamp, tray, etc 1 Ls 14.744.000 14.744.000
3. Clearing ex. Anchore and floor bolts 1 Ls 6.800.000 6.800.000
4. Remove and dismantling wall access door W1500xH5000 [mm] 1 Ls 12.800.000 12.800.000
5. General cleaning and marking floor 1 Ls 16.700.000 16.700.000
SUB TOTAL II B 210.594.000
C. RECONDITION 2nd FLOOR HEATER TANK
1. Recondition body shell plate ass'y 1 Ls 16.862.000 16.862.000
700 x 1100 x H1200 [mm]
2. Steam line piping SUS 304 DN25, DN32 SCH40 1 Ls 12.460.000 12.460.000
3. Installation sterm accessories valve and actuator ass'y 3 Ls 6.270.000 18.810.000
(material by PEI)
4. Body shell insullation rockwool t.50mm density 80kg/m3, 1 Ls 12.420.000 12.420.000
c/w cladding al sheet 0,6mm thk
5. General cleaning and Leak Test 1 Ls 6.774.000 6.774.000
SUB TOTAL II C 67.326.000
D. INSTALLATION PRE-TREATMENT CR3+ ASS'Y
1. Installation of Gridder Hoist Assy 1 Ls 67.840.000 67.840.000
2. Installation of Hoist Crane 1 Ls 12.460.000 12.460.000
3. Installation square tank ass'y 8 Ls 1.400.000 11.200.000
4. Installation access deck and railling 1 Ls 28.620.000 28.620.000
5. Installation of pipe lines ass'y 1 Ls 36.880.000 36.880.000
6. Installation pump and accessories 1 Ls 12.860.000 12.860.000
7. Installation ducting, blower ass'y 1 Ls 18.700.000 18.700.000
8. Pipe support and duct hanger assy 1 Ls 14.600.000 14.600.000
SUB TOTAL II D 203.160.000
E. INSTALLATION OF DRY OVEN ASSY
1. Install/assembly dry oven body 1 Ls 26.870.000 26.870.000
2. Installation of gas line pipes c/w accessories 1 Ls 18.700.000 18.700.000
3. Install air duct lines discharge and suction 1 Ls 14.670.000 14.670.000
4. Install IDF Blower assy 1 Ls 11.400.000 11.400.000
5. Install floor trolly rail assy 1 Ls 4.600.000 4.600.000
6. Additional rail to paint booth joint 1 Ls 14.700.000 14.700.000
7. Install trolley and basket ass'y 1 Ls 3.600.000 3.600.000
8. Install furnace burner assy 1 Ls 14.200.000 14.200.000
9. Install air filter assy 1 Ls 8.200.000 8.200.000
10. Testing and commissioning 1 Ls 6.000.000 6.000.000
SUB TOTAL II E 122.940.000
TOTAL II (A,B,C,D,E) 863.418.000
III). FINISHING
1. General Clearing / finishing all item 1 Ls 14.870.000 14.870.000
2. Touch Up painting / repainting 1 Ls 27.460.000 27.460.000
- Struktur / construction
- Ducting
- Piping lines
- Pipe Support
SUB TOTAL III 42.330.000
NOTE : GRAND TOTAL I, II, III 1.586.080.000
Term Of Condition:
1. Nett Price Franco Jabodetabek and exclude Ppn 10%
2. Working Schedule as per requirement
3. Payment DP 40%, Progres 30%, full payment 30% one week after invoice
4. Price Validity 14 days
Best Regards,
Agung H