BIIT-04 Testing Bushings With Two Taps Galera PPT
BIIT-04 Testing Bushings With Two Taps Galera PPT
BIIT-04 Testing Bushings With Two Taps Galera PPT
Offer by:
Reynaldo Galera
Doble Engineering
Brazil
Scope
• The objective of this paper is to
establish
t bli h a standard,
t d d safe f and
d
practical procedure to measure all
capacitances
it in
i a two
t tap
t bushing.
b hi
• Although this is a new procedure,
there are many manufactures that
have made this typey of bushing g at
least as far back as 1983.
C2
BIIT- Test Procedure for Two Tap Bushing
Definition
• Test tap
– Definition per IEEE
C57.19.00.37
bushing test tap: A
connection to one of
the conducting layers
of a capacitance-
graded bushing for
measurement of
partial discharge, C1
power factor
factor, and
capacitance values.
C2
• C2||C3
– With cap on Potential Tap and Test Tap energized C3
is measured in parallel with C2
ELTRONORTE
PLENA TRANSMISSORA
CHESF
AREVA TRANSFORMERS
For g
givingg me pictures,
p , test
results, answering questions
and partnership.