PLS 160216 : Bunut to Madamit 275kV TL Project

Master Tower Schedule (April 2023)

Sl. Tower Body Leg Extn. Span Length Weight Span Stringing Sections
Type Angle Fdn. Class
No. No. Ext. A B C D ahead (m) COLD HOT OPGW Conductor
466 PAT1 2HA +15 +3 +2 +2 +0 329.62 618.00 519.00 40° 34' 17"R LIGHT
3634.45 3634.45
467 PT1/1 2NS +15 +3 +3 +0 +0 174.51 336.00 321.00 LIGHT
468 PAT1A 2HA +6 +3 +2 +0 +0 336.61 47.00 110.00 34° 26' 12"L LIGHT
469 PAT1B 2MA +6 +2 +3 +0 +3 653.25 55.00 117.00 25° 9' 40"R LIGHT
470 PAT1C 2LA +6 +0 -1 +3 +3 543.36 297.00 328.00 2° 16' 22"L LIGHT
471 PAT1D 2LA +0 +0 +1 +3 +0 458.70 852.00 823.00 0° 7' 4"L LIGHT
3881.04
472 PT1D/1 2HS +3 +1 +0 +0 +1 610.20 839.00 816.00 HEAVY
473 PT1D/2 2LA +0 -1 +2 +1 +3 237.89 229.00 245.00 LIGHT
5803.20
474 PT1D/3 2HS +3 +1 +1 +3 +2 708.33 437.00 440.00 LIGHT
475 PT1D/4 2HS -3 +3 +1 +2 +0 332.70 806.00 786.00 LIGHT
476 PAT2 2HA +6 +3 +3 +0 -2 490.87 626.00 602.00 39° 13' 34"L LIGHT
477 PAT2A 2MA +6 +2 +3 -2 -1 542.71 10.00 61.00 13° 8' 42"L LIGHT
1922.16
478 PAT2B 2LA +9 -2 +3 -1 +3 374.08 494.00 494.00 6° 14' 34"R LIGHT
479 PT2/2 2HS +3 +1 +3 +3 +3 514.49 603.00 587.00 LIGHT
480 PAT3 2HA +0 +2 -2 +3 +3 432.09 509.00 509.00 47° 39' 40"L LIGHT
481 PT3/1 2HS +3 -2 +1 +3 +2 626.78 448.00 455.00 LIGHT
482 PT3/2 2LA +15 -2 +3 +2 +3 271.23 291.00 318.00 LIGHT
483 PT3/3 2HS +15 -2 +2 +3 +0 350.23 706.00 633.00 LIGHT
484 PAT4A 2HA +12 -2 +3 +0 +0 388.33 376.00 389.00 34° 10' 23"L LIGHT
485 PAT4B 2MA +3 +3 +2 +0 -2 270.76 315.00 296.00 10° 32' 20"L LIGHT
486 PT4B/1 2LA +3 +0 -2 -2 +3 346.11 -29.00 44.00 LIGHT
487 PAT4C 2MA +0 +2 +2 +3 -2 226.24 426.00 398.00 27° 2' 32"R LIGHT
488 PT4C/1 2LA +3 +3 -2 -2 -2 228.79 -130.00 -25.00 LIGHT 5616.52 5616.52
489 PT4C/2 2LA +9 +3 -2 -2 +1 88.83 280.00 302.00 LIGHT
490 PAT4D 2LA +3 +2 +3 +1 +2 143.33 602.00 360.00 3° 32' 32"R LIGHT
491 PT4D/1 2LA +15 +1 -1 +2 +0 401.43 23.00 145.00 LIGHT
492 PAT4E 2LA +3 +2 +0 +0 +0 430.08 286.00 302.00 3° 21' 30"L LIGHT
493 PAT4F 2LA +0 +2 +2 +0 +1 559.05 449.00 449.00 2° 24' 9"R LIGHT
494 PT4F/1 2HS +0 +3 -1 +1 +3 594.50 843.00 825.00 LIGHT
495 PT4F/2 2LA +12 -1 +0 +3 +3 258.73 -84.00 29.00 LIGHT
496 PT1 2RA +6 +3 +0 +2 +3 543.00 438.00 LIGHT