Assignment 2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1.

Determine the probability that the annual maximum discharge at the river
gaugings tation (Table 5.1) will equal or exceed 4000 cumec at least once
in the next five years. Assume the return period of 4000 cumec discharge
is 3.625 years.
2. Consider the annual maximum flood discharge data at a river gauging
station over a time period of 40 years as shown in Table 5.1. Construct the
flood frequency plot, and estimate the following:
(a) Flood magnitude with return period 10 years, 50 years, and 100 years;
(b) Return period of a flood with 4000 cumec magnitude.

You might also like