Professional Documents
Culture Documents
Plumbing
Plumbing
3 Lain Lain
a. set up pompa distribusi lot 800,000.00
b. galian meter 75,000.00
c. bobokan meter 20,000.00
d. testing and commissioning titik 1,000,000.00
e. instalasi sistem pool lot 4,000,000.00