Thank you for your kind interest of Jazeera Paints. Regarding to the previous painting system, please
find below our application guide (Method of Statement) for the recommended Specification 09900
(master Builder & steel structural) painting system.
Jazeera Paints Services (Coating Inspection) cover all stages of a coating application including:
x Surface preparation.
x Material inspection and mixing.
x During and after the prime coat.
x During and after the filler (putty) coat.
x During and after each coat of the top coat (1st, 2nd ..etc).
We wish the information will help you and note that we can provide a technical training to apply any
kind of paint we supply.
^d/KEϬϵϵϭϬϬͲW/Ed/E'
WZdϭ'EZ>
Notes:
The surface shall be repaired by Grinding for all joints, Filling Hair Cracks, pinholes, leveling and smoothing by Jazeera
Matrix
* Jazeera Matrix According to the surface need 1-2 mm 100 0.5 – 1.0 kg/m²
The Coverage of Jazeera Matrix: (Coverage is varying according to surface condition) 0.5 – 1.0 kg/m² (Hand trowel – smooth application)
1. Surface Preparation
-Remove dust, oil, grease, loose materials and paints which may affect adhesion with the substrate.
-Moisten the surface with clean water prior to application.
2. System Application Steps
According to the Apply of “ Jazeera Matrix ” to the recommended DFT. and please refer to the following instructions:
surface need
Application Guide
•Apply by putty knife or by hand trowel with a maximum thickness of 1-2 mm . (Several coats can be applied).
•Use the mixture within 3 hrs from mixing.
• The applied product should be cured with soft water spray after 12 hours from application for the first two
days.
MIXING •Pour the right amount of water (9.5 – 10.5 liters / 25 kg bag) into a clean container.
•Add the powder (25kg bag) to water slowly while mixing with a mechanical mixer on low
speed.
•Continue mixing for 3 minutes until getting uniform, lump-free mix and no powder stuck to
the side and bottom of the mixing container.
•Small quantities up to 5kg can be mixed manually .
• Leave the mixture for 10-15 minutes then remix again, now the product is ready for use.
Application Tools •Putty knife .
•Hand trowel.
• Spray machine
1. Surface Preparation
Pre-Cleaning Remove all visible surface deposits such as grease, oils and soils with suitable detergent. Remove salt and
other contaminants by washing using fresh water.
2. System Application Steps
Coat No. 1 Apply one coat of “Jazeera Green Prime” to the recommended DFT of 25 μm. and please refer to the following
instructions:
2.1 Recommended Thinner Tap Water.
2.2 Application Tool and Thinning Ratio See the table below:
Application Method Air Spray Brush/Roller**
Thinning (by volume) 15-25 % 10-15 %
Nozzle Orifice (1.5-1.8) mm N/A
Nozzle Pressure N/A N/A
Spray Angle N/A N/A
Coat No. 2&3 Apply two coats of “Jazeera Putty” to the recommended DFT of 100 μm. and please refer to the following
instructions:
2.1 Recommended Thinner Tap Water
2.2 Application Tool and Thinning Ratio Not Recommended (Ready to Use)
Coat No. 4 Apply one coat of “Jazeera Green Anti Microbic Matt” to the recommended DFT of 30 μm. and please refer to
the following instructions:
2.1 Recommended Thinner Tap Water.
2.2 Application Tool and Thinning Ratio See the table below:
Application Method Air Spray Airless spray Brush/Roller**
Thinning (by volume) 10-15 % 0-10 % 10-15 %
Nozzle Orifice (1.5-1.8) mm 0.015-0.021" N/A
Nozzle Pressure N/A 15 MPa (2100psi) N/A
Spray Angle N/A 40-60 N/A
Coat No. 5 Apply one coat of “Jazeera Green Anti Microbic Matt” to the recommended DFT of 30 μm. and please refer to
the above instruction of the Third coat.
Apply “Jazeera Gypsoneat ” for joints between gypsum board and whole surfaces of it.
Recommended Thinner Tap Water
Application Tool and Thinning Ratio Not Recommended (Ready to Use)
1. Surface Preparation
Pre-Cleaning Remove all visible surface deposits such as grease, oils and soils with suitable detergent. Remove salt and
other contaminants by washing using fresh water.
2. System Application Steps
Coat No. 1 Apply one coat of “Jazeera Green Prime” to the recommended DFT of 30 μm. and please refer to the following
instructions:
2.1 Recommended Thinner Tap Water.
2.2 Application Tool and Thinning Ratio See the table below:
Application Method Air Spray Brush/Roller**
Thinning (by volume) 15-25 % 10-15 %
Nozzle Orifice (1.5-1.8) mm N/A
Nozzle Pressure N/A N/A
Spray Angle N/A N/A
Coat No. 2 Apply one coat of “Jazeera Putty” to the recommended DFT of 100 μm. and please refer to the following
instructions:
2.1 Recommended Thinner Tap Water
2.2 Application Tool and Thinning Ratio Not Recommended (Ready to Use)
Coat No. 3 Apply one coat of “Jazeera Green Anti Microbic Matt” to the recommended DFT of 30 μm. and please refer to
the following instructions:
2.1 Recommended Thinner Tap Water.
2.2 Application Tool and Thinning Ratio See the table below:
Application Method Air Spray Airless spray Brush/Roller**
Thinning (by volume) 10-15 % 0-10 % 10-15 %
Nozzle Orifice (1.5-1.8) mm 0.015-0.019" N/A
Nozzle Pressure N/A 15 MPa (2100psi) N/A
Spray Angle N/A 40-60 N/A
Coat No. 4 Apply one coat of “Jazeera Green Anti Microbic Matt” to the recommended DFT of 30 μm. and please refer to
the above instruction of the Third coat.
The Coverage of Jazeera Matrix: (Coverage is varying according to surface condition) 0.5 – 1.0 kg/m² (Hand trowel – smooth application)
1. Surface Preparation
-Remove dust, oil, grease, loose materials and paints which may affect adhesion with the substrate.
-Moisten the surface with clean water prior to application.
2. System Application Steps
According to the Apply of “ Jazeera Matrix ” to the recommended DFT. and please refer to the following instructions:
surface need
Application Guide
•Apply by putty knife or by hand trowel with a maximum thickness of 1-2 mm . (Several coats can be applied).
•Use the mixture within 3 hrs from mixing.
• The applied product should be cured with soft water spray after 12 hours from application for the first two
days.
MIXING •Pour the right amount of water (9.5 – 10.5 liters / 25 kg bag) into a clean container.
•Add the powder (25kg bag) to water slowly while mixing with a mechanical mixer on low
speed.
•Continue mixing for 3 minutes until getting uniform, lump-free mix and no powder stuck to
the side and bottom of the mixing container.
•Small quantities up to 5kg can be mixed manually .
• Leave the mixture for 10-15 minutes then remix again, now the product is ready for use.
Application Tools •Putty knife .
•Hand trowel.
• Spray machine
1. Surface Preparation
Pre-Cleaning Remove all visible surface deposits such as grease, oils and soils with suitable detergent. Remove salt and
other contaminants by washing using fresh water.
2. System Application Steps
Coat No. 1 Apply one coat of “Jazeera Green Prime” to the recommended DFT of 25 μm. and please refer to the following
instructions:
2.1 Recommended Thinner Tap Water.
2.2 Application Tool and Thinning Ratio See the table below:
Application Method Air Spray Brush/Roller**
Thinning (by volume) 15-25 % 10-15 %
Nozzle Orifice (1.5-1.8) mm N/A
Nozzle Pressure N/A N/A
Spray Angle N/A N/A
Coat No. 2&3 Apply two coats of “Jazeera Putty” to the recommended DFT of 100 μm. and please refer to the following
instructions:
2.1 Recommended Thinner Tap Water
2.2 Application Tool and Thinning Ratio Not Recommended (Ready to Use)
Coat No. 4 Apply one coat of “Jazeera Green Anti Microbic” to the recommended DFT of 30 μm. and please refer to the
following instructions:
2.1 Recommended Thinner Tap Water.
2.2 Application Tool and Thinning Ratio See the table below:
Application Method Air Spray Airless spray Brush/Roller**
Thinning (by volume) 10-15 % 0-10 % 10-15 %
Nozzle Orifice (1.5-1.8) mm 0.015-0.021" N/A
Nozzle Pressure N/A 15 MPa (2100psi) N/A
Spray Angle N/A 40-60 N/A
Coat No. 5 Apply one coat of “Jazeera Green Anti Microbic” to the recommended DFT of 30 μm. and please refer to the
above instruction of the Third coat.
Apply “Jazeera Gypsoneat ” for joints between gypsum board and whole surfaces of it.
Recommended Thinner Tap Water
Application Tool and Thinning Ratio Not Recommended (Ready to Use)
1. Surface Preparation
Pre-Cleaning Remove all visible surface deposits such as grease, oils and soils with suitable detergent. Remove salt and
other contaminants by washing using fresh water.
2. System Application Steps
Coat No. 1 Apply one coat of “Jazeera Green Prime” to the recommended DFT of 30 μm. and please refer to the following
instructions:
2.1 Recommended Thinner Tap Water.
2.2 Application Tool and Thinning Ratio See the table below:
Application Method Air Spray Brush/Roller**
Thinning (by volume) 15-25 % 10-15 %
Nozzle Orifice (1.5-1.8) mm N/A
Nozzle Pressure N/A N/A
Spray Angle N/A N/A
Coat No. 2 Apply one coat of “Jazeera Putty” to the recommended DFT of 100 μm. and please refer to the following
instructions:
2.1 Recommended Thinner Tap Water
2.2 Application Tool and Thinning Ratio Not Recommended (Ready to Use)
Coat No. 3 Apply one coat of “Jazeera Green Anti Microbic” to the recommended DFT of 30 μm. and please refer to the
following instructions:
2.1 Recommended Thinner Tap Water.
2.2 Application Tool and Thinning Ratio See the table below:
Application Method Air Spray Airless spray Brush/Roller**
Thinning (by volume) 10-15 % 0-10 % 10-15 %
Nozzle Orifice (1.5-1.8) mm 0.015-0.019" N/A
Nozzle Pressure N/A 15 MPa (2100psi) N/A
Spray Angle N/A 40-60 N/A
Coat No. 4 Apply one coat of “Jazeera Green Anti Microbic” to the recommended DFT of 30 μm. and please refer to the
above instruction of the Third coat.
Notes:
The practical spreading rate of the Jazeera Worood depends on the surface, ambient temperature, application method,
actual DFT and the wasted amount. (To avoid waste, be sure to buy the right amount of the paint for the required
surface area).
The surface shall be repaired by Grinding for all joints, Filling Hair Cracks, pinholes, leveling and smoothing by Jazeera
Matrix
* Jazeera Matrix According to the surface need 1-2 mm 100 0.5 – 1.0 kg/m²
The Coverage of Jazeera Matrix: (Coverage is varying according to surface condition) 0.5 – 1.0 kg/m² (Hand trowel – smooth application)
1. Surface Preparation
-Remove dust, oil, grease, loose materials and paints which may affect adhesion with the substrate.
-Moisten the surface with clean water prior to application.
2. System Application Steps
According to the Apply of “ Jazeera Matrix ” to the recommended DFT. and please refer to the following instructions:
surface need
Application Guide
•Apply by putty knife or by hand trowel with a maximum thickness of 1-2 mm . (Several coats can be applied).
•Use the mixture within 3 hrs from mixing.
• The applied product should be cured with soft water spray after 12 hours from application for the first two
days.
MIXING •Pour the right amount of water (9.5 – 10.5 liters / 25 kg bag) into a clean container.
•Add the powder (25kg bag) to water slowly while mixing with a mechanical mixer on low
speed.
•Continue mixing for 3 minutes until getting uniform, lump-free mix and no powder stuck to
the side and bottom of the mixing container.
•Small quantities up to 5kg can be mixed manually .
• Leave the mixture for 10-15 minutes then remix again, now the product is ready for use.
Application Tools •Putty knife .
•Hand trowel.
• Spray machine
1. Surface Preparation
Pre-Cleaning Remove all visible surface deposits such as grease, oils and soils with suitable detergent. Remove salt and
other contaminants by washing using fresh water.
2. System Application Steps
Coat No. 1 Apply one coat of “Jazeera Green Prime” to the recommended DFT of 25 μm. and please refer to the following
instructions:
2.1 Recommended Thinner Tap Water.
2.2 Application Tool and Thinning Ratio See the table below:
Application Method Air Spray Brush/Roller**
Thinning (by volume) 15-25 % 10-15 %
Nozzle Orifice (1.5-1.8) mm N/A
Nozzle Pressure N/A N/A
Spray Angle N/A N/A
Coat No. 2&3 Apply two coats of “Jazeera Putty” to the recommended DFT of 100 μm. and please refer to the following
instructions:
2.1 Recommended Thinner Tap Water
2.2 Application Tool and Thinning Ratio Not Recommended (Ready to Use)
Coat No. 4 Apply one coat of “Jazeera Green Silk” to the recommended DFT of 30 μm. and please refer to the following
instructions:
2.1 Recommended Thinner Tap Water.
2.2 Application Tool and Thinning Ratio See the table below:
Application Method Air Spray Airless spray Brush/Roller**
Thinning (by volume) 15-25 % 0-10 % 10-15 %
Nozzle Orifice (1.5-1.8) mm 0.015-0.019" N/A
Nozzle Pressure N/A 15 MPa (2100psi) N/A
Spray Angle N/A 40-60 N/A
Coat No. 5&6 Apply two coats of “Jazeera Worood” to the recommended DFT, and please refer to the following instructions:
2.1 Recommended Thinner Not recommended.
2.2 Thinning Ratio Ready to use.
2.3 Application Tool Sponge & Trowel / Special type
Apply “Jazeera Gypsoneat ” for joints between gypsum board and whole surfaces of it.
Recommended Thinner Tap Water
Application Tool and Thinning Ratio Not Recommended (Ready to Use)
1. Surface Preparation
Pre-Cleaning Remove all visible surface deposits such as grease, oils and soils with suitable detergent. Remove salt and
other contaminants by washing using fresh water.
2. System Application Steps
Coat No. 1 Apply one coat of “Jazeera Green Prime” to the recommended DFT of 25 μm. and please refer to the following
instructions:
2.1 Recommended Thinner Tap Water.
2.2 Application Tool and Thinning Ratio See the table below:
Application Method Air Spray Brush/Roller**
Thinning (by volume) 15-25 % 10-15 %
Nozzle Orifice (1.5-1.8) mm N/A
Nozzle Pressure N/A N/A
Spray Angle N/A N/A
Coat No. 2 Apply one coat of “Jazeera Putty” to the recommended DFT of 100 μm. and please refer to the following
instructions:
2.1 Recommended Thinner Tap Water
2.2 Application Tool and Thinning Ratio Not Recommended (Ready to Use)
Coat No. 3 Apply one coat of “Jazeera Green Silk” to the recommended DFT of 30 μm. and please refer to the following
instructions:
2.1 Recommended Thinner Tap Water.
2.2 Application Tool and Thinning Ratio See the table below:
Application Method Air Spray Airless spray Brush/Roller**
Thinning (by volume) 15-25 % 0-10 % 10-15 %
Nozzle Orifice (1.5-1.8) mm 0.015-0.019" N/A
Nozzle Pressure N/A 15 MPa (2100psi) N/A
Spray Angle N/A 40-60 N/A
Coat No. 4&5 Apply two coats of “Jazeera Worood” to the recommended DFT, and please refer to the following instructions:
2.1 Recommended Thinner Not recommended.
2.2 Thinning Ratio Ready to use.
2.3 Application Tool Sponge & Trowel / Special type