19 20 21 22 23 24 25 26 27 28

NOTES:

1. THE MAXIMUM SINGLE CONTINUOUS


LENGTH OF ALL LINEAR LIGHTS (TYPE L)
SHALL NOT BE MORE THAT 3m.

2. ALL LINEAR LIGHTS MORE THAN 3m IN


LENGHT SHALL BE BROKEN DOWN INTO
EQUAL SEGMENTS OF NOT MORE THAN
3m.

3. REFER
A DRAWINGS 12-A-114-E-EG0091
AND 12-A-114-E-EG0092 FOR SOFFITBAY-DB-18(L) BAY-ESSB-07(L)
LIGHTING CIRCUITING. R1 R1
B
BAY-ESSB-07(L) BAY-ESSB-07(L) BAY-ESSB-07
BAY-ESSB-07(L)
R1 W1
B1
BAY-DB-18 HR1
HR1
L2 BAY-UDB-07
H H
L2 L2 H
ARROW INDICATES DIRECTION
G G
OF BREAKING POLE
2

WM
1

1
WM
F1 F1 WC D2 D2 ELEC
? LP5 LP5
BAY-ESSB-07(L)
2 R2
C STAFF OFFICE MECH

2
H F1 F1 COMS
? TEA ? D2
LP5 LP5

2
CTRL D2
2
2DK WM
1 BAY-ESSB-07(L)
B1
G G H
H H
L2 L2 L2 BAY-ESSB-07(L) HR1 HR1 HR1
R1
BAY-ESSB-07(L)
BAY-DB-18(L)
BAY-ESSB-07(L) W1
B1
W1

BAY-ESSB-07(L)

D BAY-DB-18(L) BAY-ESSB-07(L)
B1

W1 W1

E
FOR CONTINUATION REFER TO DRAWING NUMBER 12-A-114-EG-0096

CL

F
BAY-ESSB-09(L)
R1

G BAY-ESSB-09(L)
B1

2
BAY-ESSB-09(L)
R2
L2 L2 BAY-ESSB-09(L)
BAY-ESSB-09(L) R1 H ARROW INDICATES DIRECTION
L2 HR1 HR1 HR1 HR1
G R1 OF BREAKING POLE HR1 HR1
G H
DAP
BAY-ESSB-09(L)
BAY-UDB-09 D1 D1 LP5 B1
WM

WM
2
1

1
LP5 BAY-ESSB-09 LP5
D1 MECH ELEC.
2

H D1
D1 FB D1 BAY-DB-20
LP5 LP5
CTRL WM
1
2 2
G
G H H BAY-ESSB-09(L)
BAY-ESSB-09(L)
L2 L2 ARROW INDICATES DIRECTION R1
W1 HR1 HR1 HR1 HR1 HR1 HR1
L2 OF BREAKING POLE

BAY-ESSB-09(L) BAY-ESSB-09(L)
B1 B1

I BAY-DB-20(L) BAY-ESSB-09(L)
W1 W1

BAY-ESSB-06(L)
B2

LP4 LP4
LP4 LP4 BAY-ESSB-06(L)
BAY-ESSB-06(L)
LP4 LP4 LP4
B2 B2

1:100 (A1) / 1:200 (A3)


0 1000mm 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 ISSUED FOR CONSTRUCTION
REFERENCES SCALE DESIGNED C.REYES
BAYSWATER STATION & TURNBACK
3 20.09.23 ASSET TAGS/SWITCHBOARD REFERENCE UPDATED CR CR RH JDV As indicated DRAWN C.REYES
2 14.07.23 SWITCHBOARD NAME UPDATED CR CR RH JDV
STATION & STATION PRECINCT
1 30.11.22 UPDATED - ISSUED FOR CONSTRUCTION CR CR RH JDV CHECKED R.HORN
0 08.08.22 ISSUED FOR CONSTRUCTION CR CR RH JDV DATUM LV ELECTRICAL SERVICES
REV DATE AMENDMENT DSN DRN CHK APP APPROVED
ORIG SIZE 0 10 20 30 40 50 100mm This document must not be copied without PTA's written
HORIZONTAL: PCG94
J.D.VILLIERS
PLATFORM ZONE 3 - LIGHTING LAYOUT
VERTICAL: AHD71
A1 AT ORIGINAL PLOT SIZE
permission, and the contents thereof must not be imparted
to a third party nor be used for any unauthorised purpose. DATE 17.08.20 PTA Drawing No: 12-A-114-EG0097 Rev: 3
CAD DRAWING PATHNAME BIM 360://AU-IW237200-Bayswater Station/BAY-EL-BAYSWATER STATION-MDL-RVT-JAC.rvt

You might also like