Professional Documents
Culture Documents
RBI Pipeline Methodology
RBI Pipeline Methodology
Data gathering
PREVENTIVE / CORRECTIVE OR
MINIMAL SURVEILANCE BOTH PoF & CoF
POTENTIAL?
RISK LEVEL
PRELIMINARY YES
CRITICALITY
IRP / MRP
ACCEPTABLE?
INPUT DETAILED
DATA
CONDUCT
INSPECTION
IMMEDIATE INSPECTION
REQUIRED?
CONDUCT REMEDIAL
ACTION