12 11 10 9 8 7 6 5 4 3 2 1

GENERAL NOTES :
1. Refer to 400V Load Center and Motor Control Center Load Schedule for details
(number and rating) of outgoing feeders.
H H
2. Breakers shall be operated electrically or manually.Breaker status (close / test /
available) shall be monitored and controlled by DCS.
3. Refer to 400V Schematic Diagrams for details.
4. The incomings breaker shall have DCS initiated commands.DCS shall monitor
status of breaker (close / test / available).

G G

REFERENCES :
DQR/00/K/001b---004/SD/001 MAIN SINGE LINE DIAGRAM
DQR/00/K/BF----EP24/ES/101 ... 108 400V SCHEMATIC DIAGRAMS
F DQR/00/K/BF----EP24/ES/002 TECHNICAL SPECIFICATION FOR 400V LOAD F
CENTERS AND MCC
DQR/00/K/BF----EP24/EL/001 400V LOAD CENTER AND MOTOR CONTROL
CENTER LOAD SCHEDULE

E E

D D

Revision History

00 18.09.2017 C.B. O.O. T.O. H.S. Issued for Use

B 30.06.2017 C.B. O.O. T.O. H.S. Issued for Review

Rev. Revision Date BY CHK EGS PEM Brief Description

Description Current Version

PROJECT
C C
DHI QAR COMBINED CYCLE
POWER PLANT PROJECT
NASIRIYAH, IRAQ
OWNER

M
E

CONTRACTOR NOMINATED SUB CONTRACTOR


GE POWER

B B

MOE Contract Number :

CONTRACT NO: 1
Cross Checked
Department Name Date Signature

Replaces Responsible Dept. Document Type Project Document Code

ELECTRICAL DRAWING DQR/00/K/BF----EP24/SD/005


BY CHK EGS PEM Format

C.B. O.O. T.O. H.S. A3


Nominated Sub Contractor Document Title Document Status Scale :
A A
Issued for Use NTS
ONE LINE PROTECTION AND Identification Number

SIZE A3 (420x297 mm)


METERING DIAGRAM FOR 400V IQ360-000-E5-BJA-00003
MCCS WITH SINGLE BUS BAR Rev. Date Lang. Sheet

AND ONE INCOMING 00 18.09.2017 EN 1/1