FORCE

É DANAK
INSP Reg.nr.9057
Certification

Parker Hannifin Manufacturing Finland Oy


Hydraulic Filtration Division EMEA Brøndby, 2019-09-18
Salmentie 260
FI-31700 Urjala as Your ref.: Kirsi Ranki I PO 18732756 ON
Finland

Test report No.: FC-07274 Our ref.: It9-324I3 PMH/lflO

BURST TESTING REPORT

Referring to your e-mail of 2019-09-05 two items delivered to us have been pressure tested as stated below
The items were delivered to us with the following information

r EPF1 BOWL FROM ECO


. Marking No, 6 and 10

Applied procedure
1. Pressurization to 450 bar - holding 30 minutes.
2, Depressurization and checking item.
3. Pressurization to 675 bar - holding 30 minutes.
4. Depressurization and checking item,
5. Pressurization to bursting.

The pressurization was made by using water at about 20oC and using a pressure increase rate of about 5
bar per second,
The pressure was measured with our class 0,6 pressure gauge No. MOLV-6 calibrated 2078-12-12.

Results:
The items did not show any defects by the checking under step 2 and 4 of the procedure,

Both items failed due to leak at a gasket.

The maximum pressures were measured to

No. 6:
1544 barg
No. 10: 1760 barg

The items as tested are shown in the enclosed photo'

Kind regards
A/S

Poul

FORCECertificationA/S.parkAllé345.2605}røndby.Denmark'Tel +45432501 77'Fax+454325O0 10'¡nfo@forceceÉification.com'www.forceceftif¡cât¡on.com