Part-1 Section-I –Electrical Requirements

vi) List of spare Parts to be provided.


vii) Recommended procedure for protection of equipment against damage, prior
to installation.
i) Complete system diagram showing required components and routing.

b) The submittals shall be subject to approval by The Department. The Contractor shall
submit the final documentation based on The Department’s comments.
c) Manufacturer's Certificate: Certify that products meet or exceed specified
requirements.
d) Product Data: Provide for grounding electrodes and connections.
e) Submit full technical details and conductor size calculations suitable for short circuit
levels.
f) Submit route of each cable or conductor as proposed.

7.14.6 Submittals for Information

a) Test Reports: Indicate overall resistance to ground and resistance of each electrode

7.14.7 Submittals for Closeout

a) Project Record Documents: Record actual route of conductors, exact locations of


components and grounding electrodes.
b) Certificate of Compliance: Indicate approval of installation by The Department and
AADC/ADDC where required.
c) Provide grounding test results

7.14.8 Regulatory Requirements

a) Conform to the following requirements:


i) DOE Electricity Wiring Regulations
ii) NFPA 70 - National Electrical Code, USA
iii) BS 7671 - Requirements for Electrical Installations, IET, UK.
iv) Latest issue of Abu Dhabi Water and Electricity Authority (ADWEA)
regulations.
b) In the case of conflict, the DOE requirements shall take precedence.

Abu Dhabi Lighting Manual – Version 3.0 July 2021 Page |279