POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT

RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 1 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT


PROJECT
RUWAIS
COMPANY ADNOC Gas Processing
PROJECT NO. 0500760
DOCUMENT NO. 0500760-RT-00-AA-1201
DOCUMENT REVISION STATUS ZZ
DOCUMENT CLASS 1

FOR ADNOC GP USE

CLIENT COMMENTS:

Rejected: Revise and resubmit CODE: 1


Comments as Noted: Work may proceed subject to compliance with and
CODE: 2
incorporation of comments.
Approved - No Comments CODE: 3

Information Only - Accepted for Information Only CODE: 4

REVISION AND AUTHORIZATION RECORD


AD adno c

ZZ 16 Aug 2021 Issued for SDC / IDC RN MM MM

PREPARED CHKD APPD APPD APPD


Rev. Date Description
PIL AILLC ADNOC GP

0500760-RT-00-AA-1202 Page 1 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 2 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

Revision Remarks

SN Page COMPANY Comments CONTRACTOR Response Open /


No. Closed
A. Comments Update

B. New Clause/Modification

0500760-RT-00-AA-1202 Page 2 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 3 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

TABLE OF CONTENTS
1 INTRODUCTION ................................................................................................................................. 5
1.1 Project Background ................................................................................................................ 5
1.2 Project Objective ..................................................................................................................... 5
1.3 Purpose of this Document ..................................................................................................... 5
2 DEFINITIONS & ABBREVIATIONS.................................................................................................... 5
2.1 Definitions ................................................................................................................................ 5
2.2 Abbreviations .......................................................................................................................... 6
3 ORDER OF PRECEDENCE ................................................................................................................ 8
4 REFERENCE DOCUMENTS .............................................................................................................. 9
4.1 Codes and Standards ............................................................................................................. 9
4.2 COMPANY DGS ..................................................................................................................... 10
4.3 Project / ITT Documents and Drawings .............................................................................. 14
4.4 COMPANY Standard Drawings ............................................................................................ 14
5 SITE VISIT SCOPE ........................................................................................................................... 16
6 SITE OBSERVATIONS PROCESS .................................................................................................. 18
6.1 Site Visit Findings and Markups – Process........................................................................ 18
7 SITE OBSERVATIONS CIVIL AND STRUCTURAL ........................................................................ 23
7.1 Site Visit Findings and Markups – Civil and Structural .................................................... 23
8 SITE OBSERVATIONS INSTRUMENTATION ................................................................................. 27
8.1 Site Visit Findings and Markups – Instrumentation .......................................................... 27
9 SITE OBSERVATIONS PIPING ........................................................................................................ 28
9.1 Site Visit Findings and Markups – Piping........................................................................... 28
10 SITE OBSERVATIONS GENERAL .................................................................................................. 36
10.1 TQ’s and RFI’s ....................................................................................................................... 36
10.2 Model and Drawings ............................................................................................................. 36
10.3 Future Site Visits ................................................................................................................... 36

0500760-RT-00-AA-1202 Page 3 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 4 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

II. DETAILS OF REVISIONS


The document revision shall be mentioned on the cover page and the same shall be printed
on all page footers.
Change indicators will be provided for any changes made to any sections of the document
can be traceable by a vertical line on the right side of the text.

0500760-RT-00-AA-1202 Page 4 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 5 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

1 INTRODUCTION

1.1 Project Background

In Ruwais Train-1 & 2 Potable Water (PW) piping network, pipe wall thickness reduction with brownish
coloured water formation was reported. The piping material is Carbon Steel for size 3” & above and
Galvanized Steel for 2” & below. It was concluded by COMPANY that the existing carbon steel
material is not adequate for the current operating condition of PW service, as the water has dissolved
oxygen (about 7 ppm) and has stagnant flow. The prevailing condition creates internal corrosion
(localized pitting), as revealed in the inspection reports.

Arabian Industries LLC („CONTRACTOR‟) has been retained by ADNOC Gas Processing
(„COMPANY‟) as EPC Contractor for the „Potable Water System Upgrade in Train 1&2 at Ruwais‟
(„Project‟), Contract No. OMR.21.100.

1.2 Project Objective

In view of the above, through PCR PE5657 ADNOC Gas Processing (former GASCO) intends to
replace the existing Potable Water CS network (3” & above) in Train1 & 2 with GRE material provided
with UV inhibitor external layer and coated with paint system # 11 as per DGS-6600-010. The
Galvanized Steel network (2” & below) shall be replaced with GRE/SS. However, the existing CS
piping in the process area pipe rack is to be replaced with SS316L piping to avoid any structural
modifications.

1.3 Purpose of this Document

This document presents the site visit findings for the Potable Water System Upgrade in Train-1&2 At
Ruwais Project. This was arranged to identify the scope limits as described in the Project FEED
documentation and point out any discrepancy, missing data or physical obstructions.

2 DEFINITIONS & ABBREVIATIONS

2.1 Definitions

Term Definition
COMPANY ADNOC Gas Processing
CONTRACTOR Arabian Industries LLC
The firm, company or corporation who has been nominated by
Consultant
the Contractor to undertake the Detailed Engineering.
Potable Water System Upgrade in Train 1&2 at Ruwais, Project
Project
No. 0500760.
Shall Indicates a mandatory requirement.
Indicates a strong recommendation to perform a specific portion
Should
of the work.
Site Ruwais ADNOC Gas Processing – Train 1&2
Party (Parties) which manufactures and/or supplies materials,
Vendor/Manufacturer equipment, technical documents or drawings and/or services to
perform the duties specified by the COMPANY/ CONTRACTOR.
All elements of the works to be undertaken as a part of the
Works
Contract.

0500760-RT-00-AA-1202 Page 5 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 6 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

2.2 Abbreviations

Abbreviation Definition
AC Alternating Current
ADNOC Abu Dhabi National Oil Company
AFC Approved for Construction
AG Above Ground (including trench)
AGA American Gas Association
AI Analog Input
AO Analog Output
ALARP As Low as Reasonably Practicable
API American Petroleum Institute
ASME American Society of Mechanical Engineers
ASTM American Society of Testing and Materials
AWS American Welding Society
BACT Best Available Technology
bbl. Barrel
BOM Bill of Materials
BOPD Barrel Oil per day
BS British Standard
BTU British Thermal Unit
BWPD Barrel Water Per Day
CAD Computer Aided Design
CDS Central Degassing Station
CEP Contract Execution Plan
CGA Compressed Gas Association
CICPA Critical Infrastructure & Coastal Protection Authority
CoP Code of Practice
CO MAH Control of Major Accident Hazards
CP Cathodic Protection
CS Carbon Steel
CPM Critical Path Method
CTR Cost, Time, Resource Sheet
CV Curriculum Vitae (Resume)
DB Distribution Board
DBB Double Block and Bleed
DBM Design Basis Memorandum
DC Direct Current
DCR Document Control and Register
DE Detailed Engineering
DEP Design Engineering Practice
DDM Document Distribution Matrix

0500760-RT-00-AA-1202 Page 6 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 7 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

DFT Dry Film Thickness


German Institute for Standardization (Deustche Instute fur
DIN
norma)
ENVID Environmental Impact identification
EPC Engineering Procurement & Construction
ES ADNOC Engineering Specification
ETA Estimated Time of Arrival
ETD Estimated Time of Delivery
EWTP Effluent Water Treatment Plant
FAT Factory Acceptance Test
FEED Front End Engineering Design
FOC Fiber Optic Cable
F&G Fire and Gas
GA General Arrangement
GASCO Abu Dhabi Gas Industries Ltd.
GRE Glass Reinforced Epoxy Resin
HAZID Hazard Identification Study
HAZOP Hazard and Operability Study
H&MB's Heat and Material Balance
H2S Hydrogen Sulphide (Toxic gas)
HSE Health, Safety and Environment
ISO International Standardization Organization
ITP Inspection and Test plan
KO Knock Out
KPI Key Performance Indicator
LA Lay-out
LEL Lower Explosive Limit
LP Low Pressure
MM Million
MR Material Requisition
MTO Material Take Off
NACE National Association of Corrosion Engineers
NDT Non-Destructive Testing
NPS Nominal Pipe Size
OPEX Operating Cost
PAC Provisional Acceptance Certificate
PDS Intergraph Plant Design System (3D Modeling Software)
PG Pressure Gauge
PSIG Pounds per Square Inch Gauge
PSV Pressure Safety Valve
P&ID Process and Instrumentation Diagram
PEAR People, Environment, Assets and Reputation

0500760-RT-00-AA-1202 Page 7 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 8 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

PEP Project Execution Plan


PFD Process Flow Diagram
PH SER Project Health, Safety and Environmental Review
PIM Pre-Inspection Meeting
PMT Project Management Team
PO Purchase Order
PPE Personal Protective Equipment
PPM Project Procurement Manager
PPMW Parts per Million by volume
PQP Project Quality Plan
PRMR Project Risk Management Review
PSSR Pre-Start-up Safety Review
PTW Permit to Work
PW Potable Water
QA/QC Quality Assurance I Quality Control
QRA Quantitative Risk Assessment
RAM Reliability / Availability / Maintainability
RCC Ready for Commissioning Certificate
RDS Remote Degassing Station
RFC Ready for Commissioning
RFI Request For Inspection
RFQ Request for Quotation
ROW Right of Way
RRM Risk Reduction Methods
SDSS Super Duplex Stainless Steel
SS Stainless Steel
SoW Scope of Work
SPIR Spare Parts and Interchangeability Record
TBE Technical Bid Evaluation
TP Tie-in Point
TPI Third Patty Inspection
UAE United Arab Emirates
U/G Underground

3 ORDER OF PRECEDENCE

In case of conflict between various documents, codes or standards, the order of precedence that shall
be followed is:

 UAE Local Statutory Regulations


 Project Datasheets
 Project Specifications

0500760-RT-00-AA-1202 Page 8 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 9 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

 COMPANY DGS / Standards


 International Codes & Standards

In case of conflict between this specification and other specifications, codes or standards referred in
this document, the most stringent requirement as interpreted by COMPANY shall be entertained and
written COMPANY confirmation on the same shall be obtained before proceeding. COMPANY
decision shall be binding in this regard.

4 REFERENCE DOCUMENTS

4.1 Codes and Standards

Document No. Description

API 650 Welded Tanks for Oil Storage

API 675 Positive Displacement Pumps - Controlled Volume for


Petroleum, Chemical, and Gas Industry Services

Application of Fixed Water Spray Systems for Fire


API 2030
Protection in the Petroleum Industry

API STD 650 Welded Tanks for Oil Storage

BS 5950 Structural use of Steelworks in Buildings

BS 6399 (Part-1) Loading for Buildings: Code of Practice for Dead and
Imposed Loads

BS 6399 (Part-2) Loading for Buildings: Code of Practice for Wind Loads

BS 8004 Code of Practice for Foundations

BS 8007 Design of Concrete Structures for Retaining Aqueous


Liquids

BS 8110 Structural use of Concrete

IBC 2009 International Building Code 2009

IEC 60079 Electrical Apparatus for Explosive Gas Atmosphere

IEC 60228 Conductors of Insulated Cables

IEC 60287 Electric cables - Calculation of the Current Rating

0500760-RT-00-AA-1202 Page 9 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 10 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

Document No. Description

IEC 60331 Tests for Electrical Cables Under Fire Conditions – Circuit
Integrity

IEC 60332 Tests on Electric and Optical Fiber Cables Under Fire
Conditions

IEC 60529 Degrees of Protection Provided by Enclosures (IP Code)

IEC 60364 Low voltage Electrical Installations

IEC 60502 Power cables with extruded insulation and their accessories
for rated voltages from 1 kV up to 30 kV - ALL PARTS

NFPA 11 Standard for Low, Medium & High Expansion Foam

Standard for the Water Spray Fixed System for Fire


NFPA 15
Protection

NFPA 22 Standard for Water Tanks for Private Fire Protection

Standard for Installation of Private Fire Service Mains and


NFPA 24
Their Appurtenances

NFPA 30 Flammable and Combustible Liquids Code

NFPA 72 National Fire Alarm and Signalling Code

NFPA 2001 Standard on Clean Agent Fire Extinguishing System

Shell DEP 31.38.01.11 Piping - General Requirements

- UAE Fire and Life Safety Code of Practice

4.2 COMPANY DGS

Document No. Description

Civil and Structural

DGS-1482-001, Rev. 2 Specification for Drainage Design Basis

0500760-RT-00-AA-1202 Page 10 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 11 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

Document No. Description

DGS-1486-001, Rev. 3 Specifications for Earthworks

DGS-1486-002, Rev. 2 Specifications for Excavation & Backfill for Underground


Installations

DGS-1782-001, Rev. 3 Civil Design Basis

DGS-1783-001, Rev. 3 Specification for Concrete Supply

DGS-1783-002, Rev. 4 Specification for Concrete Construction

DGS-1783-003, Rev. 2 Specifications for On-Site Testing Laboratory

DGS-1783-004, Rev. 3 Specification for Grouting

DGS-1783-005, Rev. 2 Specification for Paving Materials & Construction

DGS-1783-008, Rev. 0 Concrete Repair

DGS-1882-001, Rev. 2 Structural Design Basis

DGS-1883-001, Rev. 3 Specification for Structural Steel Fabrication

DGS-1884-001, Rev. 3 Specification for Structural Steel Erection

General

DGS- 00-001, Rev. 2 Basic Engineering Design Data

DGS- 0000-020, Rev. 2 Process Design Criteria

DGS- 0000-021, Rev. 3 P & ID Development

HSE

DGS-1900-002, Rev. 1 Health Safety and Environment Philosophy

DGS-1900-003, Rev. 1 Fire & Gas Protection Design Basis

DGS 1900 004, Rev. 1 Water Spray Fire Protection System

DGS-1900-007 Rev.2 Fire Protection Clean Agent Systems

0500760-RT-00-AA-1202 Page 11 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 12 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

Document No. Description

DGS-1511-030 Rev.1 Fire & Gas Detector

HSE-ST-002, Rev. 1 Project HSE Review Standard

HSE-ST-008, Rev. 2 HAZID ENVID OHID Standard

Instrumentation and Control

DGS 1511 031, Rev. 1 Fire and Gas Detectors

DGS-1511-032, Rev. 2 Instrument Design Criteria

DGS-1511-034, Rev. 1 Instruments Piping Classes

DGS 1511-036, Rev. 2 Instrument and Thermocouple cables

DGS 1510 001, Rev. 2 DCS Operating and Control Philosophy

DGS 1510 005, Rev. 0 Fire and Gas Philosophy

DGS 1510 006, Rev. 1 Instrument Numbering Rules

DGS 1511 021, Rev. 2 Distributed Control System

DGS 1511 025, Rev. 2 Design Rules for DCS Graphics

DGS 1511 030, Rev. 1 Fire and Gas System

DGS 1511 029, Rev. 2 Alarm Philosophy

DGS-1511-042, Rev. 2 Flow Instruments

DGS-1511-043, Rev. 1 Instrument Installation Design

DGS 1511 045, Rev. 1 Instrument – Field Pressure Testing

DGS 1511 044, Rev. 1 Instrument Storage and Calibration

DGS 1511 046, Rev. 1 Inspection & Testing of Instruments and Control Systems

DGS 1511 052, Rev. 1 Marshalling Cabinets

DGS-1545-001, Rev. 1 Pressure Relief Devices

0500760-RT-00-AA-1202 Page 12 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 13 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

Document No. Description

STD-1538-002 Typical Instrument Hook-up Drawings

Metallurgy & Corrosion

DGS-1300-175 Rev.1 Galvanizing

DGS-1470-009 Rev.0 Requirements for Fiber Reinforced Plastic (FRP) Pipes &
Fittings

DGS-1674-001, Rev. 2 Design, Installation, Commissioning & Monitoring of Cathodic


Protection Specifications – Plant facilities

DGS-1674-002, Rev. 2 Design, Installation, Commissioning & Monitoring of Cathodic


Protection Specifications – Pipelines

DGS-6300-001 Rev.2 Welding and NDE of Piping System

DGS-6300-002 Rev.1 Welded Storage Tanks

DGS-6300-006 Rev.1 Material Selection & Corrosion Control Philosophy

DGS-6600-010 Rev.2 Painting specification Part-A (Painting of New Metallic


Structure)

DGS-6600-020 Rev.1 Internal Linings

Piping

DGS-1300-010, Rev. 2 Piping Systems (Piping Classes)

DGS-1300-015, Rev. 1 Pipes and Piping Components

DGS-1300-016, Rev. 1 Color Code for Piping Material Identification

DGS-1300-030, Rev. 1 Process and Utility Field/Shop Pressure Testing

DGS-1300-040, Rev. 2 General Piping – Process and Utility Design, Layout &
Drawing

DGS-1300-060, Rev. 2 Piping Flexibility Analysis

DGS-1300-070, Rev. 2 Pipe Supports

0500760-RT-00-AA-1202 Page 13 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 14 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

Document No. Description

DGS-1300-100, Rev. 1 Piping Tie-Ins

DGS-1300-160, Rev. 2 Bolt Torquing/Tensioning Procedure for Flanged Connection

DGS-1300-165, Rev. 2 Internal Cleaning of Piping

DGS-1300-185, Rev. 2 Fabrication, Handling and Installation of Process and Utility


Piping

DGS-1300-190, Rev. 2 Traceability of Shop and Field Fabricated Piping Materials

DGS-1310-011, Rev. 1 Check Valves

DGS-1310-012, Rev. 0 Ball Valves

DGS-1310-013, Rev. 1 Butterfly Valves

DGS-1310-014, Rev. 0 Gate Valves

DGS-1310-015, Rev. 0 Globe Valves

Others

ADNOC-COPV1-04 Guideline of Management of Contractor HSE

ADNOC-COPV1-13 Best Practice Note on Preparation of Project HSE Plans

4.3 Project / ITT Documents and Drawings

Document No. Description


ITT Package ITT package, Annexures and TB‟s 1 to 5

4.4 COMPANY Standard Drawings

COMPANY Ref. Title

STD-1481-001-005 Drainage Ditch and Road Crossings Fire Traps Types A & B

0500760-RT-00-AA-1202 Page 14 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 15 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

COMPANY Ref. Title

STD-1481-001-007 / A Sanitary Sewer & Storm Water Square Manhole & Catch
basin Details

STD-1481-001-007 / B Sanitary Sewer & Storm Water Circular Manhole

STD-1481-001-008 Oily Water & Accidentally Oily Water Manhole Details

STD-1481-001-010 Vents for Manholes

STD-1481-001-012 A Electrical or Instrumentation Cables Trenches in Paved


Areas

STD-1481-001-012 B Electrical or Instrumentation Cables Trenches in Paved


Areas

STD-1481-001-013 Road Crossing Conduits for Electrical or Instrumentation


Cables

STD-1481-001-014 Pressurized System Standard Valve Pits

STD-1481-001-017 / A & B Road and Paving Details

STD-1481-001-018 Ground Finishes Typical Requirements

STD-1781-002-001 Anchor Bolt Materials-Fabrication-Marking

STD-1781-002-003 Anchor Bolt Type R

STD-1781-002-006 Membrane Protection to Concrete Foundations and


Pedestals

STD-1781-003-001 Civil & Building Works – General Notes

STD-1781-003-002 Civil & Building Works – Abbreviations and Symbols

STD-1781-003-003 Standard Reinforcement Details

STD-2500-001 Handrails for Cone Roof Tanks

STD-2500-004 Product Drain and Water Draw Off

STD-2500-008 Spiral type Staircase provided with Stair Treads of


Galvanized Grating

STD-2500-014 Open Vent

0500760-RT-00-AA-1202 Page 15 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 16 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

COMPANY Ref. Title

STD-2500-018 Nameplate with Bracket for Tanks

5 SITE VISIT SCOPE

The original Site Visit Pan and Agenda was scheduled as per Attachment 1. Subsequently the same
was revised to accommodate changes in schedule as in Attachment 1A.
st
The Site Visit was conducted from 28/7/21 to 5/8/21 (1 half only) based on site working hours and
permitting requirements.

Due to camera availability certain areas are yet to be photographed as mentioned below.

The site visit was divided into 2 Major Phases:

Phase Activity Disciplines Remarks

I Tie-In Verification Piping, Process, AI and PIL Teams


Instrumentation

II Line Tracing and Instruments Piping, Process, AI and PIL Teams


Identification Instrumentation, Civil

Team Composition:

Sr No Name COMPANY / Designation Time at Site


CONTRACTOR /
SUB-
CONTRACTOR

1 Syed Ahmed Ali ADNOC Gas Sr. Engineer, Visiting


Processing Projects

2 Annamalai Chellappan ADNOC Gas Sr. HSE Engineer, Visiting


Processing Projects

3 Ashoka Narayanan Arabian Industries Lead Piping Full Time


LLC Engineer

0500760-RT-00-AA-1202 Page 16 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 17 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

4 Dhanesh Bele Arabian Industries Lead Piping Full Time


LLC Designer

5 Shawn Driedger Arabian Industries Project Manager Visiting


LLC

6 Royston Nicholas D Penspen Full Time


Project Engineer
Sa

7 Nafi Ali Penspen Process Engineer Full Time

8 Anas Siddiqui Penspen Piping Designer Full Time

9 Sabina Hafeez Penspen Piping Engineer Part Time

10 Penspen Instrumentation & Full Time


Ahmed Ali Rizvi
Control Engineer

11 Mohammad Khalid Penspen Civil & Structural Part Time


Azam Engineer

12 Jinoop Parakkandy Penspen Civil and Structural Part Time


Puthiyapurayil Designer

Geographical Locations Visited.

Sr No Area Photographs Remarks


Taken

1 Process Train 1 Yes

2 Process Train 2 Yes

3 SRU Yes

0500760-RT-00-AA-1202 Page 17 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 18 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

4 Utility Yes

5 Pure Propane No

6 Fire Water Tankage No

7 C3 Loop Train 1 No

8 C3 Loop Train 2 No

9 Sea Water Cooling Area No

10 Propane Tankage Storage Area No Partial only


Sleepers

11 Jetty No Yet to be visited

12 Desalination Area No

13 Main Pipe Rack Yes

14 Interconnecting Sleepers Yes

15 Caustic Area No

16 Refrigeration Area No

17 SRU Pipe Rack No

Areas Outstanding for Photography is attached as Attachment 2.

6 SITE OBSERVATIONS PROCESS

6.1 Site Visit Findings and Markups – Process

P&ID Markups done at Site Visit are attached as per - Attachment 3 - Process Attachments

0500760-RT-00-AA-1202 Page 18 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 19 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

LINE NO / TIE- OBSERVATION / VERIFICATION WAY FORWARD AND


SR. DRAWING IN NO /
RESOLUTION
NO NO LOCATION

COMPANY to endorse the


The master P&ID drawings have
marked-up P&IDs and the
been verified at site and few
same shall be used further
markups are provided in the same
for detail engineering
- - with respect to site observations.
1 design.
The same has been attached as
Process Attachment 1
Refer process Attachment
1.

05-AD-1061 Process train 1 LCV for make up tank inlet not


2 &2 found in site for both train 1 as well COMPANY to confirm the
as train 2 marked-up P&ID (based on
site condition). A TQ will be
raised to confirm the inlet
LCV requirement.

Refer process Attachment


2.

07-AD-0008 Sea water Spectacle blind on existing line WD-


3 cooling system U78200-2”-CA2B is not found in COMPANY to confirm the
(utilities plant 7) site. marked-up P&ID (based on
The line WD-U7800-2”-HDPE site condition).
shown as underground in the
Master, but at site this line is above
Refer process Attachment
ground going to CW Discharge
3.
structure (8Z-106/206)

07-AD-0012 Aqueous - Additional TP will be required at 3”


4 System (Utility Nozzle N4 of tank 7D-101 COMPANY to confirm the
area) (Potable Water Storage Tank) marked-up P&ID (based on
which is captured in FEED site condition).
drawing.
- The line WD-77186-1”-BA2B
Refer process Attachment
ending is utility connection as
4.
marked up in the drawing.
- There is an additional connection
to Emergency Diesel Generator
which was not captured in FEED,
but is captured in latest Master
and the same is verified in site.

0500760-RT-00-AA-1202 Page 19 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 20 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

07-AD-0029 Pure Propane There is an additional Safety


5 Area shower which was not captured in COMPANY to confirm the
FEED but captured in latest Master marked-up P&ID (based on
and the same is identified in site. site condition).
There will be additional Tie-in point
for this connection.
Refer process Attachment
5.

07-AD-0040 Jetty Area In FEED, the tie-in point in the line


6 to jetty area is identified COMPANY to confirm the
downstream of gate valve before marked-up P&ID (based on
the fence. However, the line is site condition).
further extended outside the fence
(W-9201-2”-BA2B) to jetty area with
Refer process Attachment
branch connection to Marine
6.
building. This line is however
captured in Master with end
connection as blinded at jetty area A TQ will be raised to
and the branch connection to confirm the change in tie-in
Marine building is captured as well. point downstream of fence
There would be additional tie-in upto Jetty area.
requirement for Marine building
connection, if there is pipe
replacement scope further
downstream the fence upto Jetty
area as opposed to FEED identified
tie-in.
07-AD-0042 Interconnecting - There is a branch connection,
7 Sht 1/2 pipe way (North WD-78104-1“-BA2B on the line COMPANY to confirm the
(FEED & of Train) main line WD-78101-6”-BA2B marked-up P&ID (based on
Master between train 1 and control site condition).
drawing) building which was captured in
FEED as well as latest Master but
Refer process Attachment
is not identified in site.
7.
- The line WD-787001-2”-BA2B (in
Master mentioned as routed to old
MCR tea room) destination could A TQ will be raised
not be verified as it is going accordingly.
underground. There will be
additional tie-in point required for
this line as it was not captured in
FEED under project scope.
- The line WD-78113-4”-BA2B line
destination is not known as it is
going underground. Further there
is additional 1” line branch line
(before TSV-371) going
underground whose destination
point is not known. These are not
captured in FEED drawing. There
might be additional tie-in points
required if the destination points

0500760-RT-00-AA-1202 Page 20 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 21 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

are identified.
- TP-1015 is identified in site near
to the tea room building, however,
its actual destination could not be
verified as the line is going
underground.

07-AD-0051 Fresh Firewater - In the line WD-76111-2”-BA2B,


8 Tank there is a 2” branch which was not COMPANY to confirm the
captured in FEED (nor in Master), marked-up P&ID (based on
identified at site going site condition).
underground towards the tank
PWT3-30022. Additional tie-ins
Refer process Attachment
point for the same will required.
8.
- Further in the line WD-76111-2”-
BA2B, there is additional 2”
branch line whose exact A TQ will be raised
destination is not known as it is accordingly.
going underground (Nearest
building is substation 9).
- The existing representation in
FEED / Master P&ID for the inlet
line WD-76127-4”-BA2B is not
correct as per site condition. The
MOV is incorrectly shown in the
inlet line to 7D-116 (Fresh
Firewater Tank). At site, the MOV
is located to be on the Firewater
pumps (7G-116A/B) return line
and the tie-in point (TP-1034) will
be at the MOV.
07-AD-0052 Interconnecting - A new branch connection (WD-
9 pipe way to C3 66597K-2”-CA2B-N) to Closed COMPANY to confirm the
storage drain drum 6C-106 which was not marked-up P&ID (based on
captured in FEED but is captured site condition).
in latest Master, has been verified
at site. Additional tie-in point will
Refer process Attachment
be required for this connection at
9.
the spec break downstream of
branch connection valve.
- WD-78111A-4”-BA2B line routed A TQ/need list will be raised
towards the intake basin. The for intake basin drawings
intake basin drawings are and further tie-in
required to identify the tie-in at the identification.
end user which was not captured
in FEED.

0500760-RT-00-AA-1202 Page 21 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 22 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

07-AD-0059 Freshwater - TP-1021 is identified at site to be


10 Cooling at tank nozzle as opposed to COMPANY to confirm the
(Instrument air FEED drawing where tie-in point marked-up P&ID (based on
plant 7) is indicated at branch line starting. site condition).
- There will be additional tie-in point
required for the LV-857 float
Refer process Attachment
which is going inside the Fresh
10.
Water Make-up Tank (7V-119-D-
114).
- As per the FEED drawings, A TQ will be raised to
Potable water supply to the Fresh confirm the interconnection
Water Make-up Tank (7V-119-D- pipe between the Fresh
114) is under project scope and Water Make-up Tank to
further scope begins at the outlet Fresh Water Pump (7V-119-
of Fresh Water Cooler 7V-119-E- G-101A/B/C) and to Fresh
104A/B/C. The interconnection Water Cooler 7V-119-E-
between the Fresh Water Make- 104A/B/C which is identified
up Tank to Fresh Water Pump to be replaced as additional
(7V-119-G-101A/B/C) and to scope.
Fresh Water Cooler 7V-119-E-
104A/B/C is identified as CS pipe.
07-AD-0072 LPG Storage - Existing line WD-78170-2”-BA2B
11 area is observed in site to be COMPANY to confirm the
connected to deluge system UV- marked-up P&ID (based on
157 of Tank 6D-141A which was site condition).
not properly captured in FEED
drawing. There will be additional
Refer process Attachment
tie-in point required for the same.
11.

FP-0277-29- Plant Air The potable water supply line is


12 002-RUW-V- Compression - found to be routed to water tank COMPANY to confirm the
101 (Vendor Utility area skid (7K-101C-D-2). Further marked-up P&ID (based on
P&ID) interconnections within the Vendor site condition).
package skids (Water tank skid,
Water Cooler skid & Compressor
Refer process Attachment
skid) are shown as part of the
12.
project scope pipe replacement.
Based on COMPANY confirmation,
the project scope/tie-in points within A TQ will be raised for
Vendor package skids will be COMPANY confirmation
verified & confirmed. regarding the project scope
(tie-ins) inside the Vendor
package skids.

07-AD-69 Potable water - Only one analyzer was found in


13 storage – the site on the line WD-78135-3”- COMPANY to confirm the
Utilities plant 7 BA2B. marked-up P&ID (based on
- As per Site visit discussion with site condition).
COMPANY, For the pumps 7G-
113A/B/C a note must be
Refer process Attachment
provided mentioning that these
13.
pumps will be replaced as part of

0500760-RT-00-AA-1202 Page 22 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 23 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

interface project. The details of A TQ will be raised for new


new pumps are to be requested pumps (7G-113A/B/C)
from COMPANY. information from
COMPANY.

7 SITE OBSERVATIONS CIVIL AND STRUCTURAL

7.1 Site Visit Findings and Markups – Civil and Structural

Site Visit photos are attached as per - Attachment 4 - Civil Attachments

LINE NO / OBSERVATION /
FEED VERIFICATION
SR. TIE-IN NO / WAY FORWARD AND RESOLUTION
DRAWING
NO LOCATION
NO

Potable Water Tank Area

Existing sleepers are


SRC-82- Potable available with space for
R1-07-14- water tank new sleepers. New pipe supports to be provided as per
1. 33- & pumps Requirement for new final piping GA.
001(61/74) sleepers shall be as per
finalized piping GA.
Three (03) existing
portable water pumps are
to be replaced (Interface
Project). New inlet & outlet
SRC-82- Potable piping shall be provided in
water tank Supports provided in interface projects
R1-07-14- pump replacement project
& pumps shall be checked for clash with new
2. 33- & same shall be updated support requirements in current project.
001(61/74) accordingly.

Sleeper Area

FEED stage routing is


clashing at some
locations. Pipe routing
SRC-82- Sleeper shall be changed. Existing
New pipe sleepers shall be provided
R1-07-14- Area sleepers have no space of
adjacent to existing sleeper as per revised
1. 33-001 parallel routing. Also new
piping GA.
(23/74) sleeper cannot be placed
in middle as space is
captured by existing lines.

0500760-RT-00-AA-1202 Page 23 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 24 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

New line routing shall use


existing sleepers wherever
possible subject to space
SRC-82- Sleeper availability for like to like or As there is no space for parallel routing on
R1-07-14- Area parallel replacement of existing sleepers, new sleepers shall be
2. 33-001
lines. New sleepers shall provided as per revised piping GA.
(23/74)
be required where existing
cannot be used due to
parallel routing.
New sleepers shall be
designed for piping loads
using existing Geotech
data. In absence of
SRC-82- Sleeper Area wise soil properties shall be
specific location Geotech
R1-07-14- Area segregated. For missing locations, soil
data, tentative adjacent
3. 33-001 properties shall be agreed by means of
areas data shall be used
(23/74) TQ.
as per COMPANY
acceptance. (TQ to be
raised)

Existing structure which


does not support existing
lines shall be used to
support new line routing.
Adequacy check for
SRC-82- Sleeper existing T post for new
R1-07-14- Area load shall be done as per
4. 33-001
COMPANY provided data.
(23/74)
(TQ to be raised for
existing design
calculations, foundation &
structure drawings).

In road crossing culverts,


there is no space available
for new line routing as only
SRC-82- Sleeper 500mm clear space is
R1-07-14- Area there in culvert on each
5. 33-001 side. Alternate routing
(23/74) shall be finalized by piping
for road crossing or like to
like replacement option to
be considered.

Sulfur Recovery Unit

SRC-82-
SRU New lines in SRU are
R1-07-14- Supports on exisiting rack shall be
routed upon the pipe rack
1. 33-001 provided as per piping route.
& existing T posts.
(73/74)

0500760-RT-00-AA-1202 Page 24 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 25 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

Space availability is
verified at site for new
SRC-82- lines routing. Existing
R1-07-14- SRU Piperack has space Additional supports requirements shall be
2. 33-001 available for new lines. as per revised piping GA.
(72/74) Additional supports
requirements shall be as
per piping route changes
 Main Pipe Rack
SRC-82- Main Pipe Main pipe rack structure is
R1-07-14- rack not having clear space for -
1. 33-001
line routing as per FEED.
(68/74)

SRC-82- Main Pipe Additional Hanger


Additional Hanger supports shall be
R1-07-14- rack supports shall be
checked for new loads considering
2. 33-001 proposed to route new
nd supporting beams as adequate.
(68/74) lines below 2 tier.

Additional supports if
SRC-82- Main Pipe required near pipe rack
R1-07-14- rack entry shall be provided as -
3. 33-001
T posts.
(68/74)

Train-1
FEED stage Civil GA
New lines shall have changes in route on
SRC-82- shows T posts which
Train 1 existing cantilever post on white color pipe
R1-07-14- cannot be provided at the
rack structure which is beside the main
1. 33-001 center of road. New lines
pipe rack. Space is available on existing
(27/74) are routed on the existing
rack cantilever for new lines.
pipe rack.
SRC-82- Inside the train pipe
R1-07-14- Train 1 routing shall be changed
-
2. 33-001 as per piping route
(27/74) changes.
Train-2
FEED stage Civil GA
New lines shall have changes in route on
SRC-82- shows T posts which
Train 2 existing cantilever post on white color pipe
R1-07-14- cannot be provided at the
rack structure which is beside the main
1. 33-001 center of road. New lines
pipe rack. Space is available on existing
(25/74) are routed on the existing
rack cantilever for new lines.
pipe rack.
SRC-82- Inside the train pipe
R1-07-14- Train 2 routing shall be changed
-
2. 33-001 as per piping route
(25/74) changes.
Utility Area

0500760-RT-00-AA-1202 Page 25 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 26 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

All the new lines are


SRC-82- routed on existing pipe
R1-07-14- Utility Area rack. Parallel routing or Supports for new piping shall be provided
1. 33-001 like to like replacement from existing pipe racks & T posts.
(43/74) shall be finalized by
piping.
Existing pipe supports can
be used for like-to-like
SRC-82- replacement. Parallel
R1-07-14- Utility Area routing requirement shall Existing supports are available & same
2. 33-001 be finalized by piping. New can be utilized in like-to-like replacement.
(43/74) supports requirements
shall be studied after route
finalization by piping.

C3 Loop Train-1&2

New lines are routed on


SRC-82-
C3 Loop existing pipe rack, Space
R1-07-14- Design verification not required for new
available for parallel
1. 33-001 line routing on existing pipe rack.
routing on existing pipe
(71/74)
rack.
Line routing for safety
SRC-82- shower shall be finalized
R1-07-14- C3 Loop and same shall be New support requirement shall be studied
2. 33-001 checked for additional after pipi
(71/74) support after piping layout
finalization
Caustic Storage Area
Caustic
Storage Civil GA for this area is not
GA shall be developed as per revised
N/A Area available.
1. piping GA and support requirements.

Jetty Area

Like to like replacement shall be studied


Jetty Area Civil GA for this area is not
by piping & same shall be routed on
N/A available.
1. existing sleepers with no requirement of
new supports.

Fire Water Area

Fire water 2-inch line is routed on


Tank Area existing pipe rack. Same Same as existing route & supports to be
N/A
1. shall be replaced as per used on pipe rack
existing layout.
New support requirements
Fire water shall be studied near fire
Tank Area New support required shall be provided as
N/A water tank for parallel
2. per revised piping GA.
routing replacement shall
be checked as per revised

0500760-RT-00-AA-1202 Page 26 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 27 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

piping GA

Desalination Tower

Sleeper 2-inch line is routed on New support is not required as the lines
SRC-82- Area / existing pipe sleeper. New shall use existing sleeper. On the
R1-07-14- Desalination lines shall be replaced, desalination tower roof, additional support
1. 33-001 Tower and same sleepers shall if required, same shall be provided from
(23/74)
be used for new lines. roof slab.

8 SITE OBSERVATIONS INSTRUMENTATION

8.1 Site Visit Findings and Markups – Instrumentation

Site Visit photos are attached as per - Attachment 5 - Instrumentation Attachments

OBSERVATION /
LINE NO / TIE-IN VERIFICATION
SR. WAY FORWARD AND RESOLUTION
DRAWING NO / LOCATION
NO NO

Sodium Analyzer & During Detail design the requirement


1 07-AD-69 Near Tank 7D- Transmitter AE/AT-133 of Sodium analyzer will be verified.
113 is missing at site

During Detail design the requirement


LCV-394 shown in of LCV-394 will be verified and
2 05-AD-1061 On Tank 5V-106- FEED P&ID was not subsequently updated in P&IDs.
D-1 in Train-1 installed at Tank.

At all It was observed at site Standard Hookups for each type of


3 - instrumentation that there were standard instrumentation including PCVs,
including PCVs, Hookup for each type of Pressure Gauges, Pressure
PGs, PTs, TGs, instrumentation. transmitters, temperature transmitters,
TTs etc. temperature gauges will be submitted
for COMPANY approval.

0500760-RT-00-AA-1202 Page 27 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 28 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

Current site conditions will be


replicated as per COMPANY advise
4 07-AD-5101 WD-U7X112-1 PCV-813 was missing at and since there is no safety shower
½”-PD0BY site as there was no currently hence PCV will not be
safety shower present. installed as well.

9 SITE OBSERVATIONS PIPING

9.1 Site Visit Findings and Markups – Piping

Site Visit photos are attached as per - Attachment 6 - Piping Attachments

LINE NO / TIE- OBSERVATION / WAY


SR. DRAWING IN NO / VERIFICATION FORWARD AND
NO NO LOCATION RESOLUTION

78-LD- TP-1005, 1006, As per


1 0042 1007, 1008, information from Based on the
1009 & 1010 ADNOC new pump
operation, arrangement,
Potable Water potable water
Main Supply replacement
Pump will be piping shall be
replaced with accommodated.
New Pump and
minimum
New pump
Changes will be
vendor GA &
expected in the
Equipment GA
New Pump
drawing shall be
Arrangement.
requested with
This is interface
TQ to
with another
COMPANY.
project where
interface project
will replace the
existing pump
with new.

PE6669- Process Train- As per interface


2 R1-05-13- 1 Project 17406 This point will be
12-001 TP-1058 / WD- New Equipment raised in the TQ
SHEET 01 71192-2”- 5C-186 will be for the
OF 21 PD0BY planned to confirmation of
construct in the location of
Process Train-1 the safety
hence location of shower for

0500760-RT-00-AA-1202 Page 28 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 29 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

the existing safety further


shower is development of
changed in the the detailed
Potable water engineering
replacement drawings.
FEED project. As
per ADNOC
operation, if
interface is not
executed then
safety shower
location will
remain as per old
location.

Snap-1 WD-78132-6”- Piping routing


3 68-LD- FA0BY arrangement shown in the Due to site
0010 Interconnecting FEED drawing is not obstruction, new
Pipe sleeper feasible due to preliminary
obstruction available at routing is marked
site. based on the site
condition.

Refer Snap-1 for


proposed routing.

Snap-2 WD-78132-6”- Parallel routing is not


4 68-LD- FA0BY possible due the space Due to space
0010 Interconnecting constraints. Existing line constraints, in
Pipe sleeper is running inside culvert this location like
where additional space is to like
not available for parallel replacement with
routing. SS piping
material is
suggested
instead of GRE
to avoid
additional
support inside
the culvert.

Refer Snap-2 for


proposed routing.

Snap-3 WD-78105-4”- Piping routing


5 68-LD- FA0BY arrangement shown in the This new routing
0010 Interconnecting FEED drawing is feasible proposed on the
Pipe sleeper however based on site existing structure
observation there is required
existing pipe supporting additional
structure available where supporting

0500760-RT-00-AA-1202 Page 29 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 30 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

the line can be routed to beams. Also load


avoid new sleepers bearing capacity
support as per FEED. of the existing
pipe rack needs
to be verified by
Civil to finalize
the routing.

Refer Snap-3 for


proposed routing.

Snap 4, 5, WD-78105-4”- Piping routing


6 6&7 FA0BY arrangement shown in the Alternate piping
Interconnecting FEED drawing is not route is
Pipe sleeper feasible due to suggested based
obstruction available at on the site
site. condition. Same
shall be studied
to finalize the 3D
model.

Refer snap 4, 5,
6 & 7 for
alternate routing.

Snap 8 to WD-78106-2”- Piping Arrangement that


7 14 FA0BY shown in the FEED is Alternate
Interconnecting possible in some portion. arrangement is
Pipe sleeper Minor modification suggested based
required due obstructions. on site condition.
Same shall be
studied to finalize
the 3D model.

Refer snap 8 to
14 for alternate
routing.

Snap 15 to PIPE WAYS/ Piping Arrangement that


8 18 PIPE RACKS shown in the FEED is Alternate route is
feasible however there is suggested based
hindrance to the access on site condition.
hence for the optimization Same shall be
alternate route has been studied to finalize
identified for below the 3D model.
locations.
 Piping Modification
Refer snap 15 to
required at Entry of 18 for alternate
Train-1 routing.
 Piping Modification
required at Entry of

0500760-RT-00-AA-1202 Page 30 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 31 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

Train-2
 Piping Modification
required at Pipe Rack
before SRU, C3 Loop
Train-1&2.

Snap 19 PIPE WAYS/ Additional, 2” branch Missing lines


9 PIPE RACKS / header is identified from route is not
Line no. WD- C3 loop train-2 to Deo available in the
U78004-2”- Propane near Pig 3D model
PD0BY Launcher 58-V-5802 received and
which was not available in further same shall
FEED. As per FEED GA be requested
continuation line was not
through TQ for
available.
relevant GA‟s.

Snap 20 PIPE RACKS TP-1147 tie-in to Acid Acid flare tie-in


10 TP-1147 / flare header is found on need to be
Line WD- the Pipe Rack. updated in the 3D
78130-2” model and further
PD0BY confirmation shall
be taken from
COMPANY for
tie-in location
confirmation
since this
connection is with
acid gas flare.

Snap 21 PIPE WAYS Two threaded branches To confirm the


11 Line no. WD- are found that are going tie-in location and
78120-2”- from main header toward clarify the scope
FA0BY the Control Room building of replacement
area. Extend of TQ shall be
replacement of the raised
existing line needs to be
confirmed.
Snap 22 PIPE WAYS 4” & 1” underground To confirm the
12 Line no. WD- connection found on tie-in location and
78113-4”- existing line after the first clarify the scope
FA0BY culvert but in the FEED of replacement
the new 4” line is shown TQ shall be
with blinded. raised.

Snap 23 TP-1015 / 3” threaded Branch To confirm the


13 PIPE WAYS connection found as per tie-in location and
P&ID this line going clarify the scope
towards Tea Room TP- of replacement
1015. TQ shall be
raised.

0500760-RT-00-AA-1202 Page 31 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 32 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

Snap 24 PIPE WAYS New user found in the To confirm the


14 Infront of storage area for Drain tie-in location and
Propane drum 6C-106. clarify the scope
Storage tank A of replacement
TQ shall be
raised.

Snap 25 PIPE WAYS / Existing Instrument and TQ shall be


15 WD-78105-4”- electrical cable trenches raised for Existing
FA0BY are observed near to the Instrument and
new pipe route. There is Electrical trench
possibility where new Layout to verify
foundation will clash with new pipe
these existing cable support‟s
trench. These are
foundation
available at multiple
clashes.
location near to new pipe
routing. Refer Snap-25

Snap 26 PIPE WAYS Three out of six potable To confirm the


16 Line no. water branch lines are not tie-in location and
WD-78168-2”- connected for Firewater clarify the scope
PD0BY Deluge system. These of connection TQ
WD-78169-2”- connection requirement shall be raised.
PD0BY needs to verify with
WD-78170-2”- COMPANY.
PD0BY
WD-78171-2”-
PD0BY
77-LD- Potable water Piping modification is All piping
17 0010 Make-up required in Potable water arrangement will
system In Make-up System. As per be studied and
UTILITY AREA FEED, new piping modified to
Tank 7D-101 arrangement will be routed minimize like to
Pumps 7G- under the pipe rack. like replacement
103A/B/C and correct the
piping
arrangements for
parallel routing to
the possible
locations.

Snap 27 UTILITY AREA Additional user found in To confirm the


18 the Utility area that is tie-in location and
Emergency Generator and clarify the scope
1” line is ended at the top of replacement
of the emergency TQ shall be
generator building with raised
hose coupling.

0500760-RT-00-AA-1202 Page 32 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 33 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

77-LD- UTILITY AREA 2” Underground To confirm the


19 0007 Beside Power connection is found near tie-in location and
Snap 28 Generation shed/ ACC Room, clarify the scope
Line no. WD-77199-2”- of replacement
PD0BY TQ shall be
raised

77-LD- UTILITY AREA 8” line between


20 0017 Fresh water Tank To confirm the
Snap 29 and Its pumps, tie-in location,
and 6” line existing Material,
between Pumps and clarify the
and Heat scope of
Exchanger is not replacement TQ
available in shall be raised
FEED. Based on
site observation it
looks like CS
since this is
rusted.

Snap 30 UTILITY AREA In FEED P&ID‟s for To confirm


21 Cooling system, Air the tie-in
Compressor Package, location and
Piping modification clarify the
between Vertical vessel, scope of
pumps cooler and replacement
Compressor are shown in TQ shall be
the scope of work
raised to
however Piping GA is not
request
available. It is on skid
piping. Piping GA
drawing of
these Area
and GA
drawing of
skids.
1.

Snap 31 C3 loop Train- As per P&ID Safety


22 1&2 Shower is shown in C3 Process to clarify
loop Train-1&2 area but it the requirements
is not available at site and for further
FEED Piping GA. development.

0500760-RT-00-AA-1202 Page 33 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 34 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

FP0277- Pure Propane As per FEED, there is Hence piping


23 38-0202 sufficient space available modification is
for placing new header required up to
however sub-header near the pump seal
to the pump need to be nozzles further
relocated to avoid study is required
supporting issues. in 3D model.

FP0277- Pure Propane The location of piping


24 38-0202 arrangement for PCV and Hence piping
Flow indicator to be modification is
relocated due to required up to
constructability of support proposed
and will obstruct the suitable location
access way. that will be
studied in the
modelling.

Snap 32 Caustic Storage Tank Caustic pump and Safety


25 Shower is found in this To confirm the
area and connected tie-in location
piping is going and clarify the
underground which needs scope of
to be replaced. replacement TQ
shall be raised.

78-LD- CW Discharge Tower It is concrete type building


26 0036 and like to like Isolation valve is
replacement is suitable available near to
for constructability wise the building.
and to avoid civil work,
new supports, and major
modification in this area.

66-LD- Fire water Area Piping routing shown in


27 0023 the FEED is difficult to Existing piping
incorporate further same arrangement is
shall be studied for better captured from
option. site. Piping will
be studied and
modified
according to the
latest scope
information.

0500760-RT-00-AA-1202 Page 34 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 35 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

66-LD- Fire water Area 2” & 1” existing lines


28 0023 underground connection To confirm the
identified but it‟s user tie-in location
could not found. and clarify the
scope of
replacement TQ
shall be raised

78-LD- Main Potable Water As per FEED, The


29 0042 system Overflow line for main TQ to be raised
Potable water tank is not for confirmation
the SOW However as of Overflow line
discussed with AGP for main Potable
operation, this piping is water tank to add
not in good condition and into the detailed
need replacement. engineering
SOW.

Snap 33 SRU Area Tie-in Point confirmation


30 is required to identify the TQ to be raised
new potable water line for Tie-in Point
upto the pump skid edge Confirmation to
for Seal piping of pump. identify the
CS/SS break-up
If the existing piping is flanges of Seal
SS, then the replacement piping of pump.
will be upto the CS
connection.

Snap 34 Cooling water Pump Tie-in Point confirmation


31 House is required to identify the TQ to be raised
new potable water line for Tie-in Point
upto the pump skid edge Confirmation to
for Seal piping of pump. identify the
CS/SS break-up
If the existing piping is flanges of Seal
SS, then the replacement piping of pump.
will be upto the CS
connection.

Snap 35 Cooling water Pump Drawing for this area is


32 House not available hence site TQ to be raised
verification is done with to request the
visual observation. relevant data.

0500760-RT-00-AA-1202 Page 35 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 36 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

68-LD- Jetty Area In the FEED 4” line is Piping GA for this


33 0022 shown as blinded while at Area to be
site 2” continuation line is request for this
found from downstream of area and the
4” isolation valve and it is extend of the line
connected to two users. need to be
One is Marine Building confirmed for tie-
and second is Marine in connection.
Security Building.

Snap 36 Process Train-1&2 As per FEED, Piping


34 modification is not Preliminary route
suitable at upstream of is suggested at
train 1&2 Pipe Rack, due site and shall be
to space constraints and finalized in 3D
congestion. model.

Snap 37 BOG Refrigeration One potable water branch


35 system line is not connected for To confirm the
Firewater Deluge system. tie-in location
These connection and clarify the
requirement needs to scope of
verify with COMPANY. connection TQ
shall be raised.

10 SITE OBSERVATIONS GENERAL

Preliminary points of note during site walk through are as follows

10.1 TQ’s and RFI’s

COMPANY informed to raise TQ‟s and RFI‟s where ambiguity exists and to formalize findings through
the same.

10.2 Model and Drawings

Certain Areas 3D Model is not available like North Corner of Jetty Area Sleepers, DEO Propane area,
C3 Loop Train 2. Firewater Area Piping.

Where observances have been made of new installations but absent on the drawings these drawings
and Model Zone will be requested via TQ‟s to COMPANY.

10.3 Future Site Visits

PIL and AI will jointly propose site visits during the detail design stage for areas to be revisited and for
requirements of specific area photography.

0500760-RT-00-AA-1202 Page 36 of 37
POTABLE WATER SYSTEM UPGRADE IN TRAIN-1&2 AT
RUWAIS
PROJECT NO. 0500760
AGREEMENT NO. OMR.21.100

EPC CONTRACTOR /
ENGINEERING SUB
SITE VISIT REPORT CONTRACTOR
ADNOC Gas Processing Page 37 of 37
Date 16 August 2021
DOC. NO. 0500760-RT-00-AA-1201 Rev. ZZ

For want of permit and paucity of time, certain areas could not be photographed. These will be taken in
forthcoming site visits.

COMPANY to provide photographs of Jetty Area and Sea Water Cooling Basin.

0500760-RT-00-AA-1202 Page 37 of 37