220517-Dt-Ca-Pred - Cim Report - Ge6.1mw - 120.9HH - Buried-Rv00
220517-Dt-Ca-Pred - Cim Report - Ge6.1mw - 120.9HH - Buried-Rv00
220517-Dt-Ca-Pred - Cim Report - Ge6.1mw - 120.9HH - Buried-Rv00
01
(SPAIN)
Client FORESTALIA
RECORD OF CHANGES
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 1/15
File name Document Identification Rev. 01
INDEX
1 AIM ................................................................................................................................. 3
2 SCOPE ............................................................................................................................. 3
4 DESCRIPTION ................................................................................................................. 6
5 VERIFICATIONS .............................................................................................................. 8
7 REFERENCES ................................................................................................................. 15
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 2/15
File name Document Identification Rev. 01
1 AIM
The aim of this report is to describe all the detailed calculations that have been carried out to
design preliminary a circular tapered foundation with anchor cage interface for a GE6.1-158
2 SCOPE
The scope is the description of all the necessary inputs, the verifications taken into account, its
results and a resume of the safety factors obtained for each requirement.
3 INPUT DATA
The foundation has been design for the following geotechnical parameters, according to reference
0:
Buoyancy: No
Exposure class: No
* If a wind turbine has its foundation on a slope or near slope, the effect of the proximity of the
foundation to a slope indicated in the regulations or reference guides, will be taken into account in
the calculation of the soil bearing capacity. In the case of very steep slopes, regardless of the soil
bearing capacity value of the terrain, the calculation of the safety against global stability shall be
carried out.
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 3/15
File name Document Identification Rev. 01
3.2 LOADS
The loads considered for the design are obtained according to the reference 0.
An additional bending moment due to misalignment has been taken into account: Ma(kNm)=4269
KNm, according to reference 0. This moment will be arrange at the tower bottom with the
appropriate safety factors and it will be added to the moments Mr of the following tables.
The maximum abnormal extreme loads given at the tower bottom are the following, without
The maximum normal extreme loads given at the tower bottom are the following, including safety
factors:
Quasi-permanent loads given at the tower bottom are the following, without including safety
factors:
Overturning loads given at the tower bottom are the following, without including safety factors:
Sliding loads given at the tower bottom are the following, without including safety factors:
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 4/15
File name Document Identification Rev. 01
Shear failure loads given at the tower bottom are the following, including safety factors x1.35:
The rotational dynamic spring stiffness of foundation is 1.50E11 Nm/rad and rotational static
3.3 MATERIALS
The materials used for the calculation and their main characteristics are the following:
Concrete:
Pedestal concrete:
- *HA-50/F/20/XC2
- fck=50 MPa*
- Density: 25 kN/m3
Slab concrete:
- *HA-30/F/20/XC2
- fck=30 MPa*
- Density: 25 Kn/m3
Blinding concrete:
- HL-150/B/20
Steel:
* In a detailed design it must be checked that pedestal and slab concrete qualities are
suitable.
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 5/15
File name Document Identification Rev. 01
VERIFICATION STRUCTURAL
Situation Favorable Unfavorable
Extreme Abnormal/Normal 0.9 1.1/1.35
Fz extreme Abnormal/Normal 0.9 1.1/1.35
Permanent/Dead Load 0.9 1.1
Operational Load 1.0 1.0
MATERIALS γ
Concrete 1.50
Steel 1.15
4 DESCRIPTION
As the slab is about a circular shape, load case with forces acting on a direction at 45 degrees from
the side of the foundation (diagonal case) has not been taken into account, because it is the same
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 6/15
File name Document Identification Rev. 01
The following pictures show the selected dimensions for the design of this foundation in
NOTE:
This design is valid for a covered up foundation, at a foundation level of -3.01m below
natural ground level to below to the lower level of the blinding concrete. In case of
executing a partial cover and/or with different foundation level, it must be studied the
support conditions and determinate the validity of the foundation, and specify the
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 7/15
File name Document Identification Rev. 01
5 VERIFICATIONS
5.1.1 OVERTURNING
Factored overturning load case has been considered as it is the most unfavorable one. The final
Overturning Verification
5.1.2 SLIDING
Factored sliding load case has been considered as it is the most unfavorable one and also buoyancy
force has been taken into account. The final safety factor for sliding should be greater than 1.10.
Sliding Verification
Condition 1: This verification has been made taking into account unfactored shear failure loads and
applying a safety factor of 3 to the soil bearing capacity. The safety factor must be greater than 1.
Analytical verification:
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 8/15
File name Document Identification Rev. 01
Maximum Z displacement of the foundation is 0.034788 m, so maximum soil stress (σ) taking into
Condition 2: This verification has been made taking into account factored shear failure loads and
applying a safety factor of 2 to the soil bearing capacity. The safety factor must be greater than 1.
Analytical verification:
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 9/15
File name Document Identification Rev. 01
Maximum Z displacement of the foundation is 0.040431 m, so maximum soil stress (σ) taking into
The safety factor is greater than 1, so the condition for soil bearing capacity is OK.
5.2.2 SETTLEMENTS
This verification has been made considering extreme loads and dead loads without safety factors
The following image shows Z displacements of the foundation in meters under unfactored extreme
abnormal loads.
(24.40·3mm/m=73.20 mm) is permitted to avoid too high displacements at upper flange of the
interface.
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 10/15
File name Document Identification Rev. 01
5.2.3 GAP
Condition 1: Unfactored quasi permanent loads and dead loads have been considered. No gap is
permitted.
Analytical verification:
GAP Verification
R (m) 12,20
2
Area (m ) 467,59
Ig (m 4) 17399,20
emin (m) 3,05
ereal (m) 2,97
e.min/e.real 1,03
The following image shows Z displacements of the foundation in meters under unfactored quasi
permanent loads.
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 11/15
File name Document Identification Rev. 01
Condition 2: Unfactored abnormal extreme loads and dead loads have been considered. A Gap up
The following image shows Z displacements of the foundation in meters under unfactored extreme
loads.
Figure 5-5 Z displacements under unfactored abnormal extreme loads (m) (GAP area in grey)
The GAP area is 35.21 m2, 7.55% of bottom area; therefore the condition for GAP is OK.
Quasi permanent loads and dead loads have been considered. The final safety factor shall be
This verification has been made considering the minimum static elastic modulus of the soil of 45
MPa.
Figure 5-6 Z displacements under unfactored operational loads at the top of the pedestal (m)
Myz 102253951Nm
K x 6.43 1010 Nm / rad K x ,lim 3.00 1010 Nm / rad
0.021994m 0.011969m 6.3m
Therefore the condition for rotational stiffness is OK.
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 12/15
File name Document Identification Rev. 01
Quasi permanent loads and dead loads have been considered. The final safety factor shall be
This verification has been made considering the minimum operational elastic modulus of the soil of
155 MPa.
Figure 5-7 Z displacements under unfactored operational loads at the top of the pedestal (m)
Myz 102253951Nm
K x 1.53 1011 Nm / rad K x ,lim 1.50 1011 Nm / rad
0.00748m 0.003277 m 6.3m
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 13/15
File name Document Identification Rev. 01
6 BILL OF MATERIALS
MEASUREMENTS
Work units Quantities
Slab concrete HA-30/F/20/XC2* (fck=30 MPa)* 605 m³
Pedestal concrete HA-50/F/20/XC2* (fck=50 MPa)* 18 m3
Blinding concrete HL-150/B/20 48 m³
Grout (fck=90 MPa)* 1.89 m³
Steel B-500-SD (fyk=500 MPa)** 77500 kg
Excavation volume *** 1926 m³
Refill volume *** 1229 m³
* In a detailed design it must be checked that pedestal and slab concrete qualities
excavation slope and the bottom of the excavation, then excavation volume and refill
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 14/15
File name Document Identification Rev. 01
7 REFERENCES
Referencias
“Foundation_Load_Drawing_6.1-158_50Hz_121mHH_PRD123_EN_r03”
“Foundation_Load_Drawing_6.1-158_50Hz_121mHH_PRD123_EN_r03”, “104W6205_A”,
“L200D_S4” y “L408_S9”.
[3] Geotechnical reports: e-mail 13/04/2022 “RE: Documentación necesaria para diseño
preliminar GE”
Normativa
Germanischer Lloyd (GL) Rules and Guidelines: IV-1 “Guideline for the Certification of
C/ San Roque 4, 09006 Burgos, Spain. - Tel. +34 947 218 542 - C/Oxford 30, Col. Juarez. Del. Cauhtemoc, Mexico D.F., DF, C.P. 06600-CR-06721 - Tel. +52 (55) 3658 8502 www.ms-enertech.com
pg. 15/15