EP-51658-P-CAE-0201 (00) Phase A TG CE
EP-51658-P-CAE-0201 (00) Phase A TG CE
EP-51658-P-CAE-0201 (00) Phase A TG CE
FOR
COMPANY:
Sonatrach
CONTRACTOR: CONTRACTOR REF:
Expro EP-51658
EXPRO P&IDs USED FOR THE GENERATION OF THIS REVISION OF THE CAUSE & EFFECT
LIST OF ABBREVIATIONS
1,3
1
P&ID No. :
PID-0203
PID-0204
TBC
-
HP SEPARATOR INLET EMERGENCY
EFFECT
EMERGENCY SHUTDOWN
Description
Rev 00 Fast Track
SHUTDOWN VALVE
HP COMPRESSOR
HP COMPRESSOR
BLOWDOWN
Action
CL
CL
CL
A
-
ESDV 5003
XA-XXXX
XA-XXXX
Tag No
ESD 0
ESD 1
CAUSE INITIATING DEVICE
SD I/L
Rev EXPRO P&ID No. Description Set Point Unit Voting TAG No D SB MO 1 2 3 5 8 9 10 11
LEVEL NO.
1. FOR COMPRESSOR CAUSE & EFFECT - REFER TO DOCUMENT (EP-51658-P-CAE-0202 (ZZ)) 1. TAG NUMBERS TO BE CONFIRMED
2. FOR FUEL GAS SKID CAUSE & EFFECT - REFER TO DOCUMENT (EP-51658-P-CAE-0203 (ZZ)) 2. FIBRE OPTIC CABLE SHALL BE INSTALLED AFTER FAST TRACK PHASE
3. 1 OUT OF N FIRE AND/OR 1 OUT OF N (40% LEL) GAS DETECTION SHALL INITIATE AN ESD SHUTDOWN AND IT IS CONSIDERED CONFIRMED (FIRE OR GAS DETECTION) 3. SDV REQUIREMENT DURING FAST TRACK PHASE (PLC TO BE CONFIGURED
WITH PROVISION TO OVER-RIDE THE ACTION INCLUDING LIMIT SWITCHES)