L&T Construction

Larsen & Toubro Limited


Water & Effluent Treatment IC

14th Lab Webinar Series

Water and Effluent Treatment IC I


L&T WET IC-Highlights L&T Construction

Beneficiaries Area Irrigated Drinking Water


95 Million 1 Million Ha 7200 MLD

Water Network
Wastewater Treated Smart Infrastructure
0.5+ Million kms
2100 MLD 7500 Ha

Water and Effluent Treatment IC I 2


L&T Construction

L&T Capabilities in Water &


L&T Water Technology Centre (WTC)
Innovative Methods

Dusk to Dawn-Network L&T Water Technology


Laying Centre

Treatment Technology
L&T AGBR Technology
Footprint

Water and Effluent Treatment IC I 3


Dusk to Dawn- Network Laying L&T Construction

Water and Effluent Treatment IC I 4


Dusk to Dawn- Testimonials L&T Construction

Testimonials

” Today we witnessed that L&T is L&T!”


Mr.Atul,
Resident of Civil TWP, Rourkela

” This will instil the thought that Sewer Network jobs


can be completed within the stipulated time!”
Mr.Mathiazhagan
AEE, TWAD, Coimbatore

” L&T started and finished the work before people


came out to work and children went to school with
no disruption.”
Mr.Bidadhar
Resident of Basant Vihar, Jhunjhunu

” This is the first time someone is taking up a feat of


such magnitude. All the best to Larsen & Toubro!”
Mr.Dinesh Goyal
SE, RUIDP, Jhunjhunu

In the news for good reasons…! ” It was a good experience to work for this initiative.
We feel proud in wearing this coverall. Excited to
“In future, all activities to be carried out by D2D. All Executive have completed this task successfully.”
Engineers to visit and learn from this project!” Mr.Mustak Ali
Workman, Jhunjhunu
-TWAD MD
Water and Effluent Treatment IC I 5
Treatment Technology Footprint L&T Construction

Bhatpara STP (FCR) – With a Coffee Shop Concept Moradabad STP: SBR Process

Jebel Ali STP: A2O Process BIDKIN STP: MBR Process

Water and Effluent Treatment IC I 6


Treatment Technology Footprint L&T Construction

UV-Varanasi Ozonation- Chandrawal UF- Doha

SWRO-Dahej Thermal Sludge Drying-Jebel Ali Auto. Sludge Bagging- Jebel Ali

Water and Effluent Treatment IC I 7


L&T Water Technology Centre (WTC) L&T Construction

Water and Effluent Treatment IC I 8


L&T Water Technology Centre (WTC) L&T Construction

WTC is committed to
fundamental, methodological,

Increase/Improve
and practice-based research with
Water Resources
focus on continuous R&D to Efficiency Energy
Energy Self- Consumption
innovate scalable solutions Sufficiency Chemical

Reduce/Decrease
Productivity & Usage
enabling L&T WET IC and beyond, Reliability Reliance on
Manpower
to meet present and future
water needs, to build safe,
resilient and sustainable eco-
systems. Water and Effluent Treatment IC I 9
L&T AGBR Technology L&T Construction

Intrinsic need for POWER


Attached Growth Batch Bio-Reactor
SAVINGS to enhance
Sustainability in operation

Need for a compatible


technology to meet
Governmental Regulations (NGT /
PCB) for sewage treatment

Land Stress for STP


Projects

L&T WET IC’s Patented Technology


Water and Effluent Treatment IC I 10
L&T AGBR Technology L&T Construction

The Process of Sewage Treatment


Tertiary – Advanced
Preliminary – Floating Primary – Solids Secondary/Biological - Micro Filter Treatment for Reuse
Matter/Grit Removal Removal Organics & Nutrient Removal

Raw Treated
Sewage Attached Growth Process Suspended Growth Process Water

Moving Bed Fixed Bed Biofilm Activated Sludge Sequencing Batch


Biofilm Reactor Activated Sludge Process Reactor

Rotating Biological
Contactors

Water and Effluent Treatment IC I 11


L&T Construction

Thank you

Leading innovations in water


Water and Effluent Treatment IC I 12