Professional Documents
Culture Documents
S&D Comparative HC PS Vs GTM2 As of Feb 12, 2024
S&D Comparative HC PS Vs GTM2 As of Feb 12, 2024
S&D Comparative HC PS Vs GTM2 As of Feb 12, 2024
ACH
Area Comm'l Opns Ana
ok
Gelverio, De Guzman, Banania
S&D COMPARATIVE HEADCOUNT - METRO NORTH
ACTUAL VS SWIFT/PLAN VS GTM2.0 AS OF FEB. 12, 2024
RSM 8
TM 22
KOM 39
KOS 19 101
TC 8
BDM 1
BDO 2
RCH 1
GTMM 1
Market Analyst 1
TMM 0
TMO 0
Mktg Asst 0
MEA 1
Cooler Tech 3
106 ok
106
1
S&D COMPARATIVE HEADCOUNT - STRO
ACTUAL VS SWIFT/PLAN VS GTM2.0 AS OF FEB. 12, 2024
SGM/Plan
Actual-REG
RCH 1
GTMM 1
Market Analyst 1
3
MARKETING:
TMM 1
Marketing Asst 1
TMO 1
MEA 0
Cooler Technician 0
3
STO TOMAS PB:
RSM 2
TM-KOM 1
TM-EDS 4 5 5
KOM 7 8
KOS 8 12 4
TC 1
OPA
23
BATANGAS:
RSM 1
TM-KOM 1
TM-EDS 6 7 7
KOM 3 6
KOS 6 13 7
TC 1
OPA
18
SAN PABLO:
RSM 1
TM-KOM 0
TM-EDS/STAR-D 3 3
KOM/KOS 3 4
TC 1
OPA
8
LUCENA:
RSM 1
TM-KOM 0
TM-EDS 5 5
KOM/KOS 5 6
TC 1
OPA
12
CALAPAN:
RSM 1
TM 1 1
KOM/KOS 2 4
4
TOTAL STRO 71
RSM 6
TM 21 21
KOM 20
KOS 14 39
TC 4
RCH 1
GTMM 1
MA 1
TMM 1
TMO 1
TMA 1
MEA 0
Cooler Tech 0
71
71
1
S&D COMPARATIVE HEADCOUNT - BRO
ACTUAL VS SWIFT/PLAN VS GTM2.0 AS OF FEB. 12, 2024
TOTAL BRO 33 33
RSM 3 3
TM 6 9 6 1 on D/A
KAM 2 1
KOM 10 13
KOS 5 0 22
TC 2 2
RCH 1 1
GTMM 0 0
MA 1 1
TMM 0 1
TMO 1 1
TMA 1 0
MEA 0 1
Cooler Tech 0 0
32 33
33
1
S&D COMPARATIVE HEADCOUNT - LUZON 1
ACTUAL VS SWIFT/PLAN VS GTM2.0 AS OF FEB. 12, 2024
METN METS
Actual applicants interviewed 6 1
Actual applicants that passed with GM 6 1
Actual applicants that started Day 1 classroom training with HQ 0 0
Actual applicants undergoing 2-day Field work at BU 0 0
Actual applicants officially deployed/ACTIVE - TOTAL OF KOM & KOS 58 32
Applicants for Deployment on February 16 2 4
60 36
2024 AOP/ PLAN 101 41
Balance to Hire as of Feb. 12, 2024 41 5
STRO BRO
0 2
0
0 0
0 0
32 15
3 0
35 15
39 22
4 7