Abu Dhabi Marine Operating Company

Technical Standards Document


GDL-009 (Rev. 1) August-2015

Guideline
for
Project Deliverables
(SELECT STAGE)

Copyright © 2015 Abu Dhabi Marine Operating Company – ADMA-OPCO. All rights reserved
Abu Dhabi Marine Operating Company
Guideline for Project Deliverables
GDL-009 (Rev.1)
(Select Stage)

Final Dossier
ADMA-OPCO Technical Authorities
Project Deliverables list in SELECT Stage Destination
Engineering TSS Assets

Proj. / Vend. Data Book


Projects Suppport Div.

PreComm, Comm. &


Projects Operations
Op. Tech. Support

Operating Manual
Drilling Div. (DD)
Commissioning &

Reservoir & Prod.


Mechanical Team

Civil & Structural

Op. Support Div.


Subsea Pipeline

Support (POS)
Electrical Team

Perf. Test Doc.


Logistics (LD)

Maint. Manual
Integrity (ID)
Process Team

Control Team

Div. (OTSD)
Ser .No Document Description

Pre-Project

Start-up

(RPOD)

As-Built
(PSD)

(OSD)
QA/QC
Team

Team
PMT

HSE
10.3.1 Project Management
10.3.1.1 Statement of Requirements for Select A R R R R A A
10.3.1.2 SOW for Select I A R R R R R R I R I R A R
10.3.1.3 Project Contracting Strategy A A A
10.3.1.4 Brief to Consultant (BTC) for SELECT I R A R R R R R R I R R R R R R
10.3.1.5 Input to Decision Support Package (DSP) A A A R R R R R R R R A A I
10.3.1.6 Basis of Design (Multi-discipline) A A R A R A A A R R
10.3.1.7 Lessons Learnt Report R A R R R R R R R R R R R R R
10.3.1.8 Independent peer review Report (IPR) A A R R
10.3.1.9 Project Co-ordination R A I
10.3.1.10 Interface Management Plan A A R R/I R I
10.3.1.11 Project Execution Plan A I A I I I I I I
10.3.1.12 Project Quality Plan A A I
10.3.1.13 Project Schedule-Select Study R A I I I I
10.3.1.14 Project Control Procedure A A A
10.3.1.15 Project Integrity Management Plan R A I A R I
10.3.1.16 Progress Measurement Procedure A A A
10.3.1.17 Management of Change Procedure A A A R I I I
(i)QA Plan for Select contractor (ii) ITP for SELECT (for sub contractors,
10.3.1.18 I R I
etc) if applicable A A A
10.3.1.19 Protection of Proprietary Information Procedure A A A I
10.3.1.20 Document Control Procedure A R A
10.3.1.21 Minutes of meeting A I A I I R
10.3.1.22 Project Progress Report I R A I I I
10.3.1.23 Statement of Requirements A R A R R R R R R R R R A
10.3.1.24 Subcontract Plan (if applicable) A A I
10.3.1.25 Project Planning Package A R A I I I
10.3.1.26 Document Status reports R I A I I
10.3.1.27 Cost Estimate report A A I
10.3.1.28 Engineering Close out report A A R R R R R R R I I I
10.3.1.29 Site visit Report (multi-discipline) A R R R R R R I R I I
10.3.1.30 QA Audit reports I A I R
10.3.1.31 List of proposed consultants R A

Page 1 of 11
Issue Date: August 2015 Copyright © 2015 Abu Dhabi Marine Operating Company – ADMA-OPCO. All rights reserved
Abu Dhabi Marine Operating Company
Guideline for Project Deliverables
GDL-009 (Rev.1)
(Select Stage)

Final Dossier
ADMA-OPCO Technical Authorities
Project Deliverables list in SELECT Stage Destination
Engineering TSS Assets

Proj. / Vend. Data Book


Projects Suppport Div.

PreComm, Comm. &


Projects Operations
Op. Tech. Support

Operating Manual
Drilling Div. (DD)
Commissioning &

Reservoir & Prod.


Mechanical Team

Civil & Structural

Op. Support Div.


Subsea Pipeline

Support (POS)
Electrical Team

Perf. Test Doc.


Logistics (LD)

Maint. Manual
Integrity (ID)
Process Team

Control Team

Div. (OTSD)
Ser .No Document Description

Pre-Project

Start-up

(RPOD)

As-Built
(PSD)

(OSD)
QA/QC
Team

Team
PMT

HSE
10.3.1.32 Operating, Maintenance & Integrity (OMI) Interface specific to project A R A A R
10.3.1.33 Reservoir Basis of Design A A A
10.3.1.34 Execution Strategy for next stage A I A
10.3.1.35 Project Progress Report R A I I I
10.3.1.36 Resource & Staffing Plan for next stage A A A I I I I I I I I
10.3.1.37 Project Risk Assessment & Management A R A I R
10.3.1.38 Input to next stage Consultant's SoW / BTC A A A A A A A A R R I R R
10.3.1.39 Equipment List (Multi-discipline) A R R R R R R R I
10.3.1.40 Option selection / Screening Study Report R A R R
10.3.1.41 Select Study Report / Dossier I A R R R R R R I I I A R
10.3.1.42 Level III detailed Project Schedule for DEFINE A A A I
Level II High Level – Overall Engineering Procurement Construction (EPC)
10.3.1.43 A A A I
Execution Schedule
10.3.1.44 Tie-in List R A R R R R R R R R R
10.3.1.45 Interfaces Management A R A R R R R R R R R R R R R R R R
10.3.1.46 Lessons Learning register A R A R R R R R R R R R R R R R R R
10.3.2 Maintenance & Integrity I
10.3.2.1 Project Integrity Management Plan R A I A R R
10.3.2.2 Mechanical handling & maintainability of equipments R A A R A I A R
10.3.2.3 Corrosion Risk Studies A R R A
10.3.3 Technology
10.3.3.1 Technology Evaluation and Selection report A R R I R I
10.3.3.2 Technology Risk Report A R R I R
10.3.3.3 Technology Qualification report A R R R
10.3.3.4 Technology Verification & Validation report A R R R R R A R R R
10.3.4 HSE
10.3.4.1 Project HSE Philosophy R A A R
10.3.4.2 Health, Safety and Environment Impact Assessment (HSEIA) Report I A A R
10.3.4.3 HSE Risk Register (SHEAMS) A R R
10.3.4.4 Project HSE Plan R A A
10.3.4.5 Risk Register I A A
Hazard and Operability (HAZOP)- Report / Close-Out Report (for Brown
10.3.4.6 I A A R R R R I I A I I R
Field Modifications only)
10.3.4.7 Project Health, Safety and Environment Review (PHSER) Report R A I I I I I I I A A I R
10.3.4.8 Adequacy of existing Safety Critical Equipment & Systems A R R R R R R A R R R

Page 2 of 11
Issue Date: August 2015 Copyright © 2015 Abu Dhabi Marine Operating Company – ADMA-OPCO. All rights reserved
Abu Dhabi Marine Operating Company
Guideline for Project Deliverables
GDL-009 (Rev.1)
(Select Stage)

Final Dossier
ADMA-OPCO Technical Authorities
Project Deliverables list in SELECT Stage Destination
Engineering TSS Assets

Proj. / Vend. Data Book


Projects Suppport Div.

PreComm, Comm. &


Projects Operations
Op. Tech. Support

Operating Manual
Drilling Div. (DD)
Commissioning &

Reservoir & Prod.


Mechanical Team

Civil & Structural

Op. Support Div.


Subsea Pipeline

Support (POS)
Electrical Team

Perf. Test Doc.


Logistics (LD)

Maint. Manual
Integrity (ID)
Process Team

Control Team

Div. (OTSD)
Ser .No Document Description

Pre-Project

Start-up

(RPOD)

As-Built
(PSD)

(OSD)
QA/QC
Team

Team
PMT

HSE
10.3.4.9 HSECES design philosophy A R A I R
10.3.4.10 Escape Route, Muster Station & Safety Signs Layout A A R
10.3.4.11 SoW for Next Phase HSE Studies A R A
10.3.5 General Engineering A
10.3.5.1 List of Applicable Standards part of Basis of Design (BOD)/SOW I A R R R R R R R R I I
10.3.5.2 List of engineering softwares to be used A A R R R R R R A I
10.3.5.3 Operating, maintenance & Integrity (OMI) Philosophy A R A A
10.3.5.4 Value Engineering Report & other Disciplines studies R A R R R R R R R R
10.3.5.5 Life cycle Cost Benefit Analysis Report I A A R R R
10.3.5.6 Constructability Review Report I A R R R R R R I R R R R A R
10.3.5.7 Discipline Eng. Design Audit reports I A R R R R R R I I
10.3.5.8 Discipline Technical Queries A I A R R R R R R R R I
10.3.5.9 List of all major equipment and potential suppliers R R A R
10.3.5.10 Material Selection Report A R R R A I
10.3.5.11 Preliminary Reliability Modeling A R A
10.3.6 Process Engineering
10.3.6.1 Description of Existing & New Facility I A A R R R R R I I I R A
10.3.6.2 Process Design Basis I A A I I R R R
Process Flow Diagrams, heat and material balance for Selected Option. PFD
10.3.6.3 I A A R R I R I R R
with Pre., Temp. & Flow info. For all the Screening Options
Utility flow diagrams, heat and material balance for Selected Option.
10.3.6.4 A A I R I R R
Schematics for all the Screening options.
Mark-up P&I Diagrams for Brown field modifications (Construction &
10.3.6.5 R A R R R R R R I R R A
Demolition) of existing facilities only
10.3.6.6 Adequacy check report for existing equipment / utilities I A R R R R R R R R I A
Major Equipment Technical Information (functional parameters) for selected
10.3.6.7 A R R R R R R R
option (as per SELECT class cost estimate) R I
Process datasheets for major Instruments for selected option (as per
10.3.6.8 A R A R
SELECT class cost estimate) I R
Flare relief & Blowdown Philosophy (Include in single Process Philosophy
10.3.6.9 I A A I
Document) R R
Flare relief & Blowdown Design Report (including preliminary Flare system
10.3.6.10 I A A I R
design) R

10.3.6.11 Vent & Drain philosophy (Include in single Process Philosophy Document) I A A I R R R R
R
Overpressure protection Philosophy -Include in single Process Philosophy
10.3.6.12 I A A R R I R R R R
Document) R

Page 3 of 11
Issue Date: August 2015 Copyright © 2015 Abu Dhabi Marine Operating Company – ADMA-OPCO. All rights reserved
Abu Dhabi Marine Operating Company
Guideline for Project Deliverables
GDL-009 (Rev.1)
(Select Stage)

Final Dossier
ADMA-OPCO Technical Authorities
Project Deliverables list in SELECT Stage Destination
Engineering TSS Assets

Proj. / Vend. Data Book


Projects Suppport Div.

PreComm, Comm. &


Projects Operations
Op. Tech. Support

Operating Manual
Drilling Div. (DD)
Commissioning &

Reservoir & Prod.


Mechanical Team

Civil & Structural

Op. Support Div.


Subsea Pipeline

Support (POS)
Electrical Team

Perf. Test Doc.


Logistics (LD)

Maint. Manual
Integrity (ID)
Process Team

Control Team

Div. (OTSD)
Ser .No Document Description

Pre-Project

Start-up

(RPOD)

As-Built
(PSD)

(OSD)
QA/QC
Team

Team
PMT

HSE
10.3.6.13 Isolation Philosophy I A R R R R R R R A
10.3.6.14 Operating Control & Emergency R A R R R R A R R R A
10.3.6.15 Hydraulic study report A A I I I I
10.3.6.16 Process Simulation Report A A I I
10.3.6.17 Pipeline Pigging Philosophy & provisions A R R I R R A R R
10.3.6.18 Multidisc. Site Visit report A R R R R R R R I
10.3.7 Process Safety
10.3.7.2 Case for safety report (preliminary) A R A R
10.3.7.3 HAZID - Report I A A R R R R R I A I I R
10.3.7.4 QRA- Qualitative Risk Assessment Report R A R R R R R R I A I I R
10.3.7.5 Gas Dispersion Modeling Study Report I A A I I I R I
10.3.7.6 Heat Radiation Dispersion Study Report I A A A I
10.3.8 Civil Engineering
10.3.8.1 Civil Engineering Design Basis I A A I I
10.3.8.2 Civil Layout I A A R
10.3.8.3 Soil Investigation Specification I A A
10.3.8.4 Building/ Structural General Arrangement & detail Drawings A R R R
10.3.8.5 Roads/ Bridges/ Culverts Layout & detail drawings A A I R R
10.3.8.6 Liquid Retaining structures design calculations A A R A A R R
10.3.8.7 Retaining Walls/ Embankments design calculations A A I I I
10.3.8.8 Retaining Walls/ Embankments detail drawings A A I I I
10.3.8.9 Blast proof design of buildings/ control rooms A A R I

10.3.8.10 General Arrangement and details of blast proof buildings/ control rooms A R R R R
10.3.8.11 Material Take-Off (MTO) (+/-30%) A R R R R R R
10.3.8.12 Global Inplace Analysis for platforms and Towers A A I
10.3.8.13 Jacket Elevation Drawings A A I I

10.3.8.14 Structure & equipment Weight Control Model requirement for next stage I A R R R A R R

10.3.8.15 Building/Machine foundation design calculation A R A


10.3.8.16 Building/Machine foundation drawings A R A
10.3.8.17 Jetty/Marine structures detail drawings (for jetty PPA approval) A A R A
10.3.8.18 List of applicable standards discipline wise A R R
10.3.8.19 Pipe Racks/Support frame detail drawings (for Brownfield only) A R A R
10.3.9 Architectural Engineering A
Page 4 of 11
Issue Date: August 2015 Copyright © 2015 Abu Dhabi Marine Operating Company – ADMA-OPCO. All rights reserved
Abu Dhabi Marine Operating Company
Guideline for Project Deliverables
GDL-009 (Rev.1)
(Select Stage)

Final Dossier
ADMA-OPCO Technical Authorities
Project Deliverables list in SELECT Stage Destination
Engineering TSS Assets

Proj. / Vend. Data Book


Projects Suppport Div.

PreComm, Comm. &


Projects Operations
Op. Tech. Support

Operating Manual
Drilling Div. (DD)
Commissioning &

Reservoir & Prod.


Mechanical Team

Civil & Structural

Op. Support Div.


Subsea Pipeline

Support (POS)
Electrical Team

Perf. Test Doc.


Logistics (LD)

Maint. Manual
Integrity (ID)
Process Team

Control Team

Div. (OTSD)
Ser .No Document Description

Pre-Project

Start-up

(RPOD)

As-Built
(PSD)

(OSD)
QA/QC
Team

Team
PMT

HSE
10.3.9.1 Architectural Design Basis A A
Architectural Layout Drawings for Buildings, Control Rooms, Switchgear
10.3.9.2 A A A A A R
Rooms, etc.
10.3.9.3 Elevation Drawings A A
10.3.10 Structural Engineering
10.3.10.1 Structural Design Basis A A I
10.3.10.2 Assessment of Platforms/Towers for structural adequacy A A R I
10.3.10.3 Scope of Work for Geotechnical Investigation A A
10.3.10.4 Local Inplace Analysis A A R
10.3.10.5 Weight Control Report A A R
10.3.10.6 Platform Pushover Analysis A A I
10.3.10.7 Platform Special Fatigue Analysis A A R
Structural framing drawings for Switchgear Rooms & other Building
10.3.10.8 A A A
Modules
STRUCTURAL INTEGRITY ASSURANCE REPORT OF
10.3.10.9 A A R
INTERFACING/ADJACENT FACILITIES
Structural Drawings
10.3.10.10 Jacket Elevation Drawings A R R
10.3.10.11 Jacket Horizontal Framing Drawings A R R
10.3.10.12 Deck Framing Plan Drawings A R I
10.3.10.13 Deck Truss/Elevation Drawings A R R
10.3.10.14 Bridge Plan & Elevation Drawings A R R I
10.3.10.15 Bridge Sections & Details A R R I
10.3.10.16 Helideck Layout/ Marking Drawings A R R I R A
10.3.10.17 Helideck Framing Drawings (Aviation Approval) A R I
10.3.10.18 Helideck Trusses A A I
10.3.11 Mechanical - Heating, Ventilation and Air Conditioning (HVAC)
Basis of Design and philosophies (Including Standby / Redundant operation
10.3.11.1 I A A R R R R R A
Philosophy)
10.3.11.2 General Arrangement Layout/Drawings A A R R R R R I R R
10.3.12 Mechanical-Static Equipment I
10.3.12.1 Preliminary RAM Studies
10.3.12.2 Packages & Equipment Design Basis I A R R R R R R R R

Page 5 of 11
Issue Date: August 2015 Copyright © 2015 Abu Dhabi Marine Operating Company – ADMA-OPCO. All rights reserved
Abu Dhabi Marine Operating Company
Guideline for Project Deliverables
GDL-009 (Rev.1)
(Select Stage)

Final Dossier
ADMA-OPCO Technical Authorities
Project Deliverables list in SELECT Stage Destination
Engineering TSS Assets

Proj. / Vend. Data Book


Projects Suppport Div.

PreComm, Comm. &


Projects Operations
Op. Tech. Support

Operating Manual
Drilling Div. (DD)
Commissioning &

Reservoir & Prod.


Mechanical Team

Civil & Structural

Op. Support Div.


Subsea Pipeline

Support (POS)
Electrical Team

Perf. Test Doc.


Logistics (LD)

Maint. Manual
Integrity (ID)
Process Team

Control Team

Div. (OTSD)
Ser .No Document Description

Pre-Project

Start-up

(RPOD)

As-Built
(PSD)

(OSD)
QA/QC
Team

Team
PMT

HSE
10.3.12.3 Reports on Mechanical adequacy of exisiting equipment A R A R R R R R
10.3.13 Mechanical-Rotating Machinery Equipment
10.3.13.1 General A A R R
10.3.13.2 Rotating Machinery Design Basis I A A I R
10.3.13.3 MACHINARY SELECTION CRITERIA I
10.3.13.4 Driver selection study report for major rotating equipment A I R R R R R I
Diesel Engines A R R I R R R R R
10.3.13.5 DIESEL SELECTION CRITERIA (TYPES CONSIDERING FUEL GRADES)
Gas Turbine A R R I R R R R R
10.3.13.6 Gas Turbine's SELECTION CRITERIA
Compressor A R R I R R R R R

10.3.13.7 Compressor's SELECTION CRITERIA (TYPES CONSIDERING VIBRATION)

10.3.13.8 Compressor Selection Study A A R R I


10.3.13.9 Driver Selection Study A A R R
10.3.13.10 API Compressor datasheet I A A R R I
Pump
10.3.13.11 PUMP SELECTION CRITERIA (TYPES CONSIDERING VIBRATION)
10.3.13.12 Pump's Mechanical Data Sheets I A R A R I R R
Fan R R
10.3.13.13 SELECTION CRITERIA
Gearboxes R R
10.3.13.14 SELECTION CRITERIA
10.3.14 Mechanical - Piping
10.3.14.1 Mechanical Handling philosophy A A R R R R R R
10.3.14.2 Plot Plan Design Criteria I A A R R R
10.3.14.3 Plot Plan (construction & demolish) A A R R R I R R I
10.3.14.4 Piping Design Basis I A A I R R
10.3.14.5 Preliminary Corrosion Management and Monitoring A R R A R
10.3.14.6 Piping Material Classification(Only Summary is required) A R A
10.3.14.7 Piping Arrangement Drawings (construction & demolish) A A R R R R

Page 6 of 11
Issue Date: August 2015 Copyright © 2015 Abu Dhabi Marine Operating Company – ADMA-OPCO. All rights reserved
Abu Dhabi Marine Operating Company
Guideline for Project Deliverables
GDL-009 (Rev.1)
(Select Stage)

Final Dossier
ADMA-OPCO Technical Authorities
Project Deliverables list in SELECT Stage Destination
Engineering TSS Assets

Proj. / Vend. Data Book


Projects Suppport Div.

PreComm, Comm. &


Projects Operations
Op. Tech. Support

Operating Manual
Drilling Div. (DD)
Commissioning &

Reservoir & Prod.


Mechanical Team

Civil & Structural

Op. Support Div.


Subsea Pipeline

Support (POS)
Electrical Team

Perf. Test Doc.


Logistics (LD)

Maint. Manual
Integrity (ID)
Process Team

Control Team

Div. (OTSD)
Ser .No Document Description

Pre-Project

Start-up

(RPOD)

As-Built
(PSD)

(OSD)
QA/QC
Team

Team
PMT

HSE
Material Selection Study, Corrosion Risk Assessment & Corrosion Monitoring
10.3.14.8 I A R A I I
Study report (Include Material selection Diagrams)
10.3.14.9 Tie-in List with Tie-In sketches A R R R R R R R A/R A A
10.3.14.10 Piping Tie-in Strategy A R R R R I R
10.3.14.11 Plant layout Study Report A R A I R R R
Safety Escape route Drawings (to be superimposed on the piping GA
10.3.14.12 A A R R R R A A
drawing)
10.3.14.13 Hydrostatic Test Specifications A A R R R
10.3.14.14 Material Selection Report A R R R
10.3.14.15 Piping Specifications A A R I
10.3.14.16 Piping support Specifications A R A A
10.3.14.17 Piping Support Drawings A R A A
10.3.14.18 Piping Welding Specifications A R A
10.3.14.19 Mechanical Handling Study Report A R R A A R
10.3.15 Pipeline (Onshore)
Design Dossier
10.3.15.1 Onshore Pipeline Design Basis R A R A R
10.3.15.2 Pipewall thickness calculation report R A R A I
Specification / Reports
10.3.15.3 Pipeline Route selection report R A R A R R A R
Drawings
10.3.15.4 Pipeline route drawing R A R A R R R R
10.3.15.5 Pipeline field layout drawings A I I
Pipeline (Submarine) Alignment Sheet, Crossings & Risers
10.3.16
Drawings
General
10.3.16.1 Pre Route subsea survey A A A R R
10.3.16.2 Offshore Pipeline Design Basis A A R A R

10.3.16.3 On-bottom Stability Analysis Pipeline/cable On-bottom Stability Analysis R A R A


10.3.16.4 Pipeline Expansion Analysis I A R A
10.3.16.5 Additional stabilization study for subsea cables A R R A
Specifications/Reports R R

Page 7 of 11
Issue Date: August 2015 Copyright © 2015 Abu Dhabi Marine Operating Company – ADMA-OPCO. All rights reserved
Abu Dhabi Marine Operating Company
Guideline for Project Deliverables
GDL-009 (Rev.1)
(Select Stage)

Final Dossier
ADMA-OPCO Technical Authorities
Project Deliverables list in SELECT Stage Destination
Engineering TSS Assets

Proj. / Vend. Data Book


Projects Suppport Div.

PreComm, Comm. &


Projects Operations
Op. Tech. Support

Operating Manual
Drilling Div. (DD)
Commissioning &

Reservoir & Prod.


Mechanical Team

Civil & Structural

Op. Support Div.


Subsea Pipeline

Support (POS)
Electrical Team

Perf. Test Doc.


Logistics (LD)

Maint. Manual
Integrity (ID)
Process Team

Control Team

Div. (OTSD)
Ser .No Document Description

Pre-Project

Start-up

(RPOD)

As-Built
(PSD)

(OSD)
QA/QC
Team

Team
PMT

HSE
10.3.16.6 Pipeline Route Selection Report A A A I A R
10.3.16.7 Cable Route selection report A A I A R
Preliminary MTO for line pipes, Cables, Bends, Pig Launchers & Recievers,
10.3.16.8 R A R R A I
Anodes, Fittings etc A
Scope of Work & tender Package for Pre-Engineering Pipeline Route Survey
10.3.16.9 A R
(Also to be reviewed by DED Survey Team) R A R R
Drawings A
10.3.16.10 Pipeline route drawing R A A I R A R
10.3.16.11 Pipeline field layout drawings R A I R A I R R R I
10.3.16.12 Platform Approach Drawings R A A R R R
10.3.17 Instrumentation & Control
Philosophy
10.3.17.1 Instrumentation & Control Philosophy R A A R A I R A A
10.3.17.2 Emergency Shutdown (ESD) Philosophy R A R A I I R A A A
10.3.17.3 Fire & Gas (F&G) Detection Philosophy R A R A I A A A R
10.3.17.4 Systems Interface Philosophy R A R A I R A R
Specifications / Reports

10.3.17.5 Instrumentation & Contro Design Basis I A R A I R R

10.3.17.6 Distributed Control System (DCS) System Specification A R A I R R


10.3.17.7 ESD System Specification A R A R R I
Supervisory Control and Data Acquisition (SCADA) / Remote Terminal Unit
10.3.17.8 A A R R I
(RTU) System Specifications
10.3.17.9 F&G Detection Specification A A R R R
10.3.17.10 Hydraulic Safety Shutdown System Specification A A R R R
Instrumentation & Control (I&C) SOW R
Calculation Sheets R
Power calculation for the equipment / Utility Consumption Estimate /
10.3.17.11 R A R A A
adequacy check / verification R R
10.3.17.12 System Architectural Diagram A A R R
10.3.17.13 System Block Diagram A A R A/R R
10.3.17.14 Control room equipment layout A A R R R
10.3.17.15 Preliminary Bill of Material A R
Report

Page 8 of 11
Issue Date: August 2015 Copyright © 2015 Abu Dhabi Marine Operating Company – ADMA-OPCO. All rights reserved
Abu Dhabi Marine Operating Company
Guideline for Project Deliverables
GDL-009 (Rev.1)
(Select Stage)

Final Dossier
ADMA-OPCO Technical Authorities
Project Deliverables list in SELECT Stage Destination
Engineering TSS Assets

Proj. / Vend. Data Book


Projects Suppport Div.

PreComm, Comm. &


Projects Operations
Op. Tech. Support

Operating Manual
Drilling Div. (DD)
Commissioning &

Reservoir & Prod.


Mechanical Team

Civil & Structural

Op. Support Div.


Subsea Pipeline

Support (POS)
Electrical Team

Perf. Test Doc.


Logistics (LD)

Maint. Manual
Integrity (ID)
Process Team

Control Team

Div. (OTSD)
Ser .No Document Description

Pre-Project

Start-up

(RPOD)

As-Built
(PSD)

(OSD)
QA/QC
Team

Team
PMT

HSE
10.3.17.16 Instrument Adequacy Report (Systems, valves, instruments as applicable) A R A R R R

10.3.18 Electrical
10.3.18.1 Electrical Design Basis R A A R R R R
Electrical Philosophy (including Protection control, Load shedding and
Synchronising black start, insulation coordination) Changeover (solar to
permanent power) (All Electrical Philosophies shall be added: (including
10.3.18.2 R A A A R R R
Lighting, earthing/ Lightening, Interlocking and Intertripping, Protection,
control, power management, Load shedding and Synchronising, black start,
insulation coordination, etc))
System configuration and Equipment selection report (techno-economical
10.3.18.3 R A R R R R R R R R R
selection report)
10.3.18.4 Power System Study report R A
a. Load Flow R A A A R R I
b. Contingency Analysis R A A R R R
c. Motor starting R A A A R R R I
d. Short circuit R A A A R I
e. Transient Stability (as required) R A A A R I
f. Transient and Switching Over voltage study (as required) R A R I
g. Arc Flash Study R A R R I
h. Transformer Energyzation Study (as applicable) R A R I I
i. Harmonic Analysis (as required) R A A A R I
Reactive Power compensation study/Power factor compensation (as
j. R A A I I
required)
k. Earth mat calculation study as applicable R A A R I
l. Project Specific technical reports R A A A R R R R
m. Sizing calculations for all major equipments A A A R R
n. Adequacy reports for all major equipment A R R R R R R R R
o. Solar System I A R A A R R R R R
p. Subsea Cable I A R A A R R R R R I
Normal and Emergency Power Availability and adequacy (including EDG
10.3.18.5 R A A A R R R R
adequacy)
10.3.18.6 Electrical Load List / Consumers list R A R R R R R R R R
10.3.18.7 Uninterruptible Power Supply (UPS) (AC/DC) Load List A R R R R R

Page 9 of 11
Issue Date: August 2015 Copyright © 2015 Abu Dhabi Marine Operating Company – ADMA-OPCO. All rights reserved
Abu Dhabi Marine Operating Company
Guideline for Project Deliverables
GDL-009 (Rev.1)
(Select Stage)

Final Dossier
ADMA-OPCO Technical Authorities
Project Deliverables list in SELECT Stage Destination
Engineering TSS Assets

Proj. / Vend. Data Book


Projects Suppport Div.

PreComm, Comm. &


Projects Operations
Op. Tech. Support

Operating Manual
Drilling Div. (DD)
Commissioning &

Reservoir & Prod.


Mechanical Team

Civil & Structural

Op. Support Div.


Subsea Pipeline

Support (POS)
Electrical Team

Perf. Test Doc.


Logistics (LD)

Maint. Manual
Integrity (ID)
Process Team

Control Team

Div. (OTSD)
Ser .No Document Description

Pre-Project

Start-up

(RPOD)

As-Built
(PSD)

(OSD)
QA/QC
Team

Team
PMT

HSE
10.3.18.8 Hazardous Area Classification R A R R R R R R

Engine Control Management System (ECMS) & Programmable Monitoring


10.3.18.9 System (PMS) configuration block diagram including typical Input / Output R A A R R R R I
(I/O) List & Instrumentation interface diagram

10.3.18.10 Other Relevant Documents


a. Data Sheets & Specifications for major equipment I A R R R R R R R R R R
b. Tie-in identification & list R A R R R R R R R R A
c. Shutdown requirements including outage optimisation report I A R R R A
Calculations
10.3.18.11 Major Power Cable sizing R A A A R R
10.3.18.12 All Major equipment sizing R A R R R R R R R R
10.3.18.13 Motor starting for major equipment R A A A R R
Layout
10.3.18.14 Sub Station Equipment layout I A A A R R R
10.3.18.15 Major Cable Routing Feasibility & Major Cable Route Layout R A A A R R R I
10.3.18.16 Hazardous Area Classification layout I A A R I R A R R
Drawings
10.3.18.17 Single Line Diagram (SLD)(Overall, General) R A A A I R R

Page 10 of 11
Issue Date: August 2015 Copyright © 2015 Abu Dhabi Marine Operating Company – ADMA-OPCO. All rights reserved
Abu Dhabi Marine Operating Company
Guideline for Project Deliverables
GDL-009 (Rev.1)
(Select Stage)

Final Dossier
ADMA-OPCO Technical Authorities
Project Deliverables list in SELECT Stage Destination
Engineering TSS Assets

Proj. / Vend. Data Book


Projects Suppport Div.

PreComm, Comm. &


Projects Operations
Op. Tech. Support

Operating Manual
Drilling Div. (DD)
Commissioning &

Reservoir & Prod.


Mechanical Team

Civil & Structural

Op. Support Div.


Subsea Pipeline

Support (POS)
Electrical Team

Perf. Test Doc.


Logistics (LD)

Maint. Manual
Integrity (ID)
Process Team

Control Team

Div. (OTSD)
Ser .No Document Description

Pre-Project

Start-up

(RPOD)

As-Built
(PSD)

(OSD)
QA/QC
Team

Team
PMT

HSE
10.3.18.18 Independent Switchboard/DBs SLDs A A A I R I
10.3.18.19 Cost estimate report R A A R
10.3.19 Marine Facilities and Operations A R R A
10.3.20 Construction
10.3.20.1 Construction strategy A I A R I R
10.3.20.2 Constructability Review R I A R R R R R R R
10.3.20.3 Identification of Early Tie-inns (For Each Discipline A A R R R R R R R R R R R R R A
10.3.20.4 Tie-inns (discipline wise) site verification & Confirmation Report A A R R R R R R R R R R R R R A
Identification , Verification of Tie Inns(discipline wise ) that require no
10.3.20.5 A A R R R R R R R R R R R R R A
shutdown
Identification , Verification of Tie Inns(discipline wise ) that require partial
10.3.20.6 A A R R R R R R R R R R R R R A
or Common shutdown.
10.3.20.7 High level Tie Inns Strategy A A R R R R R R R R R R R R R A
10.3.20.8 Production outage optimization study A A R R R R R R R R R R R R R A
10.3.20.9 Early Tie Inns (discipline wise ) Execution Plan / contracting Strategy A A R R R R R R R R R R R R R A
Detailed Early Tie Inns (Discipline wise) construction package including
10.3.20.10 A A R R R R R R R R R R R R R A
resources loaded schedule
Operations Readiness Reviews (GDL-14) during Select , Define and
10.3.20.11 A A R R R R R R R R R R R R R A
Execute
10.3.20.12 Commissioning
10.3.21 Telecommunication To be reviewed by IT & Digital Oil field
10.3.21.1 Telecommunication Philosophy A R R R R
10.3.21.2 Telecommunication Design Basis A R R
10.3.21.3 Submarine Fiber Optic Cable (FOC) network study A R R
10.3.21.4 Preliminary MTO of Telecom System A R R R
10.3.21.5 Overall System Block diagram - Telecom A R R R
10.3.21.6 Preliminary main cable route drawings (Telecom and FOC) A R R
10.3.21.7 Punch list management A R R R R
10.3.21.8 Asset registration document A R R R A R
10.3.21.9 Drawing and Documentation format approval (DED review also) A R R R
Special authority / govt agency approval / certification (To be defined
10.3.21.10 A R R
specifically each time)
Operation Readiness in each stage Select, FEED and Construction and
10.3.21.11 A R A R R R R R R R R R R R R A R R
Startup reviews
10.3.21.12 A R R R R R R R R R R R
PRODUCTION SHUTDOWN OUTAGE OPERATION REPORT (HIGH LEVEL)
10.3.21.13 Legal and insurance requirements (with LID & CD) R A

Page 11 of 11
Issue Date: August 2015 Copyright © 2015 Abu Dhabi Marine Operating Company – ADMA-OPCO. All rights reserved