To,
Commissioner
Municipal Corporation Jalandhar,
Rajinder Nagar, Jalandhar,
Punjab, Pin: 144001
Ref:
(1) Your SLD & BOQ received Dtd: 27-02-2024
(2) Our Telephonic discussion on Dtd: 27-02-2024
Subject: Offer for Electrical Design & Engineering (D&E) for Jalandhar E-Bus Depot as per defined Scope
Dear Sir,
We NEWATT ELECTRIC Private limited thank you having detailed discussion and request you to go through below
attached offer & scope of work.
Preparation of Tender Single Line Diagram (SLD) in compliance with relevant industry Indian standards, IS
codes, and CBIP regulations in the electrical design to ensure compliance with safety and performance
requirements.
Preparation of Loss Calculation and Efficiency report for Complete EV Charging hub and suggesting load
requirement to Jalandhar Municipal Corporation.
Preparing detailed Tender Electrical Bills of Quantity (BOQ) in congestion with approved Single Line
Diagram (SLD) considering following
"We extend our formal expression of interest to collaborate with Municipal Corporation Jalandhar for the Design &
Engineering project, aiming to establish a strong foundation for future successful partnerships."
Total Man-Hours 38
Our Standard Productivity rate per skilled Power system Engineer is ₹ 4500 INR per Hour. Total working cost for
complete project will be 38 hrs. x ₹1650 INR = ₹ 62,700/-
Total Summed up cost is ₹ 62,700/- INR for above mentioned Scope of work.
We are very confident that our offer is in line with your requirement.
Should you desire any additional information/clarification please feel free to contact us.
GST to be applicable on above chargers as per the payment cycle agreed by the Jalandhar Muncipal
corporation and NEWATT ELECTRIC
Validity This offer is valid for your kind Consideration till 27/02/2024 to 15 days from the date of
offer.
Price Basis As per the Scope of work mentioned above in the offer.
HSN Code 998335
GST Extra as applicable. Presently we are Charging GST @ 18%
Delivery Each Deliverable will be submitted in time frame of 4-6 days from the date of receipt of
Work Order considering working hours of office.
Terms of Payment 50% Payment as advance against PI & full with taxes/duties on each month end.
Director