FORM Form Q 04

Summary of Tank Inspections

Master / ‫ الربان‬: Month / ‫ شهر‬:


Back / ‫السابق‬ Vessel / ‫ السفينة‬: Year / ‫ سنة‬:
Summary of Tank Inspections / ‫ملخص معاينات الخزان‬
CONDITION/ ‫الحالة‬
G=GOOD / F=FAIR / R=RUSTY IN % / A=ACTION CARRIED OUT / L=LEAK FROM APC / D=SHELL INTERNAL DAMAGE

SENSOR CONDITION ‫حالة الحساس‬


W = WORKING / NW = NOT WORKING

COMPARTMENT 1.INSP. / No. # 1.INSP. / No. # 1.INSP. / No. # 1.INSP. / No. #


‫القسم‬ 2020 2021 2022 2023
FOREPEAK 18-Jan-16 W G
NO 1 W . B .T (S)
NO 1 W . B .T (P)
NO 2 W . B .T (S)
NO 2 W . B .T (P)
NO 2 F.O.T (CR)
NO 3 W . B .T (S)
NO 3 W . B .T (P)
NO 3 F.O.T (CR)
NO 4 W . B .T (S)
NO 4 W . B .T (P)
NO 4 F.O.T (CR)
NO 5 W . B .T (S)
NO 5 W . B .T (P)
NO 5 F.O.T (CR)
DRINK.W.T (S)
DIST.W.T (P)
F . W .T (P)
F . W .T (S)
F.O. SETTLING TK (ME) 30-Jun-16
F.O. SERVICE TK (ME) 30-Jun-16
F.O. SETTLING TK (AE) 31-Jan-19
F.O. SERVICE TK (AE) 31-Jan-19
AFTER PEAK TANK
** THE REMAINING TANKS WILL BE INSPECTED AT NEXT POSSIBLE OPPORTUNITY
‫الخزانات الباقية سوف يتم فحصها بالفرصة الممكنة التالية‬
23.07.15: Port side heeling Tank sensor replaced by another type which read double of the actual sndg. ‫حساس صهريج االمالة‬
‫جانب أيسر تم استبداله بنوع آخر يقرأ قياس حقيقي مزدوج‬
Req'n sent for same type / ‫الطلب ُأرسل لنفس النوع‬
3 DB SB SENSOR REPLACED ON 01.11.04
2 DB P&S SENSOR REPLACED ON 08.11.04 ‫ كبير الضباط‬/ ‫كبير المهندسين‬
3 CL DB SENSOR REPLACED ON 10.03.05 Chief Mate / Chief Engineer
4DB SB SENSOR REPLACED ON 11.03.05

Revision: 01.July.2022 Approved by MD Page 1 of 1