Contract
Contractor Name: Project Type:
No.:
1.2 Attaching all the required Incompetent assigned personnel. Significant property and All the involved personnel dealing with all the required documents
documents such as a related Unidentified or incomplete hazards appurtenances damage shall be qualified, competent and trained.
checklist, risk assessment, and risk information. Safe work practice shall be identified to reduce the possibilities of
method statement and other accidents/incidents.
forms necessary to fulfill the Ensure that all required supporting documents shall be available as
request. per PTW requirements.
All the required related documents as identified to be attached in
PTW shall be reviewed and evaluated by issuer and receiver to
ensure that all hazard and risk is identified and complete.
1.3 Verifying the site condition as per Open areas, protruding sharp objects, Loss of production The workplace shall be pre-checked, free from any obstruction and
requirements mentioned in the falling objects limited illuminations Accident resulting serious in safe good working conditions prior to a combined verification
application of Permit to Work by and other construction hazards may injury or death to worker visit.
both the Permit Receiver and cause accidents during the All Issuer and receiver must be aware of the hazard present in the
Permit Issuer. verification visit. area and must be familiar with the ingress and egress of the
Unfamiliarity with access to the project site.
areas.
1.4 Issuance of approved Permit to Untrained personnel. Significant cost due to Permit Issuer and Receiver must be qualified, trained and
Work from Permit Issuer to Incomplete information on Permit to damages competent.
Permit Receiver. work. Permit Issuer shall ensure that the site was visited to ensure that
workplace hazards and risks are adequately identified and
mitigating measures shall be established.
Permit Issuer and Receiver shall ensure that all the information
required in the permit to work is reviewed, completed and signed.
1.5 Verifying the approved Permit to Inadequate coordination and area Governmental violation Permit to Work shall be displayed at the worksite
Work by the assigned SEC control protocol. Environmental complaint Permit Receiver shall not leave the area for the whole duration of
Consultant. Unauthorized work to be performed permit to work.
within a defined location and Work shall not proceed without the presence of approved PTW
boundary. and the Permit Receiver overseeing the activity.
Permit Receiver shall account all workers under his Permit to Work
before the start of work.
Work shall not be started until duly approved Permit to Work is
available at the site and that Safety Toolbox meeting was
conducted.
Overhead / nearby obstructions. Significant property and Safety signage shall be posted to communicate the hazards and
heavy equipment damage activities.
Contact in live electrical Verification of Crane Operator’s 3rd party certification and Trailer
lines can cause property Drivers driving license before allowing them to enter the site.
damage and serious injury, Responsible Engineer and his Supervisor/ Foreman inspection of
fatality exclusion zone/staging area for compaction and level of the
ground.
Identify the required speed limit for moving heavy equipment.
Supervisor/Foreman with the Crane/Trailer operator making a
walkthrough of the access and work area before entering the site.
Ensure that all obstructions were removed.
3.2 Set-up the crane near the Inexperienced or untrained Significant cost due to Only designated trained operator shall operate the equipment.
unloading area with outrigger personnel. damages. Ensure that the ground is well compacted according to the
fully extend. Un-compacted ground. Property damage due to activity’s requirement.
Defective equipment. fall of materials Pre-operational check-up and verification of third-party certificate
Defective outrigger pad. Damage to asset and of equipment.
equipment Ensure that equipment is equipped with a good condition
outrigger pad.
3.3 Simulate the boom swing to Adjacent or nearby structures. Struck by moving Ensure that the area is clear of any obstruction within the reach of
ensure that no adjacent structure Unauthorized personnel. equipment can lead to the crane’s boom.
will be affected during the lifting. injury Only trained and designated operators to operate the crane.
Serious accident to Ensure the area is free of unauthorized personnel.
personnel that may lead to
severe injury or fatality
3.4 Position the trailer in the front of Unassisted maneuvering of heavy Collision on other vehicle Provide flagman and spotter to guide the trailer operator when
the crane in reverse position. equipment. or equipment can result maneuvering for its position.
Trailer blind spot. property damage and/or Only a competent flagman/spotter shall guide the trailer when
Unauthorized personnel. injuries to the worker maneuvering and positioning.
Inexperienced or untrained operator. Struck by moving Verification of Trailer Driver’s driving license before allowing them
equipment can lead to to enter the site.
injury
Serious accident to
personnel that may lead to
severe injury or fatality
OHS Forms Procedure Reference Revision Number Revision Date
Page |5 JOB SAFE PROCEDURE OHS-PR-09-03-F07 (A) 0 MAY 2021
HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
OHS-PR-09-03-F07 (A) JOB SAFE PROCEDURE
3.7 Install barricade around the Improper manual handling. Muscular injuries (Back Proper manual handling techniques must be observed at all times.
working radius of the crane. Exposure to sharp and pointy pain, strain, fractures) All personnel must be equipped with appropriate PPEs such as (list
materials. Illness due to bad all applicable PPEs for the task).
Exposure to dust. ergonomics Continuous monitoring of weather conditions.
Adverse weather conditions. Heat Stress (stroke, cramps, Work suspension in case of inclement weather conditions.
skin rashes etc.) Provision of sufficient breaks and rehydrating drinks for all
irritation to the eyes, skin personnel during hot weather conditions.
and respiratory tract Provision of rest shelter for all personnel.
4. Installation of Suspension / Tension Insulators
4.1 Mobilize and prepare the tension Improper manual handling. Muscular injuries (Back Use a mechanical device in handling large or heavy materials.
insulators at the ground directly Lifting heavy materials. pain, strain, fractures) Buddy system in handling large and/or heavy materials must
below to where it will be Contact with sharp and protruding Illness due to bad always be observed.
installed. edges. ergonomics The use of proper and appropriate PPE such as (list all applicable
Improper transporting of materials. Significant property and PPEs) must always be observed.
Unsecured materials. heavy equipment damage Ensure that all materials and equipment are properly secured on
Uneven pavement or ground. Injury due to Slip, Trip and the transporting vehicle or equipment.
OHS Forms Procedure Reference Revision Number Revision Date
Page |6 JOB SAFE PROCEDURE OHS-PR-09-03-F07 (A) 0 MAY 2021
HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
OHS-PR-09-03-F07 (A) JOB SAFE PROCEDURE
Transporting equipment in poor fall on the same level An area survey must be done on the route to be taken prior to the
condition. Heat Stress (stroke, cramps, start of transportation.
Adverse weather conditions. skin rashes etc.) Ensure that access is clear and pavement or ground are even and
irritation to the eyes, skin well compacted.
and respiratory tract Ensure that transporting equipment or vehicle are properly
inspected and in good working conditions prior start of the
activity.
Ensure that weather condition is taken into consideration prior
start of the activity.
4.2 Check for damage, crack or Unqualified personnel. Damage to asset and Only trained, experienced and with technical knowledge personnel
defect accessory. equipment shall be doing the inspection.
4.3 Install the tower attachment for Ergonomics (awkward posture). Muscular injuries (Back Maintain natural body posture as much as possible while
the tension insulators. Unqualified personnel. pain, strain, fractures) performing the task.
Exposure to sharp and pointy Illness due to bad Assign experienced personnel for the task.
materials. ergonomics All personnel must be equipped with appropriate PPEs such as (list
Significant property and all applicable PPEs for the task).
heavy equipment damage
Cuts/pinch/crash points
resulting hand injuries
4.4 Install soft lifting gear such as Unqualified personnel for slinging. Damage to asset and Only trained and certified rigger shall be doing the rigging or
nylon sling or equivalent gears to Improper slinging. equipment slinging.
hoist the insulator to the tower. Ensure appropriate lifting gears are used for the activity.
4.5 Prepare workers on a man basket Uncertified man basket. Serious accident to Ensure that man basket provided is third party certified.
to work for the installation of the Untrained or unqualified personnel. personnel that may lead to Pre-inspection of man basket to ensure it is in a good and safe
tension insulators. Incomplete or lack of required PPE. severe injury or fatality condition.
Significant property and Ensure personnel working on the man basket are equipped with
heavy equipment damage FBH meeting the SEC set standards.
4.6 Lift the tension insulators to its Unqualified personnel. Serious accident to Only trained and experienced personnel shall be operating the
designed location using a crane Abrupt lifting. personnel that may lead to lifting equipment.
or winch machine. Unauthorized personnel. severe injury or fatality Gradual lifting to avoid any sudden movement or swaying.
Adverse weather conditions. No unauthorized person shall be allowed in the working area.
No person shall be allowed to stay under suspended load at any
time under any circumstances.
OHS Forms Procedure Reference Revision Number Revision Date
Page |7 JOB SAFE PROCEDURE OHS-PR-09-03-F07 (A) 0 MAY 2021
HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
OHS-PR-09-03-F07 (A) JOB SAFE PROCEDURE
7.4 Sweeping and cleaning the area. Inadequate PPE Hand injuries due to Appropriate personal protective equipment should be observed
Presence of waste material contact with sharp tools like coverall, hand gloves, eye protection, and etc.
Inappropriate tools and objects Observe the “use the right tool” rule.
Slip and trip Close supervision by the Engineer, Supervisor or Foreman must
observe.
8. Closing of Permit to Work
8.1 Returning of the Permit to Work
to Permit Issuer for closing.
8.2 Verifying the site condition as per Poor housekeeping. Environmental complaint Permit Receiver shall ensure that housekeeping is done before,
requirements mentioned in the Undisposed waste materials. Accident resulting serious during and after the work.
closing of Permit to Work by both Unaccounted workers. injury or death to worker All waste materials generated from the work shall be properly
the Permit Issuer and Permit Unsecured electrical equipment Governmental violation disposed of and shall not be left unattended at the worksite.
Receiver. /energized equipment. Accident resulting serious Electrical equipment shall be properly secured, distribution board
Poor storage of chemical, flammable injury or death to worker closed and padlocked.
and combustible materials and etc. Significant cost due to All materials used at the site such as chemicals, flammable and
Unattended unsafe condition. combustible materials shall be stored at the designated storage at
OHS Forms Procedure Reference Revision Number Revision Date
P a g e | 14 JOB SAFE PROCEDURE OHS-PR-09-03-F07 (A) 0 MAY 2021
HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)
OHS-PR-09-03-F07 (A) JOB SAFE PROCEDURE
Unfamiliarity with access to the areas damages the end of each day.
and the present construction hazard. Mobile equipment shall properly park on a designated equipment
laydown.
Ensure that all workers are accounted and there was no
incident/accident occurred which is not reported.
All Issuer and receiver must be aware of the hazard present in the
area and must be familiar with the ingress and egress of the
project site.
8.3 Signing/clearing of the Permit to Inadequate communication. Significant property and Work permit issuer and receiver must be qualified, trained and
Work by the Permit Issuer upon Untrained personnel. appurtenances damage competent.
verification of site condition and Proper communication should be observed.
satisfactorily comply with the
requirements mentioned.
8.4 Keeping and recording of the
completed and signed Permit to
Work by ensuring that the permit
to work register is duly
accomplished.