Download as pdf or txt
Download as pdf or txt
You are on page 1of 179

Piping Training Institute

CADD LABS
EVERYTHING 3D
Text Book

Name
Course
Student ID
Batch
Date

E3D
Hard Work Never Fails
a
Syllabus

Volume-I Equipment 001

Volume-II Piping 055

Volume-III Structure 097

Volume-IV Electrical 145

Volume-V HVAC 151

Volume-VI Hangers & Supports 154

Volume-VII REPORT (MTO) 156

Volume-VIII Spooler & ISO DRAFT 157

Volume-IX DRAFT 160

Volume-X Commands 170

R
Volume-I EQUIPMENT

CHAPTER-01
Introduction about Piping & E3D, E3D Login and MDB, E3D Modules Introduction (like
equipment, pipe, structural, hangers & supports, cable tray, HVAC and report, ect…), advance
of E3D design concept, creation of Equipment, primitives & Standard Equipment, Electrical
equipment component and cut out Primitives.

CHAPTER-02
How to Create Nozzle, Nozzle Placement, type of Nozzles, Nozzle Orientation, Nozzle
Speciation Selection and Nozzle class selection, copy of primitive and offset, mirror and rotate.

CHAPTER-03
Equipment co-ordination, Position of equipment, create & Modi�ication of list, working with
3D view, using command window, using of Explicitly and Relatively position, basic equipment
creation, use of position control tool.

CHAPTER-04
creation of Standard Equipment in the library �ile, modify Property of the standard
Equipment, Equipment Speci�ication, modify the equipment properties, attributes, nozzle
speci�ication and equipment origin.

CHAPTER-05
Usage of the Model Editor Tool, edit settings, selection settings, How to use with the Model
Editor tool and model editor settings, set the increment of model editor, delete selection and
use of wholly/partially within.

CHAPTER-06
Creation Working Plane, Creating deferent shape use with Extrusion primitives And
Revolution Primitives, Creating Mitter Bends.

CHAPTER-07
Deals with the general settings, members, view settings and command
window, general query setting

Volume-II Pipe Work Modelling

CHAPTER-01
Basic of piping fundamental, create pipe, branch, and piping components, pipe work
hierarchy, pipe orientation, connecting pipe, placing pipe, branch replacing, create insulation
of pipe, create tracing of piping, material selection of pipe, connect method of pipe.

Page No: I
CHAPTER-02
pipe creation using explicit method, modi�ication of speci�ication, component
bore/speci�ication, Arrive & Leave, connection reference and slope, pipe createby model editor,
pipe create by command Line Material selection of pipe.

CHAPTER-03
orientation of component, branch connection, creating pipe assemblies, splitting pipe and
pipe isometric drawings system isometric drawings, data consistency error founding and auto
pipe router, pipe penetration, show pipe system.

CHAPTER-04
Positioning of branch piping components, maintaining bottom of pipe(BOP), Drag piping,
clash checking and pipe work toolbar.

Volume-III Structural Work

CHAPTER-01
Create a Structural hierarchy, how to set default pro�ile for section, set section storage area
and node storage area, working plane, plant grid, create a section using straight method,
curved method and ring method, regular structure.

CHAPTER-02
how to create tower using regular structure, description about upper & lower S.O.P, bracing
con�iguration and joint creation, base plate creation, foundation creation, 3 leg tower create
using grid.

CHAPTER-03
About modi�ication of section elements, creation of �ittings and positioning of section, creating
bracezing gap, Miter ends, Maintain Bracing gap, give the material about creating section.

CHAPTER-04
Section connection, orientation of structure, general settings and grid creation, structure
query settings, utilities setting like data checker, reference data, constructs, grid, user grid
system.

CHAPTER-05
Creation of panel, Panel Speci�ication Selection, Extrusion\Panel, negative extrusion, Level
Vertical, splitting of panel, positioning of panel and panel �ittings & connections and material
weight calculation

CHAPTER-06
creation of wall & �loor, modi�ication of wall & �loor, Apply Fittings for Walls & Floor, Mitre and
connection at wall ends, position & orientation of wall & �loor and connecting wall, Material &
a

Page No: II
CHAPTER-07
handrail and deletion of platform & handrail. Creation of Handrail and modify of Handrail.
Creation & modi�ication of stair �light, stair tower, ladder and circular platform
@90°,270°,110°.

Volume-IV Electrical Works

CHAPTER-01
Creation & modi�ication of cable tray, positioning of trays and general utilities. Modi�ication of
cable tray speci�ication

CHAPTER-02
Creation modi�ication of cableway, branch elements, route point, route node, route
attachment points and material control node, check connection, Dressing cableway system.
Cable tray support.

Volume-V HAVC

CHAPTER-01
Creating inline plant Equipment like AHU, DUCT Routing, Apply Grid and Tiles on grid,
creation of Hvac components, modi�ication of HVAC, positioning of duct, Speci�ication
Generator, Auto Fills with straights, surface area & weight and general utilities.

Volume-VI Hanger & Supports

CHAPTER-01
Creation of hangers & supports, modi�ication of hanger, pipe rack, con�iguration, positioning
of support, support plan, Support Relocation, max span, steel pro�ile, Support Axes and
general utilities.

Volume-VII Report Generation (MTO)

CHAPTER-01
report generation (MTO) using template, creation of template modi�ication of report and
�ilter report, pipe & steel MTO, Nozzle & valve schedule preparation, column report, report
summary and report format.

Page No: III


Volume-VIII Spooler & ISO Draft

CHAPTER-01
Fabrication Drawing, Advance isometric drawing, creation of spool drawing, �ield & shop weld
creation, spool break and isometric drawing of pipe, modify MTO status, convert to DXF, DWG
& DGN.

Volume-IX Drawing Manager

CHAPTER-01
Generating 2D view from 3D view, creation of department, sheet, user de�ined view, limits
de�ined view, modi�ication of sheet & view, creation of prede�ined frame. Intelligence text.

CHAPTER-02
Creation of 2d draft, shapes, symbols, text and modi�ication of dynamic primitives, sketch
Drafting, Load text, Add Local symbol, Symbol Library Demolish symbol, 3D Representation,
DB Listing, Dynamic primitives & Text and general utilities.

CHAPTER-03
Creation of Layers & Layer De�inition, create & Modify Labels, Linear & Angle Dimension, Edit
Dimension text, De�inition of Dimension, Modify of Dimension Color & Font, projection text,
Label de�inition, Auto Tagging, Auto Drawing Production, Visibility and placement, De�ine
Equipment centre Line and pipe end label.

CHAPTER-04
Section view generation, creation of section �lat, section perpendicular, stepped, Detail view,
Display 3d view, hatching rules , Schedule and Tagging, Auto Drawing production, converting
to dwg format and auto drawing production

Volume-X PDMS Commands

CHAPTER-01
Over all Clash checking, Auto clash, Auto Naming, Hole Management, Associations, Data base
export & import, export for other software format, 3D view options, Draw list, Hide �ile, New
Local view section, new clone view, Representation ,Setting and Auto color.
End

----Hard Work Never Fails----

For Jobs Placement : www.kagirajobs.com

For Online Training : www.onlinepiping.com


a
Class Room Training : www.kagira.com

Page No: IV
VOLUME-I

SL.No Title SL.No Title


SUB MENU
1 Intorduction 30 Show Attributes
2 Login 31 Delete
3 Project 32 Copy
4 User name 33 Paste
5 MDB ( Multiple Database ) 34 Measure
6 Modules 35 Undo
7 Read Only 36 Redo
8 Restore View
9 Graphical View VIEW
10 Command Window 37 Middle Button Drag
11 Model Explorer 38 Zoom Rectangle
39 Zoom in / Out
CREATE 40 Pan
12 Site 41 Rotate
13 Zone 42 Zoom To
14 Equipment 43 Walk To
15 Sub - Equipment 44 Save View
PRIMITIVES 45 Restore View
16 Box 46 Set Centre of View
17 Cylinder 47 Look > North / S/ W/ E/ D/ U
18 Cone 48 Paln > North / S/ E/ W
19 Dish 49 Isometric
20 Pyramid 50 Set Centre of View
21 Snout SAMPLE EX - 1 , 2
22 Rectangle Torus
23 Circular Torus
24 Add to 3d View
25 Add Connected
26 Add Within Volume
27 Remove to 3d View
28 Highlight
29 Un Highlight

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

Page No: 001


Introduction of E3D VOLUME-I
AVEVA Everything3D™ exploits the latest technology innovations in mobile computing,
Cloud computing to enable Lean methods in plant project execution. It takes the plant industry to a
new level of capability, reducing cost, timescale and project risk on projects of all sizes

Login E3D
START ALL PROGRAM AVEVA EVERYTHING 3D

AVEVA PDMS Login Dialogue box Displayed

Select the User from here

Enter correct Password

Select the MDB (Master Data Base) from here

You have to select required Module from the pull down menu

Username PIPER
Password (If the Password is incorrect you cannot select MOB)

MDB ALL ( It will be Same as user name Master Data Base )

Design - 3D Model Design


Draft - 2D Drawing Production
Isodraft - Isometric Drawing Production
Spooler - Pipe work spooling
Admin - Project/User Administration
Paragon - Catalogue and Specification Construction
Lexicon - User Defined Attributes and Element Type Creaeation

a
Click OK to get E3D Application

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Ph: +91 9500 100 966
Page No: 002
VOLUME-I

By default E3D window will show Model Explorer , Graphical view & Command window
If you close Model Explorer I Graphicalview & Command window you can reopen using the following

Home Model Explorer

3D View Empty view

Home Command Window

For Creating Equipment


Design Equipment

Create Site Zone Equipment Primitives

Data Stored in E3D

Page No: 003


VOLUME-I
VOLUME-I
VOLUME-I
VOLUME-I

EQUI-EX-002
VOLUME-I

EQUI-EX-003
VOLUME-I

EQUI-EX-004
VOLUME-I

SL.No Title SL.No Title


CREATE CLIP & CAP
51 Nozzle 63 Create
52 Nozzle Type 64 > Current Selection
53 Nozzle Attributes 65 > Current Element
54 Nozzle Orientate 66 With Mirror
ORIENTATE 67 Hide
55 Rotate 68 Cursor / Default
56 Advance Content
57 Orientate 69 Hide
COPY 70 Hide Selected

With Offset
71 Show last hidden
58
72 Show all hidden
59 WIth Rotate
73 Hidden list
60 Cursor / Element ,Default
74 Drawlist
61 With Mirror
75 Negative primitives
62 Cursor / Default
DELETE
76 Delete Selection
77 Current Element
78 Ce Members

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

Page No: 010


VOLUME-I
Axis

ix

Page No: 012


VOLUME-I
Common Rotate

Axis

Axis

Page No: 013


VOLUME-I
Common
VOLUME-I
Common With

Common > With

Axis

Common > With Mirror

Page No: 015


VOLUME-I

EQUI-EX-05

Page No: 016


VOLUME-I

EQUI-EX-06
VOLUME-I

EQUI-EX-07
VOLUME-I

SL.No Title SL.No Title


POSITION POSITION CONTROL
79 Move 96 Element
80 Position 97 Pline
81 Offset 98 P-Point
82 Advance > distance 99 Graphics
83 Current element as 100 Snap
Wrt Element 101 Mid Point
84 Current element owner as 102 Interest
Wrt Element 103 Cursor
85 Select World As Wrt Element 104 Aid
86 Pick Wrt Element 105 Screen
87 In Font 106 Any
88 Behind 107 Distance
89 On Top 108 Explicity Position
90 Under COLLECTION
91 From 109 System Collection
92 Towards 110 Shard Colection
93 Move > Through 111 My Collection
94 Move > Clreance
95 Move > Towards

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Ph: +91 9500 100 966
Page No: 019
Explicit VOLUME-I
Common Position

It is Used to check & Change the Co-ordinate value The Position area
allows each primitive to bepositioned with respect to (wrt) Wor1d This
form lets you position an element either by typing in co-ordinates or by
reference to the position of another design item.

Common > Position > Relative

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin
tower
Page No: 020
VOLUME-I
The pick method options determines how the position will be derived from subsequent cursor picks.
The currently selected mode is displayed in the prompt bar, immediately above the graphical view.

Snap
Selects the snap point nearest to the cursor pick point.

Distance
Applies the offset value, which is entered in the adjacent Method Value text-box (for example 500 gives a
point 500 mm from the nearest snap point, measured towards the cursor position; -500 gives a point 500 mm from the
nearest snap point, measured away from the cursor position).

Mid-Point
Derives the mid-point between two snap points along a linear item.

Intersect
Allows the user to pick two lines (any directional items) or three planes and then it derives
their intersection point.

Note: Linear items picked here do not intersect. Derived position is at projected intersection of second
picked item onto first picked item, so order of picking is significant.

Cursor
a Places the derived point exactly where the cursor picks on the element

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 022
VOLUME-I
Move > Distance

Element

Element

Element

Element

Element

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 023
Move > Through VOLUME-I

1. Select Object (N1) > Move> Through


2. Direction.E
3. ID Cursor
4. Identify Reference Nozzle N2
5. N1Nozzle has Aligned to N2 Nozzle

Element

Element

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 024
VOLUME-I

EQUI-EX-08
VOLUME-I

EQUI-EX-09
VOLUME-I

SL.No Title SL.No Title


Home EQUIPMENT
112 Display 132 Create > Equipment
113 > Properties 133 Create > Standard
114 > Attributes 134 Create > Copy Mechanical Equipment

115 Primitives 135 Create > Electrical


116 Modify > painter MODIFY
117 Picked element 136 Standard
118 Current element 137 Nozzle
138 Electrical
MANAGE 139 Origin
119 Modify 140 > Equipment Id Point
120 > Include 141 > Equipment Explicit
121 > Reverse 142 > Sub-Equipment Id Point
122 > Reorder 143 > Sub-equipment explicit
123 Modify lock 144 Tools
124 Re-evalute rules 145 > Inregrator mode
125 Break template link 146 > Design point
GENERAL
126 Craeate > standard model
127 Volumes > volumelink
128 Volumes > sub-volume
129 Area > world
130 Area > set
131 Area > definition

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 027
Locking/Unlocking Objects VOLUME-I
Tools

Tools

Manage

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 028
VOLUME-I
Manage

Manage

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 029
VOLUME-I

EQUI-EX-010
VOLUME-I

EQUI-EX-011
VOLUME-I

EQUI-EX-012
VOLUME-I

EQUI-EX-013
VOLUME-I

EQUI-EX-014
VOLUME-I

EQUI-EX-015
VOLUME-I

EQUI-EX-016
VOLUME-I

EQUI-EX-017
VOLUME-I

EQUI-EX-018
VOLUME-I

EQUI-EX-019
VOLUME-I

EQUI-EX-020
VOLUME-I

EQUI-EX-021
VOLUME-I

SL.No Title SL.No Title


DESIGN AIDS 167 Text
GRID ANNOTATIONS
147 Cylindrical 168 Text label
148 Rectangular tower 169 Orthogonal Dimensions
149 Triangular tower 170 Aligned Dimension
150 Grid plan GRIDS
151 Grid plane 171 Annotate
152 Grid cylinder 172 Dimension
153 Reset planes id 173 Change elevation label
CONSTRUCTION AIDS 174 > Local elevation
154 Point 175 > World elevation
155 Line 176 > Plane id
156 > Line 177 Grid text size
157 > Bisect between 2 lines 178 > Increase text size
158 > Tangent to 2 lines 179 > Decrease text size
159 Arc DESIGN AIDS
160 Snap To Point 180 Annotations
161 Feature Highlighting (F) 181 > Hide
162 > Center+sweep 182 Show
163 > Three point 183 Aids
164 > Two point 184 > Hide
165 Fillet 185 > Show
Faculty Signature Date

Faculty Name Time

SL.No Title SL.No Title


GENERAL
186 Extrusion
187 Revolution
188 Mitre bends
189 Revise commands

Faculty Signature Date

Faculty Name Time

a
Duration: 180 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 042
VOLUME-I

If Items are selected in the 3D design whilst in Model Editor Mode the Model Editor handle is displayed.The display
below shows the Model Editor Handles on Equipment.

Linear Moment:
A handle situated on the Locator Handle, which when selected for a drag operation, constrains
movement of the selection to be along the direction of the Selected Major Axis.

The Planar Movement Handle:


A handle situated on the Locator Handle, which when selected for a drag operation,constrains
movement of the Selection to be In the plane Indicatated by the planar movement handle.That Is the
XY, XZ or YZ plane of the Locator Handle.

The Rotation Handle:


A handle situated on the Locator Handle, which when selected for a rotation operation ,constrains
movement of the selection to be about the axis Corresponding to the selected rotation handle.

Undo / Redo:
Undo and Redo functions in Model Editor mode allow you to step backwards or forwards through
one or more movement or rotation operations. Undo and Redo operate on a sequence of direct graphical
manipulation operations in the Model Editor.

Move Selection:
Offset in 3D
The Move Selection from appears.Key In the distance to move the equipment and then click the Preview button,
If the position Incorrect than click the OK button if the position is incorrect c:lick the Cancel button.

It is a relative position

Set 3D Positiion
Set 3D Position of selection from appears. Key in the co-ordinate position of
the equipment and then click the preview button
If the position correct than click the OK button
If the position incorrect than click the CANCEL button.

It is a Explicit Position ( Co-ordinate Position )

Snap to Point
With the mouse button over the linear handle click the right mouse button and from the pop up select Snap to Point.Move the cursor over the
element, as the Cursor moves over the element & the graphical view displays the possible point positions i.e.P1 etc.. Once the point
required is selected release the mouse button and the equipment will be moved.
VOLUME-I
VOLUME-I

Feature Highlighting :
VOLUME-I

Wholly And Partially Within :

To Edit an Equipment Primitives :

To Select More Objects :


VOLUME-I

EQUI-EX-022
VOLUME-I

EQUI-EX-023
VOLUME-I

EQUI-EX-024
VOLUME-I

SL.No Title SL.No Title


219 Current element
HOME 220 Object
190 Selection > copy 221 Move
191 > Copy 222 3 Points
192 > Copy with base point 223 Control
193 Copy & paste
194 Paste WINDOW LAYOUT
195 Modify 224 Close
196 Stretch 225 New horizontal tap group
197 Mirror 226 New vertical tap group
198 Mark 227 Float
199 > Mark TOOLS
200 > Remark all 228 Display
201 > Remove all mark 229 Commands
202 Display 230 Explorers
203 Comments 231 Model
204 Properties MANAGE
205 Attributes 232 Query
VIEWS 233 Project
206 Settings 234 User status
207 Current view 235 History
208 Graphics 236 DB listing
209 Auto colour PROJECT
210 Monochrome 237 Coordinate
211 Views > copy 238 Explorer settings
212 > To a separate view 239 Properties
213 > To a cloned view 240 Units
214 > To a local view
215 New
216 Grid plane
217 Local coordinate system
218 World

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

Page No: 050


SHORTCUT COMMANDS

Shortcut Command Descriptions


CREATE CREATE
01 New sit/name Create the site with name
02 New zon Create the zone without name
03 New equ/Name Create the equipment with name
04 New cyl hei 2000 dia 1000 Create new Cylinder
05 /name To find the name element
06 Ncyl dia---hei--- Negative cylinder (select solid object)
07 Ndis dia---hei--- Negative dish
DELETE DELETE
08 New sit/name Delete box
09 Delete box Delete the cylinder
10 Delete cyl Delete the elbow
11 Delete elb Delete all negative
12 Delete Equi Delete equipment
13 Delete Equ mem Delete members
14 Delete Zone mem Delete member (equip, pipe)
ATTRIBUTE ORIENTATION
15 Q att Attributes
16 Ren/name Change rename
17 Qdia Check the dia of cylinder
18 Qhei Check the height
19 Dia500 To Change dia
20 Qname Check the name
21 Lock all Lock ce & ce members select equipment or owner
22 Lock ce Lock ce only
23 Unlock ce Unlock ce
24 Unlock all Unlock all object
25 Q dia Check dia
26 Q hei Check height
27 Q ang To check the angle for torus
26 Q dia To check diameter
27 Dia 5000 Change Dia 5000
28 Incl/name Name object include current Equipment
29 Inclid@ Pick element go to current Eauioment
a

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 051
POSITION
Shortcut Command Descriptions
POSITION
30 Q Pos To check the pos of origin
31 Q p1pos To check the P1 position (Nozzle)
32 Q pos wrt sit Value from site origin
33 Q pos wrt worl Move to down 100mm
34 By e100 Move to east 1OOmn
35 By n100 Move to north
36 By u100 Move to up 1OOmm
37 At u 1000 Move from world origin
38 Move s dist 1200 Object move to south
39 Pose 5000 Current object position taken from origin
40 At idp@ (Primitives, equipment) Origin of ce move to selected p-point
41 Atid@ Origin of ce move to origin of identify object
42 Move u to idp@ Move up to a selected element Point
43 Move utoid@ Move up to a selected element origin
44 Move w to idpl@ Move best to a selected pline
45 Moves dist 5000 Object will move south dir
46 Qe Check the ce East co-ordinate
47 Move s dist 1245 Obiect will move south dir
48 Move utoid@ Move up to a selected element
49 Move w to idpl@ Move west to a selected pline
50 At u 1000 Move from world oriain
51 At idp@ Move ce to selected Pine
ROTATE
52 Rot by45 Rotate 45
53 Rotate by 60 about East Rotate based east direction
54 Rot thro idp@ by90 Rotate object base pick point
55 Rot thro p3 Abo by 40 Rotate object based p3 point
56 New box copy prev Box by w1250 Create previous box orgin from west direction
57 New cyl copy prev cyl by e5000 Create orevious cvl orain from west direction
ORIENTATION
58 Qori To check the origin orientation
59 Q p1ori Check the P1 orientation
60 Ori E is U E axis will chanae uc direction
a
61 Connidp@toidp@ Connect Primitive

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin
tower
Page No: 052
GENERAL SETTINGS & UTILITIES

Shortcut Command Descriptions


SETTINGS
62 Q repre Gives setting All
63 Repre d arc 10 Set arc tolerance
64 Repre d arc def Set arc tolerance default
65 Repre ppoint on P-Pointon
66 Repre holes on Holes drawn on (create new object)
67 Repre Holes off Holes drawn off
68 Col ce blue Change ce colour
69 Col act orange Change active colour
70 Col aids green Change aids colour
71 Qcol ce To check the color ce
72 Q col act To check the color act
QUERY
73 Quser To check the user
74 Qmdb To check the database
75 Qmem To check the database
76 Qnam Give the name ce
77 Qobs Give the ce obstructin level
78 QOWN Give the own name
79 QMCOUNT Give the member count
80 Q mcount Nozz Give the nozzle count
GENERAL
81 Finish Save & Exit
82 Draft Go to draft module
83 Iso Draft Go to isodraft module
84 Design Go to desi!ln from other module
85 Add ce Select any object in design explorer
86 Rem ce Remove from draw list (ce only)
87 Rem all Rem from draw list (all)
88 Mark ce Marks ce name you will see in Graphical view
89 Unmark ce Unmark ce name
90 Unmark all Unmark all
91 Axes at ce Display axes at ce
92 Axes off Axes remove from display
a
93 Same Navigate between tow items

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin
tower
Page No: 053
Exam Sector - I
Online Theory Exam (Equipment)

Online Practical Exam (Equipment)

Mr/Mrs Was
Success full Completed on Volume I (First Sector Exam). He is Eligible to

Piping

Structure

Electrical

Draft / ISO Draft / Report

Date : Examiner Signature :

Time: Examiner Name :

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 054
VOLUME-II

SL.No Title SL.No Title


262 Position Through Cursor Pick
CREATE 263 Spool
241 Zone 264 Distance
242 Pipe , Specification 265 Position Through Previous
243 Branch, Specification Element
244 Head/Tail Settings 266 Position Through Current
245 Connect/Explicit Element
267 Position Through Branch Tail
COMPONENTS 268 Position through next
246 Insulation component
247 Tracing 269 Connect to previous
248 Create Mode component
249 > Create Component In the 270 Copy current component
Flow Direction 271 Change to backwards mode
250 > Create Component Against 272 Change to forwards mode
the Flow Direction
251 Create Component
252 > Create Component
253 > Create Component At
picked
254 Position
255 Reselect
256 Auto Create
257 Orientation
258 Flip
259 Direction
260 Rotate
261 Position Through Branch
Head

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 055
VOLUME-II
Pipe VOLUME-II

Branch

Name :
If the pipe name 201 Branch name will be 201-B1

Wrt:
Wrt pipe 201

Specifications :
All piping specifications available in the Catalogue databases
are shown in the Piping list. For example:
A150 =ANSI class 150 Rating carbon steel, A300 =ANSI class 300
Rating carbon steel,
F1C =ANSIclass 150 Ratiing stainless steel,and so on.Pick the one
which is to be used as the default for subsequent design selections.

Insulation :
If the piping catalogue has been set up to allow you to add insulation
and trace heating to pipes,you can use the Insulation and Tracing buttons
to select the required specification for each, and set the adjacent toggle
button to On if insulation I tracing is to be added by default as the
model is created

Head/Tail Setting :
Connect / Explicit / None

Connect :
You will connect the head / tail to existing piping components or
equipment nozzles, deriving the position and orientation automatically
when you click OK you will see a connect branch form

Explicit :
When setting the Branch Head or Tail explicitly you need to
specify each of the previously described Branch attributes.

Bore: Nominal Bore size of the pipe.The pull-down


list contains all sizes available in the specification.
Connection : Short code eg: FBB,FBD defining the
Head connection type
Position: Position in world co-ordinates
Direction: The Head Direction is the direction of the flow and the Tail Direction is opposite to the flow.
None :
a Branch will create in Design Exlorer After Modify using Connect or Explicit

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 057
VOLUME-II

PIPE-EX-001
VOLUME-II

PIPE-EX-002
VOLUME-II

SL.No Title SL.No Title


CREATE BRANCH 299 Enter leg lenght
273 Explicit 300 Distance from origin
301 Extend through feature
MODIFY 302 Offset from feature
274 Pipe 303 No slope
275 Component 304 Slope angle
276 Explicit 305 Orient to point
277 Reselect 306 Align with direction
278 Slope Component 307 Explicit direction
279 Spec / Bore 308 Component choice
280 > Pipe 309 > Use elbows
281 > Branch 310 > Use bends
282 Tee ( Leave & Arrive ) 311 > Set default bend radius
283 > Flow Through Tee 312 Distance feed back
284 > Leave By Connection 313 > Offset
285 > Arrive By Connection 314 > Leg lenght
286 Slope Pipe 315 > From origin
287 Hierarchy > Reverese Order 316 Show rotation handle

DELETE TOOLS
288 Delete selection 317 Controls
289 Delete range 318 Increments
319 > Linear increment
MODEL EDITOR 320 > Line linear increment
290 Enter value 321 > Angular increment
291 Align with feature 322 Feature highlight
292 Offset from feature 323 Pick through translucent
293 Snap point 324 Drag image
294 Move handle 325 > Solid
295 > Enter value 326 > Translucent
296 > Align with feature 327 > Wireline
297 > Snap to point
298 Enter offset

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 061
Select Route
VOLUME-II

ch

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 063
VOLUME-II

PIPE-EX-003
VOLUME-II

PIPE-EX-004

Page No: 065


VOLUME-II

100 X 80

100 X 80
5830mm

100-A3B-P1-3

3250 3150

a
Duration: 20 Min
Lab Incharge Sign:
PIPE-EX-005
R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 066
VOLUME-II
4210

100 X 150

100 X 150

150 X 100

5514

a
Duration: 20 Min
Lab Incharge Sign:
PIPE-EX-006
R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 067
VOLUME-II
1700 2850 3150 6000

4000

500
HEX-1

COOLING PUMP-1
TOWER TANK-1 TANK-2

PLAN

COOLING
TOWER

EL:+8.050 M

100-A300-P1-4

80-A3B-P1-3 EL:+5.000M
EL:+4.400M
HEX-1

80-A3B-P1-2

100 X150

150-A300-P1-1 EL:+0.00M

a ELEVATION Duration: 20 Min


Lab Incharge Sign:
PIPE-EX-007
R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 068
VOLUME-II

PIPE-EX-008
VOLUME-II

PIPE-EX-009
VOLUME-II

SL.No Title SL.No Title


CONNECT > BRANCH 350 Connect to previous component
328 Picked Item To Connect MANAGE
Head To 351 Standard model
329 Picked Item To Connect
Tail To TOOLS
330 Connect head to first member 352 Data consistancy
331 Connect tail to last member 353 Pipe router
332 Create components in the 354 Pipe spliting
Selected branch 355 Pipe system
333 Set working branch 356 > Highlight system
334 Auto route branch 357 > Clear highlight
335 Disconnect head 358 > Clear all
336 Pick head position along ISO METRICS
centre line 359 Pipe iso metric
337 Create head component 360 System iso metric

COMPONENT
338 Slope component

ORIENATE
339 Direction towards next
340 Direction towards pick
341 Direction towards head
342 Direction towards tail
343 Orientate current component
344 Swap arrive and leave points
(Flip)
345 Align selection component
346 Direct selection component
347 Change through flow
component
348 Auto complete
349 Copy current component

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 071
Tools
VOLUME-II
VOLUME-II
Modify Pipe
DATA CONSISTENCY ERRORS :-
VOLUME-II
A 10 HEAD REFERENCE NOT SET
The head reference should only be unset

A 20 HEAD REFERENCE POINTS TO NONEXISTENT ELEMENT


This error would result from the deletion of a component, such as a Nozzle, to which the Head of the
Branch was originally connected.

A 30 BAD HEAD RETURN REFERENCE


The Head is connected to an element that does not refer back to the branch. This can occur when the
head of a branch is connected to another Branch, implying that a Tee should be placed somewhere along
the second Branch. The error can also occur when two or more branches are inadvertently connected to the
same terminal.

A200 DIRECTION HDIR NOT SAME AS TERMINAL DIRECTION


If the head is connected to a terminal, such as a Nozzle or Tee, then the direction HDIR should always be
identical to that of the appropriate P- Point of the terminal

A210 POSITION HPOS NOT SAME AS TERMINAL POSITION


If the head is connected to a terminal, such as a Nozzle or Tee, then the position HDIR should always be
identical to that of the appropriate P- Point of the terminal.

A 230 CONNECTION TYPE HCONN NOT SAME AS TERMINAL TYPE


If the head is connected to a terminal, such as a Nozzle or Tee, then the connection type HCONN should
always be identical to that of the appropriate P - Point of the terminal.

A 300 REFERENCE HSTU E UNSET


There is more then 1mm of tube between the Head and the P- arrive of the first component (or the tail),
but HSTUBE is unset

A310 REFERENCE HSTUBE REFERS TO A NONEXISTENT SPCOM


This may occur if part of the specification has been deleted.

A320 HSTUBE PROBLEM,CATREF IN SPCOM IS UNSET


This indicates an error in the specification.

A330 HSTUBE PROBLEM, CATREF IN THE SPCOM REFERS TO MONEXISTENT

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 075
VOLUME-II
CATALOGUE COMPONENT
This may occur if part of the catalogue has been deleted or if the CATREF IS UNSET.

A400 HBORE NOT SAME AS BORE OF HSTUBE


The bore of any tube leading from the Head, determined from the catalogue, should always be
identical to HBORE.

A410 HCON NOT COMPATIBLE WITH CONNECTION TYPE OF HSTUBE


The connection type of any tube leading from the Head, determined from the catalogue, should be
compatible with HCONN

A420 ISPEC REFERENCE POINTS TO NONEXISTENT ELEMENT


This error would occur if, for example, the Insulation specification pointed by ISPEC has been deleted.

Branch Tail Errors


The same type of errors may occur to the Tail of a Branch. The message numbers are the same as for
the head errors but are proceeds by a B. For example:-

B10 TAIL REFERENCE NOT SET


The Tail reference should only be unset (i.e. zero) if the Tail connection type TCONN is set.

Plain Branch Errors


The following diagnostics can occur only for Branches with piping components:-

C500 TUBE TOO SHORT BETWEEN HEAD AND TAIL


The distance between the head position, HPOS, and the tail position, TPOS, is greater then zero and less
than the specified minimum tube length (default: 100mm). C510 Either the Head position, HPOS, does not
lie at a positive distance along the line through TPOS in the direction TDIR or the Tail Position, TPOS, does
not lie at a positive distance along the line through HPOS in the direction HDIR.

C520 HBORE NOT SAME AS TBORE


When there are no components on the branch, the Head bore, HBORE, should be identical to the
Tail bore, TBORE.

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 076
VOLUME-II
C530 HCONN IS NOT COMPATIBLE WITH TCONN
This implies that the Head is connected directly to the Tailwith no tube or piping with the Tail connection
type, TCONN.

C540 THIS BRANCH HAS NO COMPONENTS


This does not necessarily indicate an error. It is output as a warning. Component - Specific Diagnostics
The following errors apply to individual piping components and, in some cases, to their adjacent
connections. Some of the errors also apply to nozzles. All - Component Diagnostics These are applicable
to any component, regardless of its position in the network.

D100 REFERENCE SPREF UNSET


This probably means that you have forgotten to choose the piping component correctly

D300 CONN REFERENCE NOT SET


Multi-way components may be left unconnected only if the connection type of the relevant p.

D310 CONN REFERENCE POINTS TO NON-EXISTENT BRANCH


This may occur if the Branch which is pointed to by the CONN reference has been deleted.

D320 BAD CONN RETURN REFERENCE


This may occur if the Branch which is pointed to by the CONN reference has been reconnected
to another terminal. D400 The distance between the arrive p-point of this component and the leave
p-point of the previous component (or Head} is greater than zero and less than the specified minimum
tube length (default: 100mm}.

D400
The distance between the arrive p-point of this component and the leave p-point of the previous component
(or Head} is greater than zero and less than the specified minimum tube length (default: 100mm}.

D410
The position and direction of the arrive p-point of this component are not correct with respect to the leave
p-point of the previous component (or Head).The error could be caused by incorrect positioning of this
component, the previous component (head) or both
a

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 077
VOLUME-II
D420
The bore of the arrive p-point of this component is not equal to the bore of the preceding tube or,
if this component is not preceded by tube, to the bore of the leave p-point of the previous component
(or HBORE).

D430
The connection type of the arrive p-point of this component is not compatible with the preceding tube or,
if this component is not preceded by tube, to the connection type of the leave p-point of the previous
component (or HCONN). 0500 REFERENCE LSTUBE UNSET You have probably forgotten to select
the piping component.

D500
The bore of the leave p-point of this component is not the same as the bore of the tube following the
component.

D600
The bore of the leave p-point of this component is not the same as the bore of the tube following
the component

D610
The connection type of the leave p-point of this component is not compatible with the tube following
the component.

End-Component Diagnostics
These are applicable only to the last component in a Branch.

E700
The distance between the leave p-point of the current component and the tail position, TPOS, is greater
than zero and less than the specified minimum tube length.

E710
The position and direction of the p-point of this component are not correct with respect to the position
TPOS, and direction, TDIR, of the tail. The error could be caused by incorrect positioning of this component,
the tail, or both.

E720
The bore of The leave p-point of this component is not the same as the tail bore

E730
The connection type of the leave p-point of this component is not compatible with the Tail connection
type TCONN.

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 078
VOLUME-II

Duration: 20 Min
Lab Incharge Sign:
PIPE-EX-010
VOLUME-II

a
Duration: 30 Min
Lab Incharge Sign:
PIPE-EX-011
R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 080
VOLUME-II

PIPE-EX-012
VOLUME-II

SL.No Title SL.No Title


374 > Element
Position 375 > Position
361 Explicit 376 > Next
362 Position by 377 > Tail
363 Move 378 > Previous
364 Distance > target 379 > Head
365 Relative to 380 > Current
366 > No target 381 Through
367 > In front 382 Clearance
368 > Behind 383 Towards
369 > On top 384 Drag move
370 > Under 385 > Distance
371 > From 386 > Through
372 > Towards 387 > Clearance
373 Select 388 > Towards

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 082
VOLUME-II

PIPE-EX-015
VOLUME-II

PIPE-EX-016
VOLUME-II

PIPE-EX-017
VOLUME-II

a
n
ign:
PIPE-EX-019
R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin
tower
Page No: 089
VOLUME-II

PIPE-EX-020
VOLUME-II

:
PIPE-EX-021
VOLUME-II

PIPE-EX-022
VOLUME-II

PIPE-EX-023
PIPING
Shortcut Command Descriptions
CREATE PIPE WORK
95 For All object created forward mode
96 Bac All object created backward mode
97 Qmode Check the mode (forward or backward)
98 New pipe/name pspec/a Pipe create with specification and name
99 New bran/name Branch create with name and same pipe specification
100 New gas sel Create new gasket
101 New fla sel Create new flange
102 New elb sel Create new elbow
103 New tee sel Create new tee
104 New valve sel Create new gate valve
105 Dir u Elbow change u direction
106 Dist 500 Elbow moved 500

QUERY PIPING
107 Q p1bore Check the bore size (Nozzle, elbow...etc)
108 Q p2bore Check the reducer bore
109 Q p3bore Tee branch bore
110 Q lspec To check the Insulation
111 Q mtxx Checking For Pipe Meterial
112 Q bran Checking For Branch Name

113 Q ABop Check arrive bottom of pipe


114 Q Lbop Check Leave bottom of pipe

115 Q ATop Check arrive Top of Pipe


116 Q LTop Check Leave Top of Pipe

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin
tower
Page No: 094
PIPING BRANCHES

Shortcut Command Descriptions


PIPING BRANCH SETTINGS
117 Q name To check the branch name
118 Q spref To check the spec nozzle or piping components
119 Q pspec To check the branch or pipe specification
120 Q hbore - Head bore To check the branch head bore
121 Q tbore - Tail bore To check the branch tail bore
122 Q href - Head reference To check the branch head reference
123 Q tref - Tail reference To check the branch tail reference
124 Q hconn - Head connection To check the branch head connection
125 Q tconn - Tail connection To check the branch tailconnection
126 Q clle - Center line Length To check the branch center line length
127 Q tule - Tube length To check the branch tube length
128 Q hpos - Head position To check the branch head position
129 Q tpos - Tail position To check the branch tail Position
130 Q hdir - Head reference To check the branch head reference
131 Q tdir - Tail Reference To check the branch tail reference

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin
tower
Page No: 095
Exam Sector - II
Online Theory Exam (Pipework)

Online Practical Exam (Pipework)

Mr/Mrs Was
Success full Completed on Volume II (Second Sector Exam). He is Eligible to

Piping

Structure

Electrical

Draft / ISO Draft / Report

Date : Examiner Signature :

Time: Examiner Name :

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 096
VOLUME-III

SL.No Title SL.No Title


CREATE
389 Setting To Start 404 Define start/end explicit
390 Set Default Pro Specification 405 Curved
391 Primary Node 406 > Free definition
392 Profile 407 > Fixed angle
393 Set Section Storage Area 408 Arc
394 Zone >Structure >Framework 409 > Centre + sweep
395 Sub-Framework 410 > Ends + radius
396 Set storage Area 411 > Three points
397 Set profile Default Spec 412 > Semi circle
413 Ring
DESIGN AIDS 414 > Centre +
398 Rectangular grid 415 > Three points
399 Grid origin 416 > Two point

CREATE SECTION
400 Straight
401 Single
402 Continuous
403 Repeat

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 097
Page No: 098
Page No: 099
VOLUME-III

STURC-EX-01
VOLUME-III

STURC-EX-02
VOLUME-III

STURC-EX-03
VOLUME-III

STURC-EX-04
VOLUME-III

STURC-EX-05
VOLUME-III

SL.No Title SL.No Title


417 Tower
418 Storage Areas 424 Bracing
419 Elevations 425 Base Plate Creation
420 Upper S.O.P 426 Joints
421 Lower S.O.P 427 Joint Pline
422 3Leg Tower Using Grid 428 Foundation
423 Electric Tower & Bracing 429 Copy > Offset

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 105
VOLUME-III

STURC-EX-06
VOLUME-III

STURC-EX-07
VOLUME-III

STURC-EX-08
VOLUME-III
BRAZING DETAILS OF Electrical Tower

Duration: 5 Min
Lab Incharge Sign:
STURC-EX-09
VOLUME-III

SL.No Title SL.No Title


MODIFY 453 Explicit
430 Section 454 Position by
431 Properties 455 Extend
432 Specification 456 > First plane
433 Parameters 457 > Second plane
434 Position 458 > Third plane
435 > Start 459 Beta angle
436 > End 460 Extension by distance
437 Justification 461 Secondary node
438 Member line
439 Merge
440 Split
441 Splice
442 Fillet
443 Mitre Ends
444 Cut Plane
445 Joints
446 Specification

CREATE& MODIFY
447 P-Node at SCTN End
448 Fittings
449 Parameters
450 Positional
451 Bracing gap
452 Material

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No:110
VOLUME-III

Tools

Add to List:

Define Split On:

Connections at Split:
None

Nodes

Trimmed
VOLUME-III
Tools

Tools

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 113
VOLUME-III
Tools

Toos > By...................

. ......

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 114
VOLUME-III
PLINES KEY

BBH Bottom Bolt Hole NALO NeutralAxis Left Outside

BBHL Bottom Bolt Hole, Left NAR NeutralAxis Right


BBHR Bottom Bolt Hole, Right NARO NeutralAxis Right Outside
BLW Bottom Left of Web NAT Neutral Angle Top
BLWT Bottom Left Web Top RBOA Right Bottom of Angle
BOC Bottom of Channel RBOC Right Bottom of Channel
BOS Bottom of Steel RBOS Right Bottom of Steel
BRW Bottom Right of Web RBTS Right Bottom Top of Steel
BRWT Bottom Right Web,Top ROA Right of Angle
FOC Face of Channel ROC Right Outside of Channel

HBA Hole, Bottom of Angle RTBS Right Top Bottom of Steel


HOA Hole, Outside of Angle RTOC Right Top of Channel
IOC Inside of Channel RTOS Right Top of Steel
LBOA Left Bottom of Angle TBH Top Bolt Hole

LBOC Left Bottom of Channel TBHL Top Bolt Hole,Left


LBOS Left Bottom of Steel TBHR Top Bolt Hole,Right
LBTS Left Bottom Top of Steel TLW Top Left of Web
LTBA Left Top Bottom of Angle TLWB Top Left Web,Bottom
LTBS Left Top Bottom of Steel TOAX Top of Angle,X orientation
LTOC Left Top of Channel TOAY Top of Angle,Y orientation
LTOS Left Top of Steel TOC Top of Channel
LTTA Left Top of Angle TRWB Top Right Web,Bottom
NA NeutralAxis TOS Top of Steel
NAB NeutralAxis Bottom TRW Top Right of Web
NAL NeutralAxis Left

Q PLNA-To Check the Pline Name in Command Line

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 116
VOLUME-III

STURC-EX-10
VOLUME-III

SL.No Title SL.No Title


CONNECT UTILITIES
462 Automatic 478 Data Checker
463 Connect 479 Mark > mark
464 Disconnect 480 > Remove mark
465 Force trim to 481 > Remove all marks
466 Check end connections TOOLS> MASS PROPERTIES
467 End datum 482 Weight and centre of gravity
468 Joint dominate 483 Surface area
469 Joint subordinate 484 Volume
ORIENTATE PENATRATE
470 Orientate 485 Profile
471 Rotate 486 Holes
472 Flip 487 > Hole manager
SETTINGS 488 > Modify hole
473 Tolerance 489 > Create hole
474 Check connection colours 490 > Hole report
475 > Both ends connected
476 > Neither end connected
477 > One end connected

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 118
CONNECT VOLUME-III
Connect > DisConnect
If SCTN Already Connected , You can Disconnect the SCTN

Connect > Connect


SCTN elements may also be connected explicitly by using the Connect
menu. Selecting Connect>Connect from the main menu prompts the user
to choose the section to attach to and the section end(s) to be attached.
The selection process is terminated by pressing the Esc key.

Connect > Trim to Pline

Trims the section to a Pline selected by the system in accordance with current Pline rule, i.e. the POSL
attribute of the SJOI element is modified.

Connect>Trim to Section

Trims the section according to the current POSL setting of the PJOI element. This may result in the attached
member not being correctly connected, e.g. if the Beta Angle of the Owning SCTN has changed.

subordinate:

If the joint is subordinate, i.e. the attached section is dominant and Jfree is set to false, the attached sections
will extend or trim, maintaining their original orientation, t6'the Pllne that they were trimmed to on creation.

Joint Dominat :

If the joint is dominant, i.e. the attached section is subordinate


and Jfree is set to true, the attached sections will realign to
the new joint position.

NormalJoint

The column is the owning section with two beam sections


attached.

Subordinate Joint

Joint is Subordinate. Column moved, beams extended to original


Plines but maintain original orientation.

Dominant

Joint is Dominant. Column moved, beams extended and


realigned to new joint position and cut planes are automatically
re-aligned.

The standard default is for joints to be subordinate. This default can be changed by selecting
Settings>Tolerances.....
VOLUME-III
Common Axis

Axis

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 120
VOLUME-III

STURC-EX-11
VOLUME-III

STURC-EX-12
VOLUME-III

SL.No Title SL.No Title


CREATE MODIFY
491 Framework > Sub-Frame 523 Fitting
492 Panel 524 Split
493 Panel specification 525 Merge
494 Create methods 526 Offset
495 Panels 527 Panel origin
496 > Rectangle ( 2 points ) 528 Drawing edges
497 > Multiple points 529 Drawing edge defaults
498 Arc 530 Representation
499 > Centre + sweep 531 Specification
500 > Three point 532 Jusitification
501 > Two point 533 Thickness
502 Ring 534 Material
503 > Centre + 535 Nagative extrution
504 > Three point
505 > Two point POSITION
506 Disc 536 Explicit
507 > Centre + 537 Position (by)
508 > Three point
509 > Two point
510 Explicit defined
511 Create nagative extrusion
512 Nagative
513 > Rectangle ( 2 points )
514 > Multiple points
515 > Disc centre +
516 > Disc three point
517 . > Disc two point
518 Fitting
519 Specification
520 Justification
521 Thickness
522 Material

Faculty Signature Date

Faculty Name Time

a
Duration: 30 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 124
VOLUME-III
VOLUME-III

STURC-EX-14
VOLUME-III

STURC-EX-15
VOLUME-III

a
Duration: 90 Min
Lab Incharge Sign:
STURC-EX-16
R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 128
VOLUME-III
SL.No Title SL.No Title
CREATE 578 Split
538 Structure >Framework 579 Splice
539 Set wall Specification
580 Merge
540 Set Floor Specification
581 Mitre ends
541 Walls > straight wall
542 > String method 582 Wall ends
543 > Single 583 > Extend through
544 > Continuous 584 > Extend by
545 > Radial 585 > Trim end
546 Curved wall 586 > Trim connected
547 User defind
587 Split floor
548 Compound wall
588 Screed slope
549 Create floor
550 > Floor POSITION
551 > Screed 589 Explicit
552 > Nagative extrusion 590 Position (by)
553 > Compound floor CONNECTIONS
554 > Compound screed
591 Connect walls
555 Fittings
592 > Connect walls
556 > Wall fitting
557 > Compound wall fitting 593 > Connect wall to wall
558 > Wall sub-fitting 594 > Align wall connection
559 > Floor fitting 595 Disconnect walls
560 > Compound floor fitting 596 Tidy
561 > Floor sub-fitting 597 > Joints
MODIFY 598 > Nodes
562 Wall
599 Ouery > highlight connections
563 > Definition
564 > Specification 600 > Both ends connected
565 > Position origin 601 > Neither end connected
566 > Justification 602 > One end unconnected
567 > Flip TOOLS
568 Floor 603 Building levels
569 > Definition 604 Matireal
570 > Justification 605 Trace
571 > Thickness defaults
572 > Nagative extrusion
606 Floor representation
573 > Position origin 607 Floor tolerances
574 > Specification 608 Wall tolerances
575 Fitting 609 Wall cut plane
576 > Wall fitting 610 Drawing edge defaults
577 > Floor fitting 611 Drawing edges
Faculty Signature Date
Faculty Name Time
a Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 129
VOLUME-III

STURC-EX-17
VOLUME-III

STURC-EX-18
VOLUME-III

SL.No Title SL.No Title


CREATE 627 > Panels
612 Stucture 628 Split handrail
613 Frame Work 629 Merge handrails
614 Sub Frame Work 630 Split rails
615 Stair Flight 631 Materials
616 Handrail
617 Rung Ladder
MODIFY
618 Stair Flight
619 Handrail
620 Rung Ladder

TOOLS
621 Components
622 > Gates
623 > Posts
624 > Terminations
625 > Rails
626 > Kickplate

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 132
VOLUME-III

Panel

STURC-EX-19
VOLUME-III

Panel

STURC-EX-20
VOLUME-III

Panel

a
Duration: 50 Min
Lab Incharge Sign:
STURC-EX-21
R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin
tower
Page No: 135
VOLUME-III

STURC-EX-22
VOLUME-III

Shortcut Command Descriptions


132 Q Cutlen Check the cut length (SCTN)
133 Q Dms Check the start direction (SCTN)
134 Q ome Check the end direction (SCTN)
135 Q Spref Check the profile (SCTN)
136 Q catref Check the cat log (SCTN)
137 Q Poss Check the position start (SCTN)
138 Q Pose Check the position end (SCTN)
139 Q Bang Check the Beta Angle
140 Q Jus Check the Justification
141 Q Derlen Check the Definition Length
142 Q Matref To check the material
143 Q Nwei To check the Gross weight
144 Q Gwei To check the Gross weight

1 45 Q mass To check the mass properties


1 46 Q jus To check the justification
147 Q poss To check the Start Position
148 Q pose To check the End Position
149 JusNA To change Justification for NA
150 NewSCTN To create New SCTN

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin
tower
Page No: 137
VOLUME-III

STURC-EX-23
VOLUME-III

STURC-EX-24
VOLUME-III

STURC-EX-25
VOLUME-III

STURC-EX-26
VOLUME-III

STURC-EX-27
VOLUME-III

STURC-EX-28
Exam Sector - III
Online Theory Exam (Structural)

Online Practical Exam (Structural)

Mr/Mrs Was
Success full Completed on Volume III (Third Sector Exam). He is Eligible to

Piping

Structure

Electrical

Draft / ISO Draft / Report

Date : Examiner Signature :

Time: Examiner Name :

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 144
VOLUME-IV

SL.No Title SL.No Title


CREATE CONNECT
632 Cable Tray 645 Branch
633 Branch 646 Next
634 Components 647 Previous
648 Connection Ref
MODIFY
635 Branch SETTINGS
636 Specification 649 Defaults

DELETE UTILITIES
637 Delete range 650 Data Consistency
651 Data Checker
TOOLS 652 Report
638 Options
639 Fill With Straight
640 Remove Straight
641 Move
642 Change Exit
643 Route Component
644 Swap Branch

Faculty Signature Date

Faculty Name Time

a
Duration: 30 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 145
VOLUME-IV

a
n: 20 Min
Lab Incharge Sign:
ELECT-EX-01
R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin
tower
Page No: 146
VOLUME-IV

a
20 Min
Lab Incharge Sign:
ELECT-EX-02
R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin
tower
Page No: 147
VOLUME-IV

SL.No Title SL.No Title


CREATE TOOLS
653 Cableway 677 Branch
654 > Cableway 678 > Branch Task
655 > Cableway Volume 679 > Split
656 Branch 680 > Merge
657 Route 681 > Reverse
658 > Node 682 Copy
659 > Attachment 683 > Copy Cableway
660 > Point 684 > Copy Cables
661 > Control Node 685 Move Segment
662 Material 686 Mark Nodes
663 > Material 687 Cable Data
664 > Material Element 688 List Cables
665 Cable 689 Fill Level Check

MODIFY CONNECT
666 Cableway 690 Check
667 Branch 691 Connect Branch
668 Route 692 Disconnect
669 > Node 693 > Disconnect Branches
670 > Attachment 694 > Disconnect Equipment
671 > Point
672 > Control Node SETTINGS
673 Material 695 Defaults
674 > Material
675 > Material Element
676 Cable

Faculty Signature Date

Faculty Name Time

a
Duration: 30 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 150
VOLUME-V

SL.No Title SL.No Title


CREATE 718 Merge
696 HVAC 719 Drag
697 Categories
698 Available Types QUERY
699 Orientation 720 HVAC
700 Leave Direction SETTINGS
701 Leave ‘A’Axis 721 Weight & centre of gravity
702 Position 722 Surface area & weight
703 At 723 Ductwork spec
704 Through POSITION
705 Move By 724 Move
706 Distance 725 Explicit
707 Copy ID 726 Position (by)
708 Modify CE
709 Connect DELETE
710 Main Branches 727 Current element
711 Options 728 Delete range

MODIFY
712 HVAC

TOOLS
713 > Show Gap
714 Fill with straights
715 Spool manager
716 Item numbering
717 Split

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 151
VOLUME-V

a
Duration: 45 Min
Lab Incharge Sign:
KDS-EX-02
R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin
tower
Page No: 153
VOLUME-VI

SL.No Title SL.No Title


CREATE HANGERS
729 Preliminary 757 Change hanger rode size
730 Ancillary 758 Select spring for hanger
731 Frame Work 759 Set equal rod lenghts for hangers
732 Trunnion 760 Adjust to steel work
733 Hanger COMMON
734 Special Support 761 Switch to 3d view
735 > multi discipline support 762 Support additional pipe
736 > HVAC support 763 Posotion through
737 > Racking support 764 Rotate component
738 > From existing supports 765 Set steel work template
766 Rotate
MODIFY 767 Create weld
739 Support 768 Create packer
740 Convert to support 769 Modify datum component
ANCILLARY 770 Modify connection force
741 Set hieght to steel/base plate connection to pline
742 Set parameters to default 771 Cross bar associations
743 Add associated ancillary 772 Rotate all component
744 Adjust to steel work 773 Flip component
745 Dis ta n c e c lic k to u s e c le a ra n c e 774 Mirror
746 Distance from support 775 Nudge support component
747 Reselect ancillary type 776 View associations
FRAME WORK 777 View direction
748 Build by cursor 778 Delete component
749 Build by clearance 779 Delete packers
750 Create bracing 780 Copy component
751 Create cross bar 781 Copy like
TUNNION 782 Reconnect hanger
752 Set trunnion height by pick 783 Flip field component
753 Set trunnion material 784 Change to
754 Steel head component 785 Modify spring travel
755 Create base component 786 HVAC or cabletrey
756 Component-click to support
pipe

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 154
VOLUME-VI

SL.No Title SL.No Title


DELETE 809 > Support date
787 Delete support 810 > Trimmer
TOOLS 811 > View standard
788 Copy support DISPLAY
789 Align support 812 Dimensions
790 Pad 813 Rets
791 > Create pad 814 Pipe Dimensions
792 > Remove pad
793 > Modify pad ISOMETRICS
794 Lock/unlock 815 Pipe
795 > Lock 816 Pipe
796 > Unlock 817 System
797 Drawlist STETTING
798 Support wizard 818 Storage
799 Health check 819 Auto Name
800 Additional tools 820 Defaults
801 > Drawing > ADP location 821 > Defaults Settings
802 > Comment 822 > reload
803 > Isometric settings
804 > Notes
805 > Material
806 > Reference bed/anchor plate
807 > Snipe
808 > Spooling

Faculty Signature Date

Faculty Name Time

a
Duration: 90 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 155
Exam Sector - IV, V, VI
Online Theory Exam (Electrical, HVAC, Hangers & Supports)

Online Practical Exam (Electrical, HVAC, Hangers & Supports)

Mr/Mrs Was
Success full Completed on Volume IV (Fourth Sector Exam). He is Eligible to

Piping

Structure

Electrical

Draft / ISO Draft / Report

Date : Examiner Signature :

Time: Examiner Name :

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 156
REPORTS VOLUME-VII

SL.No Title SL.No Title


REPORTS
823 Run Report
824 Design Report
825 Simple Report
826 Surface treatment

Faculty Signature Date

Faculty Name Time

a
Duration: 30 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 157
VOLUME-VIII

SL.No Title SL.No Title


LOGIN SPOOLER LOGIN ISODRAFT
827 Fabrication & Design Explorer 839 Members
828 Spool Drawing Hierarchy 840 Message list
829 Creat 841 Basic Isomatric
830 > Department 842 Advance Isometric
831 > Registry 843 Transfer to AutoCad
832 > Spool Drawing
833 > Weld
834 Spool Break
835 Add Spool Drawing
836 Remove Spool Drawing
837 Include Field Component
838 Spool Update

Faculty Signature Date

Faculty Name Time

a
Duration: 30 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 158
VOLUME-IX

SL.No Title SL.No Title


Task 878 Scale
844 Draft Hierarchy 879 Nearest
845 Department 880 Auto Scale
846 Registry 881 Intelligence Text
847 Drawing 882 Positional Code
848 Sheet 883 Pre-Define
849 View 884 Modify Frame
850 User Defined 885 Modify View
851 General 886 Frame On / Off
852 Title 887 Frame Size Cursor
853 View Type 888 Frame Size Explicit...
854 Section Mode 889 Copy Width
855 Style 890 Copy Height
856 Hatching Rules 891 Copy Width and Height
857 Change Rules 892 Position By
858 Direction 893 Centre
859 Attributes 894 Top Left
860 Graphics Angle 895 Top Right
861 View Orientation 896 Bottom Left
862 Arc Tolerance 897 Bottom Right
863 Perspective 898 Explicit
864 Gapping 899 Align Center Vertical
865 Note Line Colour 900 Align Center Horizontal
866 Note Line Style 901 Top
867 No Update 902 Bottom
868 Update Design 903 Left
869 Scale 904 Right
870 Intelligence Text 905 View On / Off
871 Limit Define 906 Center Identify
872 General 907 Cursor
873 Limits 908 BY Cursor
874 Design 909 Explicit
875 Projection 910 Offset
876 Region 911 Graphics Drawing
877 Basic 912 Drawing Reference

Faculty Signature Date

Faculty Name Time

a
Duration: 30 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 161
VOLUME-IX

SL.No Title SL.No Title


2D DRAFT 932 Rotate
913 Distance 933 Mirror
914 Angle 934 Scale
915 Cumulative Length 935 Array
916 ID Point 936 Stretch
917 Line 937 Explode
918 Cloud 938 Lengthen
919 Circle center Radius 939 Trim
920 Rectangular 940 Fillet
921 Arc Angle
922 Triangle TOOLS
923 Hexagon End Point 941 Delete
924 Ellipse Axise Edge 942 Paste
925 Tangent 943 Copy
926 Ray Line 944 Cut
927 X Line 945 Redo
928 Move 946 Undo
929 Copy 947 Pan Real Time
930 Offset 948 Zoom Extents
931 Delete

Faculty Signature Date

Faculty Name Time

a
Duration: 30 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 162
VOLUME-IX

SL.No Title SL.No Title


CREATE DIMENSION
949 Text
950 Symbol
951 Image
952 Table
953 Overlay
954 Market
955 Lable
956 Auto Tag
957 Gap
958 Across PCD
959 Across Diameter
960 Chained
961 Orthogonal Chained
962 Blanking Margin
963 > Enable Blanking
964 > Disable Blanking
965 Active Visual Style

Faculty Signature Date

Faculty Name Time

a
Duration: 30 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 163
VOLUME-IX

SL.No Title SL.No Title


SECTION VIEW SECTION VIEW
966 Detail 988 General
967 Section 989 Pipe Sketches
968 Active Properties 990 HVAC Sketches
969 Property Grid 991 ISOmetric Drawing
970 Tabbed View 992 General
971 Plot Styles 993 Equipment Centers
972 Rep & Hach Rules 994 ISOmetric Standards
973 Save Work 995 ISO 1
974 Get Work 996 Nudge UP
997 Nudge Down
UPDATE 998 Diamension Log
975 Pitcute 999 ISOmetric Log
976 Backing Sheet 1000 IOSmertic Revision
977 Backing
978 Instance AREA
979 Reps 1001 Create New Drawing
980 Names 1002 Brows Store Log Files
981 Design 1003 Brows Excesting Drawings
982 Annotation 1004 Default
983 All 1005 New Drawing
984 Update 1006 New User View
985 Re-Generate 1007 New Over View
1008 Revision Control
IMPORT 1009 Layer Control
986 Excel 1010 Drawing Lock
987 CAD Drawing 1011 Scale Over Ride
1012 Re-Scale Pipe Symbols

Faculty Signature Date

Faculty Name Time

a
Duration: 30 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 164
VOLUME-IX
X
VOLUME-X

SL.No Title SL.No Title


UTILITIES 1046 > Hidden list
1013 Check > clashes 1047 > Local cordinate system > world
1014 > Clash 1048 > Current
1015 > Clash CE 1049 Element
1016 > Auto Clash 1050 Object
1017 > Clash Manager 1051 Move
1018 Selection > copy 1052 3 Points
1019 > Copy 1053 Set the axis to display from
1020 > Copy with base point Direction
1021 Copy & paste 1054 Clip > create
1022 Paste 1055 > Current selection
VIEW 1056 > Current element
1023 Settings > current view 1057 Clip
1024 Graphics 1058 Modify
1025 Auto colour 1059 Cap
1026 Element rules 1060 Control > limits ce
1027 Rules types 1061 Extents
1028 Representation 1062 Limits explicit
1029 Monochrome 1063 Limits obsruction
1030 Views > copy 1064 Limits clip box
1031 > To a separate view
1032 > To a cloned view TOOLS
1033 > To a local view 1065 Naming > auto name
1034 New 1066 > Ce only
1035 Grid plan 1067 > Ce offspring
1036 Contant > Drawlist MANAGE
1037 Hide 1068 History > db listing
1038 Remove PROJECT
1039 > Remove ce 1069 Options > coordinates
1040 > Remove all 1070 Explores settings
1041 > Remove selection 1071 Units
1042 Add ce
1043 Hide
1044 > Hide selected
1045 > Show last hidden

Faculty Signature Date

Faculty Name Time

a
Duration: 15 Min
Lab Incharge Sign:

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 171
VOLUME-X

Shortcut Command Descriptions


RULES USED IN LIST, DRAFT & REPORT
01 HBORE EQ 100 100 only
02 HBORE NEQ 100 Excluding 100
03 HBORE GE 100 100 & above 100
04 HBORE GT 100 Above 100
05 HBORE LT 100 Below 100
06 HBORE LE 100 100 & Below 100

01 EQ - HBORE,TBORE ,SPREF,PSPEC, P1BORE,HREF,TREF,HDIR,TDIR


02 NEQ - HBORE,TBORE ,SPREF,PSPEC, P1BORE,HREF,TREF,HDIR,TDIR
03 GT - CLLE,TULE,HBORE,TBORE,P1BORE,HCONN,CUTLEN
04 GE - CLLE,TULE,HBORE,TBORE,P1BORE,HCONN,CUTLEN
05 LT - CLLE,TULE,HBORE,TBORE,P1BORE,HCONN,CUTLEN
06 LE - CLLE,TULE,HBORE,TBORE,P1BORE,HCONN,CUTLEN

ALL COMMANDS USED FIRST 3 (OR) 4 LETTERS


ALL COMMANDS USED FIRST 3 (OR) 4 LETTERS

01 Site Sit

02 Zone Zon
03 Equipment Equ
04 Box Box
05 Cylinder Cyl
06 Cone Con
07 Dish Dis
08 Pyramid Pyr
09 Cir-torus Rtor
10 Snout Sno
11 Sloped cylinder Slcyl
12 Gasket Gas
13 Flange Fla

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 172
15350
19350

EQUI-EX-16 A

EQUI-EX-19

EX-06 F EX-06 G EX-06 H

EQUI-EX-05 A EX-05 B EX-05 C EX-05 D EX-05 E

EQUI-EX-16 B 6000

EQUI-EX-20 A EX-20 B EX-20 C EX-20 D EX-20 E EX-20 F EX-20 G EX-20 H EX-20 I EX-20 J

17450

EQUI-EX-08 B

EQUI-EX-06 A EX-06 B EX-06 C EX-06 D EX-06 E

EQUI-EX-08 A

9550 8500

a
Duration:
Lab Incharge Sign:
PR-001A
R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 173
a
PROJECT OUTPUT VOLUME-X

REPORTS

NOZZLE ( NAME, SPREF, P1BOR )

ABOVE 150 SIZE NB NOZZLE ( NAME, SPREF, P1BOR )

PIPE MTO ( Elbow Qty, Value Qty.... )

Tube MTO

Branch MTO FOR 100 NB

Column MTO

Beam MTO

ISO DRAFT

Basic ISOmetric

Advance ISOmetric ( Spool Drawing )

DRAFT

Limit Define View (Split 4 Part)

Detail view of any Part

Plan View of Pipework With Annotation & 100 nb Line highlight color

Plan View With Tagging

Equi Plan View With Annotation & 150 nb Nozzle highlight color

Detailing Of Equipment

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 175
PROJECT COMPLETEDETAIL

Project Starting Date :

Project Ending Date :

Total Time Duration :

Batch Details :

Spl. Fast Track

Fast Track

Morning

After Noon

Evening

Weekend

Project Complete Details :

R
PIPING TRAINING INSTITUTE
No x.41 ,Sivanantha building,
2nd floor,Near to Aavin tower
Page No: 176

You might also like