CPWD - DAR - Vol - I - 14092023-Civil 152-161
CPWD - DAR - Vol - I - 14092023-Civil 152-161
0
MORTARS
143
3.1 Cement mortar 1:1 (1 cement : 1 fine sand)
Code Description Unit Quantity Rate ` Amount `
Details of cost for 10 cum
MATERIAL
(0.7175 cum. of cement = 1.02 tonne) Cement re-
quired for cement mortar is 71.25%
0367 Portland Cement tonne 10.200 5156.00 52591.20
2209 Carriage of Cement tonne 10.200 0.00 0.00
0983 Fine Sand (Zone IV) cum 7.125 980.00 6982.50
2261 Carriage of Fine sand (1 part badarpur sand : 2 parts
jamuna sand) cum 7.125 0.00 0.00
LABOUR
For measuring, carrying, depositing and mixing-
0114 Beldar day 7.500 736.00 5520.00
0101 Bhisti day 0.700 816.00 571.20
9999 Hire and running charges of mechanical mixer L.S. 269.000 2.27 610.63
9999 Sundries L.S. 135.200 2.27 306.90
Cost of 10.00 cum 66582.43
Cost of 1.00 cum 6658.24
Say 6658.25
3.2 Cement mortar 1:2 (1 cement : 2 fine sand).
Code Description Unit Quantity Rate ` Amount `
Details of cost for 1 cum
MATERIAL
(0.475 cum. of cement = 0.68 tonne) Cement re-
quired for cement mortar is 47.50%
0367 Portland Cement tonne 0.68 5156.00 3506.08
2209 Carriage of Cement tonne 0.68 0.00 0.00
0983 Fine sand (zone IV) cum 0.95 980.00 931.00
2261 Carriage of Fine sand (1 part badarpur sand : 2 parts
jamuna sand) cum 0.95 0.00 0.00
LABOUR
For measuring, carrying, depositing and mixing-
0114 Beldar day 0.75 736.00 552.00
0101 Bhisti day 0.07 816.00 57.12
9999 Hire and running charges of mechanical mixer L.S. 26.91 2.27 61.09
9999 Sundries L.S. 13.52 2.27 30.69
Cost of 1.00 cum 5137.98
Say 5138.00