METHOD OF SOIL DESCRIPTION USED ON BOREHOLE AND TEST PIT

REPORTS

FILL CLAY (CL or CH)

GRAVEL (GP or GW) ORGANIC SOILS (OL or OH or Pt)

SAND (SP or SW) COBBLES or BOULDERS

SILT (ML or MH)

Combinations of these basic symbols may be used to indicate mixed materials such as sandy clay.

CLASSIFICATION AND INFERRED STRATIGRAPHY


Soil and rock is classified and described in reports of boreholes and test pits using the preferred method given in
D.2487-10-2011 and ASTM D.2488 09a-2009. The material properties are assessed in the field by visual/tactile methods.

Particle Size Plasticity Properties


ASTM D.2487-10-2011 ASTM D.2487-10-2011
Major Divis ion Sub Division Particle Size
BOULDERS > 300 mm
COBBLERS 75 to 300 mm
Coarse 19 to 75 mm
GRAVEL Medium 4.75 to 75 mm
Fine 2.0 to 4.75 mm
Coarse 0.425 to 2.0 mm
SAND Medium 0.2 to 4.25 mm
Fine 0.075 to 0.2 mm
SILT 0.002 to 0.075 mm
CLAY <0.002 mm

MOISTURE CONDITION ASTM D.2488-09-2009


Symbol Term Description
D Dry Absence of moisture, dusty, dry to the touch
M Moist Damp but no visible water
W Wet Visible free water, usually soil is below water table

CONSISTENCY AND DENSITY


Symbol Term Undrained Shear Symbol Term Density Index %
Strength
VS Very Soft 0 to 12 kPa VL Very Loose Less than 15 0 to 4
S Soft 12 to 25 kPa L Loose 15 to 35 4 to 10
F Firm 25 to 50 kPa MD Medium Dense 35 to 65 10 to 30
St Stiff 50 to 100 kPa D Dense 65 to 85 30 to 50
VSt Very Stiff 100 to 200 kPa VD Very Dense Above 85 Above 50
H Hard Above 200 kPa

GESI-A-039a RL1 1
EXPLANATION OF NOTES, ABBREVIATIONS & TERMS USED ON
BOREHOLE AND TEST PIT REPORTS

DRILLING/EXCAVATION METHOD
AS* Auger Screwing RD Rotary blade or drag bit HQ Diamond Core - 63 mm
AD* Auger Drilling RT Rotary Tricone bit NMLC Diamond Core - 52 mm
*V V-Bit RAB Rotary Air Blast NQ Diamond Core - 47 mm
*T TC-Bit, e.g. ADT RC Reverse Circulation BH Tractor Mounted Backhoe
HA Hand Auger PT Push Tube EX Tracked Hydraulic Excavator
ADH Hollow Auger CT Cable Tool Rig EE Existing Excavation
DTC Diatube Coring JET Jetting HAND Excavated by Hand Methods
WB Washbore or Bailer NDD Non-destructive drilling
PENETRATION/EXCAVATION RESISTANCE
L Low resistance. Rapid penetration possible with little effort from the equipment used.
M Medium resistance. Excavation/possible at an acceptable rate with moderate effort from the equipment used.
H High resistance to penetration/excavation. Further penetration is possible at a slow rate and requires
significant effort from the equipment.
R Refusal or Practical Refusal. No further progress possible without the risk of damage or unacceptable wear to
the digging implement or machine.
These assessments are subjective and are dependent on many factors including the equipment power, weight, condition
of excavation or drilling tools, and the experience of the operator.
WATER
Water level at date shown Partial water loss

Water inflow Complete water loss

GROUNDWATER NOT The observation of groundwater, whether present or not, was not possible due to drilling
OBSERVED water, surface seepage or cave in of the borehole/test pit.
GROUNDWATER NOT The borehole/test pit was dry soon after excavation. However, groundwater could be
ENCOUNTERED present in less permeable strata. Inflow may have been observed had the borehole/test pit
been left open for a longer period.
SAMPLING AND TESTING
SPT Standard Penetration Test to ASTM D.1586-08a-2011
4,7,11 N=18 4,7,11 = Blows per 150mm. N = Blows per 300mm penetration following 150mm seating
30/80mm Where practical refusal occurs, the blows and penetration for that interval are reported
RW Penetration occurred under the rod weight only
HW Penetration occurred under the hammer and rod weight only
HB Hammer double bouncing on anvil
DS Disturbed sample
BDS Bulk disturbed sample
G Gas Sample
W Water Sample
FP Field permeability test over section noted
FV Field vane shear test expressed as uncorrected shear strength (sv = peak value, sr = residual value)
TV Torvane test as instrument reading in kPa
PM Pressuremeter test over section noted
PP Pocket penetrometer test expressed as instrument reading in kPa
UDS Thin walled tube sample
WPT Water pressure tests
Ranking of Visually Observable Contamination and Odour (for specific soil contamination assessment projects)
R=0 No visible evidence of contamination R=A No non-natural odours identified
R=1 Slight evidence of visible contamination R=B Slight non-natural odours identified
R=2 Visible contamination R=C Moderate non-natural odours identified
R=3 Significant visible contamination R=D Strong non-natural odours identified
ROCK CORE RECOVERY
TCR = Total Core Recovery (%) SCR = Solid Core Recovery (%) RQD = Rock Quality Designation (%)
Length of core recovered
= X 100 Length of cylindrical core recovered Axial length of core >100 mm
Length of core run = X 100 = X 100
Length of core run Length of core run

GESI-A-038a RL1 1
TERMS FOR ROCK MATERIAL STRENGTH & WEATHERING
AND ABBREVIATIONS FOR DEFECT DESCRIPTIONS

STRENGTH
Point Load
Symbol Term Index, Is(50)
(MPa) Field Guide

EL Extremely < 0.03 Easily remoulded by hand to a material with soil properties.
Low
VL Very 0.03 to 0.1 Material crumbles under firm blows with sharp end of pick; can be peeled with knife; too
Low hard to cut a triaxial sample by hand. Pieces up to 30 mm can be broken by finger
pressure.
L Low 0.1 to 0.3 Easily scored with a knife; indentations 1 mm to 3 mm show in the specimen with firm
blows of pick point; has dull sound under hammer. A piece of core 150 mm long by 50 mm
diameter may be broken by hand. Sharp edges of core may be friable and break during
handling.
M Medium 0.3 to 1 Readily scored with a knife; a piece of core 150 mm long by 50 mm diameter can be
broken by hand with difficulty.
H High 1 to 3 A piece of core 150 mm long by 50 mm diameter cannot be broken by hand but can be
broken with pick with a single firm blow; rock rings under hammer.
VH Very 3 to 10 Hand specimen breaks with pick after more than one blow; rock rings under hammer.
High
EH Extremely >10 Specimen requires many blows with geological pick to break through intact material; rock
High rings under hammer.

ROCK STRENGTH TEST RESULTS


Point Load Strength Index, Is(50), Axial test (MPa)
Point Load Strength Index, Is(50), Diametral test (MPa)
Relationship between Is(50) and UCS (unconfined compressive strength) will vary with rock type and strength, and should be
determined on a site-specific basis. UCS is typically 10 to 30 x Is(50), but can be as low as 5 x
ROCK MATERIAL WEATHERING
Symbol Term Field Guide
Soil developed on extremely weathered rock; the mass structure and Substance fabric
RS Residual are no longer evident; there is a large change in volume but the soil has not been
significantly transported.
Soil
EW Extremely Rock is weathered to such an extent that it has soil properties - i.e. It either disintegrates
Weathered or can be remoulded, in water.

Rock strength usually changed by weathering. The rock may be highly Discoloured,
HW Distinctly usually by iron staining. Porosity may be increased by Leaching, or may be decreased
due to deposition of weathering products in Pores. In some environments it is
DW MW Weathered convenient to subdivide into highly Weathered and moderately weathered, with the
degree of alteration typically less for MW.
SW Slightly Rock is slightly discoloured but shows little or no change of strength relative to fresh
Weathered rock.

FR Fresh Rock shows no sign of decomposition or staining.


ABBREVIATIONS FOR DEFECT TYPES AND DESCRIPTIONS
Defect Type Coating or Infilling Roughness
B Bedding parting Cn Clean Sl Slickensided
X Foliation Sn Stain Sm Smooth
C Contact Vr Veneer Ro Rough
L Cleavage Ct Coating or Infill
J Joint Planarity
SS/SZ Sheared seam/zone (Fault) Pl Planar Vertical Boreholes The dip (inclination
from horizontal) of the defect is given.
CS/CZ Crushed seam/zone (Fault) Un Undulating
DS/DZ Decomposed seam/zone St Stepped
Inclined Boreholes The inclination is
IS/IZ Infilled seam/zone measured as the acute angle to the core
S Schistocity axis.
V Vein
q:\9. gesi - gaims\forms\report forms\gesi-a-040 terms for rock material rl0.docx

Version: GESI-A-040 RL

20 1/1
PRELIMINARY
REPORT OF BOREHOLE: BH-07
Client: PT. Batutua Tembaga Raya Coordinates: 204454.66 m E 9148576.06 m N UTM Start date : 24 Jul 2021 Sheet: 1 of 4
Project: Geotechnical Investigation For Wetar Barge Jetty Surface RL: 7.09 m Datum: WGS-84 End date: 11 Aug 2021
Location: Wetar Island, Southwest Maluku Drilling Method: Full Coring Logged by: EPR
Job No.: 21465360 Inclination: -90° Checked by:
Drilling Field Material Description Lab Testing Defect Information
Ip INFERRED FRACTURE

WEATHERING
STRENGTH FREQUENCY
RECOVERED/ Wn

CONSISTENCY
USC Symbol
(MPa) (Defects per
SAMPLING SPT (N Value) Wp Wl DEFECT DESCRIPTION

MOISTURE
SAMPLE OR SOIL / ROCK MATERIAL DESCRIPTION
(metres)

(metres)

GRAPHIC
unit metre
RQD (%)

DENSITY
TCR (%)
WGS-84

(%)
SCR (%)
WATER

FIELD TEST N Value

240
DEPTH

length)

0.7
2.4

24
70
& Additional Observations

7
DEPTH

LOG

GSI
0 20 40 60 80 20 40 60 80
RL

VH
RL

EH
VL

10
15
20
25
30
EL

M
H
L

5
0.0 7.09
7.0 Sample loss
(Sand material fine to coarse grained
suspected from diner information)

0.5
6.5

SPT, 0.75-1.20 m
(2/450) N=0
Rec=0.00 m
1.0
6.0
1.20
5.89 GP Poorly-graded GRAVEL with sand, fine to
coarse grained, subangular-subrounded, dark
grey, fine to coarse grained sand, with some
1.5 SPT, 1.50-1.95 m
5.5
cobbles up to 80 mm dia
(5, 13, 16) N=29
Rec=0.45 m

2.0
5.0

SPT, 2.25-2.70 m
(9, 11, 8) N=19
Rec=0.00 m
2.5
4.5

3.0 SPT, 3.00-3.45 m


4.0 (4, 9, 14) N=23
Rec=0.36 m
MD

3.5
3.5

SPT, 3.75-4.20 m
(4, 8, 9) N=17
Rec=0.45 m
4.0
GESI_BH_GLB CONSOL_2.GLB VY - SOIL/ROCK SUMMARY WITH LAB 2 C:\USERS\EX_AGUNO\ONEDRIVE - GOLDER ASSOCIATES\DESKTOP\PROJECT\21465360 PT. BATUTUA TEMBAGA RAYA\21465360-BH.GPJ GESI_04.GDT 16/08/2021 09:58:35

3.0

4.5 SPT, 4.50-4.95 m


2.5 (4, 5, 5) N=10
Rec=0.20 m

4.95
5.0 2.14 grades grey
2.0

SPT, 5.25-5.70 m
(5, 3, 4) N=7
Rec=0.08 m
5.5
1.5
W
L

6.0 SPT, 6.00-6.45 m


1.0 (4, 5, 8) N=13
Rec=0.00 m

6.5
0.5
MD

SPT, 6.75-7.20 m
(6, 14, 13) N=27
Rec=0.45 m
7.0
0.0

7.5 SPT, 7.50-7.95 m


-0.5 (25, 20, 16) N=36
Rec=0.40 m

8.0
-1.0
D

8.5
-1.5

9.0 SPT, 9.00-9.36 m


-2.0 (15, 25, 50/60, HB)
N>50
Rec=0.35 m
VD

9.5
-2.5

10.00
10.0

This report must be read in conjunction with accompanying notes and abbreviations.
GAP gINT FN.
RL
PRELIMINARY
REPORT OF BOREHOLE: BH-07
Client: PT. Batutua Tembaga Raya Coordinates: 204454.66 m E 9148576.06 m N UTM Start date : 24 Jul 2021 Sheet: 2 of 4
Project: Geotechnical Investigation For Wetar Barge Jetty Surface RL: 7.09 m Datum: WGS-84 End date: 11 Aug 2021
Location: Wetar Island, Southwest Maluku Drilling Method: Full Coring Logged by: EPR
Job No.: 21465360 Inclination: -90° Checked by:
Drilling Field Material Description Lab Testing Defect Information
Ip INFERRED FRACTURE

WEATHERING
STRENGTH FREQUENCY
RECOVERED/ Wn

CONSISTENCY
USC Symbol
(MPa) (Defects per
SAMPLING SPT (N Value) Wp Wl DEFECT DESCRIPTION

MOISTURE
SAMPLE OR SOIL / ROCK MATERIAL DESCRIPTION
(metres)

(metres)

GRAPHIC
unit metre
RQD (%)

DENSITY
TCR (%)
WGS-84

(%)
SCR (%)
WATER

FIELD TEST N Value

240
DEPTH

length)

0.7
2.4

24
70
& Additional Observations

7
DEPTH

LOG

GSI
0 20 40 60 80 20 40 60 80
RL

VH
RL

EH
VL

10
15
20
25
30
EL

M
H
L

5
10.0 -2.91
-3.0 BASALTIC LAVA, fine grained, grey, with SW 65 BEDROCK
vesicular structure, hamering test at 10.50
100 20 34 m, 50 blows/140 mm, using spt split spoon
with solid cone tip and hit by hammer spt
10.50
10.5 -3.41
-3.5 becomes brecciated clast supported up to 10 50
mm diameter, with some calcite veinlet,
hammering test at 12.00 m, 50 blows/90 mm

11.0
-4.0

100 20 20

11.5
-4.5

12.0
-5.0 65
100 0 0
12.30
-5.21 Core loss
12.50
12.5
-5.5
-5.41 BASALTIC LAVA, fine grained, grey, with SW 65
vesicular structure, brecciated at
12.50-13.10 m, clast supported up to 10 mm
dia, with some calcite veinlet, hammering
75 33 44 12.85 m: J, R=4, i=3-5°, CA=30°,
test at 13.50 m depth, 50 blows/80 mm clay and calcite infill below 1 mm thick
13.0
-6.0
13.20 m: J, R=4, i=3-5°, CA=40°,
clay and calcite infill below 1 mm thick
13.26 m: J, R=4, i=3-5°, CA=30°,
13.5 clay and calcite infill below 1 mm thick
-6.5 13.30 m: J, R=4, i=3-5°, CA=30°,
clay and calcite infill below 1 mm thick
13.38 m: J, R=4, i=2-3°, CA=60°,
clay and calcite infill below 1 mm thick
13.43 m: J, R=4, i=3-5°, CA=20°,
clay and calcite infill below 1 mm thick
14.0 13.59 m: J, R=4, i=3-5°, CA=20°,
GESI_BH_GLB CONSOL_2.GLB VY - SOIL/ROCK SUMMARY WITH LAB 2 C:\USERS\EX_AGUNO\ONEDRIVE - GOLDER ASSOCIATES\DESKTOP\PROJECT\21465360 PT. BATUTUA TEMBAGA RAYA\21465360-BH.GPJ GESI_04.GDT 16/08/2021 09:58:35

-7.0 clay and calcite infill below 1 mm thick


13.78 m: J, R=4, i=1-2°, CA=40°,
100 13 11 clay and calcite infill below 1 mm thick
14.10 m: J, R=4, i=3-5°, CA=40°,
clay and calcite infill below 1 mm thick
14.5 14.17 m: J, R=4, i=1-2°, CA=50°,
-7.5 clay and calcite infill below 1 mm thick

14.80
-7.71 brecciated at 14.80-15.00 m, clast supported
15.00 up to 10 mm dia, fractured, with some
15.0
-8.0 15.10 calcite veinlet
-8.01 Core loss SW 60
80 0 0 BASALTIC LAVA, fine grained, grey, with
vesicular structure, brecciated at
15.5
15.50 15.20-15.50 m, clast supported up to 10 mm
-8.41
-8.5 dia, with some calcite veinlet
Core loss
15.80 40 0 0
-8.71 BASALTIC LAVA, fine grained, grey, with SW 55
vesicular structure, fractured, with some
16.0
-9.0
calcite veinlet 65
16.16 m: J, R=4, i=3-5°, CA=25°,
clay and calcite infill below 1 mm thick
16.31 m: J, R=4, i=3-5°, CA=50°,
clay and calcite infill below 1 mm thick
16.5 100 43 34
-9.5

17.00
17.0 -9.91
-10.0 becomes brecciated at 17.65-18.00 m, clast
supported up to 10 mm diameter

17.38 m: J, R=4, i=3-5°, CA=20°


17.5 100 47 36
-10.5

18.00
18.0
-11.0
-10.91 becomes brecciated at 18.00-19.00 m, clast
supported up to 10 mm diameter

18.5
-11.5

19.00
19.0
-12.0
-11.91 becomes brecciated at 19.00-19.22, 60
19.40-19.53, 19.75-19.85 m depth

19.5 100 26 22
-12.5

20.00
20.0

This report must be read in conjunction with accompanying notes and abbreviations.
GAP gINT FN.
RL
PRELIMINARY
REPORT OF BOREHOLE: BH-07
Client: PT. Batutua Tembaga Raya Coordinates: 204454.66 m E 9148576.06 m N UTM Start date : 24 Jul 2021 Sheet: 3 of 4
Project: Geotechnical Investigation For Wetar Barge Jetty Surface RL: 7.09 m Datum: WGS-84 End date: 11 Aug 2021
Location: Wetar Island, Southwest Maluku Drilling Method: Full Coring Logged by: EPR
Job No.: 21465360 Inclination: -90° Checked by:
Drilling Field Material Description Lab Testing Defect Information
Ip INFERRED FRACTURE

WEATHERING
STRENGTH FREQUENCY
RECOVERED/ Wn

CONSISTENCY
USC Symbol
(MPa) (Defects per
SAMPLING SPT (N Value) Wp Wl DEFECT DESCRIPTION

MOISTURE
SAMPLE OR SOIL / ROCK MATERIAL DESCRIPTION
(metres)

(metres)

GRAPHIC
unit metre
RQD (%)

DENSITY
TCR (%)
WGS-84

(%)
SCR (%)
WATER

FIELD TEST N Value

240
DEPTH

length)

0.7
2.4

24
70
& Additional Observations

7
DEPTH

LOG

GSI
0 20 40 60 80 20 40 60 80
RL

VH
RL

EH
VL

10
15
20
25
30
EL

M
H
L

5
20.0 -12.91
-13.0 Core loss 19.95 m: J, R=4, i=3-5°, CA=20°,
clay and calcite infill below 1 mm thick

20.5 40 0 0
-13.5 20.60
-13.51 BASALTIC LAVA, fine grained grey, with SW 55
vesicular structure, fractured, with some
calcite veinlet
21.0
-14.0

21.30 100 0 0 21.23 m: J, R=4, i=3-5°, CA=20°,


-14.21 becomes brecciated at 21.30-21.40 m depth calcite infill below 1 mm thick
21.50
21.5
-14.5
-14.41 Core loss

22.00
22.0
-15.0
-14.91 BASALTIC LAVA, fine grained, grey, with SW 60
vesicular structure, brecciated at
67 21 20 22.15-22.60 m, clast supported up to 10 mm
diameter, fractured, with some calcite
veinlet
22.5
-15.5

23.00
23.0
-16.0
-15.91 becomes without brecciated, fragmented at
23.13-23.22 m, 23.60-23.80 m depth 23.15 m: J, R=4, i=1-3°, CA=40°,
calcite infill below 1 mm thick

23.5 100 15 10
-16.5

24.00
24.0 -16.91 becomes brecciated at 24.58-24.90 m,
GESI_BH_GLB CONSOL_2.GLB VY - SOIL/ROCK SUMMARY WITH LAB 2 C:\USERS\EX_AGUNO\ONEDRIVE - GOLDER ASSOCIATES\DESKTOP\PROJECT\21465360 PT. BATUTUA TEMBAGA RAYA\21465360-BH.GPJ GESI_04.GDT 16/08/2021 09:58:35

-17.0
fragmented at 24.00-24.10, 24.26-24.45 m
depth

24.5 100 38 33
-17.5

25.00
25.0
-18.0
-17.91 brecciated at 25.00-25.35, 25.65-26.00 m 65
depth

25.5 100 73 62
-18.5

26.00
26.0
-19.0
-18.91 brecciated at 26.00-26.80 m depth

26.5 100 24 20
-19.5

27.0
-20.0 70 27.03 m: J, R=4, i=1-2°, CA=30°,
calcite infill below 1 mm thick
27.25 m: J, R=4, i=3-5°, CA=20°,
calcite infill below 1 mm thick
27.40 m: J, R=4, i=3-5°, CA=30°,
27.5 100 36 24 clay and calcite infill below 1 mm thick
-20.5
27.64 m: J, R=4, i=3-5°, CA=40°,
clay and calcite infill below 1 mm thick

28.0
-21.0 65

28.5 100 24 19
-21.5

29.00
29.0
-22.0
-21.91 brecciated at 29.30-29.40 m depth 70

29.5 100 87 70 29.47 m: J, R=4, i=1-3°, CA=30°,


-22.5 calcite infill below 1 mm thick

30.00
30.0

This report must be read in conjunction with accompanying notes and abbreviations.
GAP gINT FN.
RL
PRELIMINARY
REPORT OF BOREHOLE: BH-07
Client: PT. Batutua Tembaga Raya Coordinates: 204454.66 m E 9148576.06 m N UTM Start date : 24 Jul 2021 Sheet: 4 of 4
Project: Geotechnical Investigation For Wetar Barge Jetty Surface RL: 7.09 m Datum: WGS-84 End date: 11 Aug 2021
Location: Wetar Island, Southwest Maluku Drilling Method: Full Coring Logged by: EPR
Job No.: 21465360 Inclination: -90° Checked by:
Drilling Field Material Description Lab Testing Defect Information
Ip INFERRED FRACTURE

WEATHERING
STRENGTH FREQUENCY
RECOVERED/ Wn

CONSISTENCY
USC Symbol
(MPa) (Defects per
SAMPLING SPT (N Value) Wp Wl DEFECT DESCRIPTION

MOISTURE
SAMPLE OR SOIL / ROCK MATERIAL DESCRIPTION
(metres)

(metres)

GRAPHIC
unit metre
RQD (%)

DENSITY
TCR (%)
WGS-84

(%)
SCR (%)
WATER

FIELD TEST N Value

240
DEPTH

length)

0.7
2.4

24
70
& Additional Observations

7
DEPTH

LOG

GSI
0 20 40 60 80 20 40 60 80
RL

VH
RL

EH
VL

10
15
20
25
30
EL

M
H
L

5
30.0 -22.91
-23.0 BASALTIC LAVA, fine grained, grey, with SW 70
vesicular structure, brecciated, clast
supported up to 10 mm dia, fractured, with
30.40 some calcite veinlet
-23.31 brecciated at 30.40-30.65 m depth
30.5 100 68 64
-23.5

31.00
31.0
-24.0
-23.91 becomes fragmented at 31.00-31.58 m depth 65

31.5 100 31 28
-24.5

32.00
32.0
-25.0
-24.91 fragmented at 32.00-32.40, 32.60-32.80 m
depth

32.5 100 18 13
-25.5

32.90 m: J, R=4, i=3-5°, CA=20°,


33.0 calcite infill below 1 mm thick
-26.0

33.50
33.5 100 52 40
-26.5
-26.41 brecciated at 33.50-34.00 m, fragmented at
33.20-33.50 m

34.00
34.0 -26.91 brecciated at 34.00-34.25 m depth
GESI_BH_GLB CONSOL_2.GLB VY - SOIL/ROCK SUMMARY WITH LAB 2 C:\USERS\EX_AGUNO\ONEDRIVE - GOLDER ASSOCIATES\DESKTOP\PROJECT\21465360 PT. BATUTUA TEMBAGA RAYA\21465360-BH.GPJ GESI_04.GDT 16/08/2021 09:58:36

-27.0

34.5 100 38 34
-27.5
34.63 m: J, R=4, i=3-5°, CA=30°,
calcite infill below 1 mm thick
34.69 m: J, R=4, i=1-2°, CA=40°,
calcite infill below 1 mm thick
35.0
-28.0 70

35.5 100 50 46
-28.5 35.56 m: J, R=4, i=3-5°, CA=40°,
calcite infill below 1 mm thick

36.00
36.0
-29.0
-28.91 fragmented at 36.00-36.45 m depth 65

36.5 100 31 16
-29.5

36.82 m: J, R=4, i=3-5°, CA=20°,


37.00 calcite infill below 1 mm thick
37.0 -29.91 36.90 m: J, R=4, i=1-3°, CA=50°,
-30.0 becomes without brecciated 70 c;ay and calcite infill below 1 mm thick

37.5 100 64 50
-30.5

38.0
-31.0 65

38.5 100 40 35
-31.5 38.60
-31.51 brecciated at 38.60-39.00 m depth

39.0
-32.0 70

39.5 100 0 0
-32.5

40.00
40.0
End of Borehole @ 40.00 m depth
This report must be read in conjunction with accompanying notes and abbreviations.
GAP gINT FN.
RL
PRELIMINARY
REPORT OF BOREHOLE: BH-12
Client: PT. Batutua Tembaga Raya Coordinates: 204428.326 m E 914848.832 m N UTM Start date : 07 Aug 2021 Sheet: 1 of 4
Project: Geotechnical Investigation For Wetar Barge Jetty Surface RL: 23.598 m Datum: WGS-84 End date: 13 Aug 2021
Location: Wetar Island, Southwest Maluku Drilling Method: Full Coring Logged by: EPR/BT
Job No.: 21465360 Inclination: -90° Checked by:
Drilling Field Material Description Lab Testing Defect Information
Ip INFERRED FRACTURE

WEATHERING
STRENGTH FREQUENCY
RECOVERED/ Wn

CONSISTENCY
USC Symbol
(MPa) (Defects per
SAMPLING SPT (N Value) Wp Wl DEFECT DESCRIPTION

MOISTURE
SAMPLE OR SOIL / ROCK MATERIAL DESCRIPTION
(metres)

(metres)

GRAPHIC
unit metre
RQD (%)

DENSITY
TCR (%)
WGS-84

(%)
SCR (%)
WATER

FIELD TEST N Value

240
DEPTH

length)

0.7
2.4

24
70
& Additional Observations

7
DEPTH

LOG

GSI
0 20 40 60 80 20 40 60 80
RL

VH
RL

EH
VL

10
15
20
25
30
EL

M
H
L

5
0.0 23.60 GP Poorly-graded GRAVEL with sand, fine to AGGLOMERATE
23.5
coarse grained, subangular, fine to coarse
grained sand, grey and bronw, dry, trace of
low plasticity fines
0.5
23.0

0.81 SPT, 0.75-0.81 m


22.79 (50/60, HB) N>50 trace of cobbles
Rec=0.06 m
1.0
22.5

VD
D
1.5 SPT, 1.50-1.74 m
22.0 (40, 50/90, HB)
N>50
Rec=0.23 m

2.0
21.5

SPT, 2.25-2.37 m
2.37 (50/120, HB) N>50
21.23 Rec=0.12 m BASALTIC LAVA, fine grain, grey, vesicular SW 60 BEDROCK
2.5 structured 2.50 m: J, R=7, i=2-3°, CA=40°,
21.0 clay infill
100 63 63

3.0
20.5 70

3.5 3.50 m: J, R=4 i=1-3°, CA=50°,


20.0 clay infill
100 87 87
3.75 m: J, R=4 i=1-2°, CA=25°
3.82 m: J, R=4 i=1-3°, CA=35°
4.0
GESI_BH_GLB CONSOL_2.GLB VY - SOIL/ROCK SUMMARY WITH LAB 2 C:\USERS\EX_AGUNO\ONEDRIVE - GOLDER ASSOCIATES\DESKTOP\PROJECT\21465360 PT. BATUTUA TEMBAGA RAYA\21465360-BH.GPJ GESI_04.GDT 16/08/2021 09:58:41

19.5

4.50
4.5
19.0
19.10 trace of calcite vein in places 4.55 m: J, R=7, i=1-2°, CA=30°,
clay infill
4.65 m: J, R=7, i=1-2°, CA=50°,
clay infill

5.0
18.5
100 86 86

5.5
18.0

5.85 m: J, R=4, i=2-3°, CA=50°


6.0
17.5 60

6.23 m: J, R=5 i=1-2°, CA=60°

6.5 6.45 m: J, R=4, i=2-4°, CA=40°,


17.0 calcite infill
6.63 m: J, R=4, i=2-3°, CA=50°,
100 60 60 calcite infill
6.73 m: J, R=4, i=3-4°, CA=50°

7.0
16.5

7.23 m: J, R=4, i=2-4°, CA=50°

7.5
16.0

7.85 m: J, R=7, i=1-2°, CA=30°


8.00
8.0
15.5
15.60 possibility crushed zone between at 8.00-9.70
m depth, becomes fractured
100 63 63

8.5
15.0

9.0
14.5

9.5
14.0
100 26 40
9.82 m: J, R=4, i=2-3°, CA=45°
10.0

This report must be read in conjunction with accompanying notes and abbreviations.
GAP gINT FN.
RL
PRELIMINARY
REPORT OF BOREHOLE: BH-12
Client: PT. Batutua Tembaga Raya Coordinates: 204428.326 m E 914848.832 m N UTM Start date : 07 Aug 2021 Sheet: 2 of 4
Project: Geotechnical Investigation For Wetar Barge Jetty Surface RL: 23.598 m Datum: WGS-84 End date: 13 Aug 2021
Location: Wetar Island, Southwest Maluku Drilling Method: Full Coring Logged by: EPR/BT
Job No.: 21465360 Inclination: -90° Checked by:
Drilling Field Material Description Lab Testing Defect Information
Ip INFERRED FRACTURE

WEATHERING
STRENGTH FREQUENCY
RECOVERED/ Wn

CONSISTENCY
USC Symbol
(MPa) (Defects per
SAMPLING SPT (N Value) Wp Wl DEFECT DESCRIPTION

MOISTURE
SAMPLE OR SOIL / ROCK MATERIAL DESCRIPTION
(metres)

(metres)

GRAPHIC
unit metre
RQD (%)

DENSITY
TCR (%)
WGS-84

(%)
SCR (%)
WATER

FIELD TEST N Value

240
DEPTH

length)

0.7
2.4

24
70
& Additional Observations

7
DEPTH

LOG

GSI
0 20 40 60 80 20 40 60 80
RL

VH
RL

EH
VL

10
15
20
25
30
EL

M
H
L

5
10.0
13.5
BASALTIC LAVA, fine grain, grey, vesicular SW 60
structured

10.5 10.47 m: J, R=4, i=3-4°, CA=30°,


13.0 45 clay infill
10.65 m: J, R=4, i=4-5°, CA=40°,
clay infill

11.0
12.5
100 26 26

11.5
12.0

12.0
11.5 60

12.5
11.0 12.59 m: J, R=4, i=4-5°, CA=40°,
100 60 60
clay infill

13.0
10.5

13.5
10.0

14.0
GESI_BH_GLB CONSOL_2.GLB VY - SOIL/ROCK SUMMARY WITH LAB 2 C:\USERS\EX_AGUNO\ONEDRIVE - GOLDER ASSOCIATES\DESKTOP\PROJECT\21465360 PT. BATUTUA TEMBAGA RAYA\21465360-BH.GPJ GESI_04.GDT 16/08/2021 09:58:41

9.5
14.15 m: J, R=7, i=1-2°, CA=45°,
100 66 70 clay infill

14.38 m: J, R=4, i=3-4°, CA=45°


14.5
9.0

15.00
15.0
8.5
8.60 becomes brecciated, clast supported, 70 15.05 m: J, R=7, i=2-4°, CA=50°
fractured

15.5
8.0
100 73 73

16.0
7.5

16.50
16.5 7.10
7.0
trace of calcite vein in parts, with 60
fragmented

17.0
6.5
100 26 26

17.5
6.0 17.53 m: J, R=5, i=2-4°, CA=50°

18.0
5.5

18.5 18.55
5.0 5.05 becomes fractured at 18.55-19.00 m, 45
100 13 13
possibility crushed zone

19.0
4.5 60

19.5
4.0 70
19.65 m: J, R=4, i=3-4°, CA=55°

20.00
20.0

This report must be read in conjunction with accompanying notes and abbreviations.
GAP gINT FN.
RL
PRELIMINARY
REPORT OF BOREHOLE: BH-12
Client: PT. Batutua Tembaga Raya Coordinates: 204428.326 m E 914848.832 m N UTM Start date : 07 Aug 2021 Sheet: 3 of 4
Project: Geotechnical Investigation For Wetar Barge Jetty Surface RL: 23.598 m Datum: WGS-84 End date: 13 Aug 2021
Location: Wetar Island, Southwest Maluku Drilling Method: Full Coring Logged by: EPR/BT
Job No.: 21465360 Inclination: -90° Checked by:
Drilling Field Material Description Lab Testing Defect Information
Ip INFERRED FRACTURE

WEATHERING
STRENGTH FREQUENCY
RECOVERED/ Wn

CONSISTENCY
USC Symbol
(MPa) (Defects per
SAMPLING SPT (N Value) Wp Wl DEFECT DESCRIPTION

MOISTURE
SAMPLE OR SOIL / ROCK MATERIAL DESCRIPTION
(metres)

(metres)

GRAPHIC
unit metre
RQD (%)

DENSITY
TCR (%)
WGS-84

(%)
SCR (%)
WATER

FIELD TEST N Value

240
DEPTH

length)

0.7
2.4

24
70
& Additional Observations

7
DEPTH

LOG

GSI
0 20 40 60 80 20 40 60 80
RL

VH
RL

EH
VL

10
15
20
25
30
EL

M
H
L

5
20.0 3.60
3.5
BASALTIC LAVA, fine grain, grey, vesicular SW 70
structure, with calcite vein in places,
100 48 56 fragmented

20.5
3.0

21.0
2.5
21.12 m: J, R=4, i=2-4°, CA=50°,
iron stain infill
21.25 m: J, R=5, i=1-3°, CA=30°,
clay infill
21.5
2.0
100 30 50

22.0
1.5

22.27 m: J, R=4, i=2-3°, CA=40°,


clay infill
22.5
1.0 45

23.0
0.5
100 13 37

23.5 60
0.0

23.75 m: J, R=4, i=4-5°, CA=35°,


clay infill
24.0
24.00 m: J, R=4, i=5-6°, CA=40°,
GESI_BH_GLB CONSOL_2.GLB VY - SOIL/ROCK SUMMARY WITH LAB 2 C:\USERS\EX_AGUNO\ONEDRIVE - GOLDER ASSOCIATES\DESKTOP\PROJECT\21465360 PT. BATUTUA TEMBAGA RAYA\21465360-BH.GPJ GESI_04.GDT 16/08/2021 09:58:41

-0.5 calcite infill

24.5
-1.0
100 35 43 24.70 m: J, R=7, i=7-8°, CA=45°
24.80 m: J, R=4, i=6-7°, CA=50°,
clay infill
25.0
-1.5

25.5
-2.0

26.0
-2.5
26.25
100 63 73
-2.65 brecciated at 26.25-27.00 m, clast supported

26.5
-3.0

27.0
-3.5

35
27.5
-4.0
100 20 20

28.0
-4.5
28.20
-4.60 becomes pulverized at 28.20-28.50 m depth

28.5
-5.0

29.0
-5.5
100 0 9

29.5
-6.0 29.55 m: J, R=7, i=1-2°, CA=35°

30.00
30.0

This report must be read in conjunction with accompanying notes and abbreviations.
GAP gINT FN.
RL
PRELIMINARY
REPORT OF BOREHOLE: BH-12
Client: PT. Batutua Tembaga Raya Coordinates: 204428.326 m E 914848.832 m N UTM Start date : 07 Aug 2021 Sheet: 4 of 4
Project: Geotechnical Investigation For Wetar Barge Jetty Surface RL: 23.598 m Datum: WGS-84 End date: 13 Aug 2021
Location: Wetar Island, Southwest Maluku Drilling Method: Full Coring Logged by: EPR/BT
Job No.: 21465360 Inclination: -90° Checked by:
Drilling Field Material Description Lab Testing Defect Information
Ip INFERRED FRACTURE

WEATHERING
STRENGTH FREQUENCY
RECOVERED/ Wn

CONSISTENCY
USC Symbol
(MPa) (Defects per
SAMPLING SPT (N Value) Wp Wl DEFECT DESCRIPTION

MOISTURE
SAMPLE OR SOIL / ROCK MATERIAL DESCRIPTION
(metres)

(metres)

GRAPHIC
unit metre
RQD (%)

DENSITY
TCR (%)
WGS-84

(%)
SCR (%)
WATER

FIELD TEST N Value

240
DEPTH

length)

0.7
2.4

24
70
& Additional Observations

7
DEPTH

LOG

GSI
0 20 40 60 80 20 40 60 80
RL

VH
RL

EH
VL

10
15
20
25
30
EL

M
H
L

5
30.0 -6.40
-6.5
BASALTIC LAVA, fine grain, grey, vesicular SW 60
structure, with calcite vein in places,
fragmented

30.5
-7.0
100 38 44

31.0
-7.5

31.5
-8.0 35

32.0
-8.5 60 32.05 m: J, R=7, i=2-4°, CA=39°

100 32 38

32.39 m: J, R=4, i=2-3°, CA=60°


32.5
-9.0

33.0
-9.5 70

33.21 m: J, R=4, i=4-6°, CA=40°,


clay infill

33.5
-10.0

33.80 100 70 73
-10.20 becomes brecciated at 33.80-34.50 m depth
34.0
GESI_BH_GLB CONSOL_2.GLB VY - SOIL/ROCK SUMMARY WITH LAB 2 C:\USERS\EX_AGUNO\ONEDRIVE - GOLDER ASSOCIATES\DESKTOP\PROJECT\21465360 PT. BATUTUA TEMBAGA RAYA\21465360-BH.GPJ GESI_04.GDT 16/08/2021 09:58:41

-10.5

34.5
-11.0

35.0
-11.5
100 74 74

35.5
-12.0

35.85 m: J, R=5, i=2-3°, CA=30°,


36.0 clay infill
-12.5

36.5
-13.0
100 44 46
36.83 m: J, R=5, i=3-4°, CA=55°
37.0
-13.5 30

37.5
-14.0

38.0
-14.5 70

100 55 55

38.5
-15.0

39.0
-15.5 55

39.5 100 60 60
-16.0

39.92 m: J, R=4, i=5°, CA=30°,


calcite infill
40.00
40.0
End of Borehole @ 40.00 m depth
This report must be read in conjunction with accompanying notes and abbreviations.
GAP gINT FN.