Equipment Inspection Report

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

EQUIPMENT INSPECTION REPORT

Commodity: Wheel Loader ______


Contract N#: 011223

Basic Information
Production N#: 771370 Model CLG877
Engine N#: 93160139 Cab N# 66F00450017B001

New Machine Appearance and Condition


OK( ) Crack(√ )
Windscreen: Status Description La vitre avant présente des défauts de fissures
Damaged( )
OK( √ ) Crack( )
Wheels: Status Description
Damaged( )
OK( √ ) Rusted( )
Hinges: Status Description
Broken( )
Bucket Model: RIGHT( √ ) Wrong( ) Status Description
OK( √ ) Rusted( )
Attachments: Status Description
Broken( )
Spare-parts OK( √ ) Crack( )
Status Description
case: Damaged( )
OK( ) Crack( √ )
Other: Status Description Frame capot moteur dégradé
Damaged( )
OK() Crack( √ )
Other: Status Description
Damaged( )
Fluid Levels
10L( ) 5L( √) 100%( ) 75%( )
Fuel Engine Oil volume Status: Not checked
0L( ) 50%( √ )
Hydraulic Oil 100%( √ ) 75%( ) no( √ ) some( )
Oil leakage Status: OK
volume 50%( ) much( )
-35( ) -15°C( ) no( √ ) some( )
Coolant Coolant leakage Status: OK
0°C( √ ) much( )
Battery Voltage &
Normal ( √ ) Deficient ( )Status Description
Electrolyte Level
Summary: Le capot moteur dégradé présente des defauts de levage / Compteur Horaire : 6,3 H

Inspector Signature: O'Neill BROKOUA / HASSAN Inspection Date: 01/12/2023


REMARKS:
1. THIS EQUIPMENT INSPECTION REPORT (BLANK) WILL BE ATTACHED INSIDE OF THE CAB WHEN
DELIVERYED, ONE COPY IS ALONGWITH EACH MACHINE.
2. AFTER YOU FINISH THE INSPECTION, EMAIL THIS REPORT AND PICTURES TO LIYQ@LIUGONG.COM &
WANGP@LIUGONG.COM WITHIN 8 WORKING DAYS

THANK YOU FOR YOUR COOPERATION.

You might also like