PROPOSED
BOUNDARY WALL
PROPOSED ADMIN
& CONTROL ROOM
GENERAL NOTES :
F2
F2
5660
1. ALL DIMENSIONS ARE IN MILLIMETERS EXCEPT SITE LAYOUT AND
5660
F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1
LEVELS ARE IN METERS, UNLESS NOTED OTHERWISE.
2. DRAWINGS SHALL NOT BE SCALED. ANY DISCREPANCIES
BETWEEN THE DRAWINGS & WRITTEN DIMENSIONS,
THE WRITTEN DIMENSIONS SHALL GOVERN.
C1
C1
ARCHITECT :
F1
F1
ABEIR ELEZABI 050-3384030
STRUCTURAL ENGINEER :
MOHAMED MAGDELDIN 055-5500645
00 ISSUED FOR APPROVAL 30/03/2020
6170
6170
REV. NO. DESCRIPTION Date
C1
C1
F1
F1
EMPLOYER:
6170
(All Footings are centered with columns UNO.) AL AIN CITY MUNICIPALITY
- No of floors = ONE FLOOR .
C1
F1
F1
must be done before execution start by the contractor.
OWNER:
- Foundation level is @ 1.00m below ZERO level, (as
6170
6170
per required excavation depth below EGL.),
DEPARTMENT OF
to be verified with the final soil investigation report that MUNICIPALITIES AND
must be done before execution start by the contractor.
TRANSPORT
AL AIN CITY MUNICIPALITY
C1
C1
F1
F1
6170
CONSULTANT :
- The foundation ground shall be proof rolled with vibratory
compactor to confirm that any loose materials are compacted
to not less than 95% of max. dry density.
TECHNICAL ENGINEERING & SCIENTIFIC STUDIES Co. (Ltd)
C1
F1
C1
F1
-All Pre-cast Boundary Wall with (Admin AL AIN -TEL : 7629920 - P.O.BOX : 16420 - FAX :
7629906 ABU DHABI -TEL : 6313513 - FAX: 6313342
and Control Rooms) drawings,
are indicative to tendering purpose only, so, TESSCO
6170
6170
shop drawings and structural calculation
should be submitted by specialist sub-contractor to the
PROJECT NAME :
authorities approval before execution start at site.
REHABILITATION OF BOUNDARY
C1
F1
C1
F1
WALLS OF GRAVES IN AL AIN
ZONE :
6170
6170
AL HAYER
SECTOR NO : PLOT NO :
C1
C1
F1
F1
THE CONTRACTOR HAS TO CLOSE ANY GAP BETWEEN PRECAST PANEL BOTTOM AND GROUND LEVEL
WITH SOLID BLOCK TO BE FINISHED WITH BITUMINOUS MATERIAL AS PER SPECIFICATION 10 55-10-801-234
PROJECT DESCRIPTION :
6170
6170
REHABILITATION OF BOUNDARY
WALLS OF GRAVES IN AL AIN
C1
C1
F1
F1
6170
6170
DRAWING TITLE :
C1
F1
F1
6170
6170
DRAWING NO :
REVISION NO:
S-001
00
C1
C1
F1
F1
SUBMISSION DATE :
SCALE :
30/03/2020
1:150
6170
6170
PROJECT ID :
PLAN ID :
B2N-2019-006503
B2N-2019-006503
C1
C1
F1
F1
OFFICE USE ONLY :
SEE ADMIN & CONTROL ROOM DETAILS
DWG. S-003
CONNECTION BETWEEN
6395
6395
F2
F2
C2 C1
C1 C1 C1 C1 C1 C1 C1 C1 C1 C2
C4 C3
F2
6044
6170 6170 6170 6170 6170 6020 500 4000 500 1250 5700 6085 6170 6170 6170 4401