Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

LAND KEY :

PROPOSED
BOUNDARY WALL

PROPOSED ADMIN
& CONTROL ROOM

PLOT LIMIT PLOT LIMIT


PROPOSED
4910 6170 6170 6170 6170 6170 6170 6170 6170 6170 6170 6170 6170 4910
GATE
PROPOSED BOUNDARY
WALL WITH
C2 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C2 DECORATIVE STEEL

GENERAL NOTES :

F2
F2

5660
1. ALL DIMENSIONS ARE IN MILLIMETERS EXCEPT SITE LAYOUT AND
5660

F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1
LEVELS ARE IN METERS, UNLESS NOTED OTHERWISE.
2. DRAWINGS SHALL NOT BE SCALED. ANY DISCREPANCIES
BETWEEN THE DRAWINGS & WRITTEN DIMENSIONS,
THE WRITTEN DIMENSIONS SHALL GOVERN.
C1

C1
ARCHITECT :
F1

F1
ABEIR ELEZABI 050-3384030
STRUCTURAL ENGINEER :
MOHAMED MAGDELDIN 055-5500645
00 ISSUED FOR APPROVAL 30/03/2020
6170

6170
REV. NO. DESCRIPTION Date
C1

C1
F1

F1
EMPLOYER:

Structural General Notes

- All dimensions in millimeters.


6170

6170
(All Footings are centered with columns UNO.) AL AIN CITY MUNICIPALITY
- No of floors = ONE FLOOR .

- Proposed Design Bearing capacity = 200 kN\m2


to be verified with the final soil investigation report that
C1

C1
F1

F1
must be done before execution start by the contractor.
OWNER:
- Foundation level is @ 1.00m below ZERO level, (as
6170

6170
per required excavation depth below EGL.),
DEPARTMENT OF
to be verified with the final soil investigation report that MUNICIPALITIES AND
must be done before execution start by the contractor.
TRANSPORT
AL AIN CITY MUNICIPALITY

C1
C1

F1
F1

- The Ground Water table is not given yet,


to be verified with the final soil investigation report that
must be done before execution start by the contractor.
6170

6170
CONSULTANT :
- The foundation ground shall be proof rolled with vibratory
compactor to confirm that any loose materials are compacted
to not less than 95% of max. dry density.
TECHNICAL ENGINEERING & SCIENTIFIC STUDIES Co. (Ltd)
C1

F1

C1
F1
-All Pre-cast Boundary Wall with (Admin AL AIN -TEL : 7629920 - P.O.BOX : 16420 - FAX :
7629906 ABU DHABI -TEL : 6313513 - FAX: 6313342
and Control Rooms) drawings,
are indicative to tendering purpose only, so, TESSCO
6170

6170
shop drawings and structural calculation
should be submitted by specialist sub-contractor to the
PROJECT NAME :
authorities approval before execution start at site.
REHABILITATION OF BOUNDARY
C1

F1

C1
F1
WALLS OF GRAVES IN AL AIN

ZONE :
6170

6170
AL HAYER

SECTOR NO : PLOT NO :
C1

C1
F1

F1
THE CONTRACTOR HAS TO CLOSE ANY GAP BETWEEN PRECAST PANEL BOTTOM AND GROUND LEVEL
WITH SOLID BLOCK TO BE FINISHED WITH BITUMINOUS MATERIAL AS PER SPECIFICATION 10 55-10-801-234

PROJECT DESCRIPTION :
6170

6170
REHABILITATION OF BOUNDARY
WALLS OF GRAVES IN AL AIN
C1

C1
F1

F1
6170

6170
DRAWING TITLE :

PROPOSED BOUNDARY WALL LAYOUT


C1

C1
F1

F1
6170

6170
DRAWING NO :
REVISION NO:
S-001
00
C1

C1
F1

F1
SUBMISSION DATE :
SCALE :
30/03/2020
1:150
6170

6170
PROJECT ID :
PLAN ID :
B2N-2019-006503
B2N-2019-006503
C1

C1
F1

F1
OFFICE USE ONLY :
SEE ADMIN & CONTROL ROOM DETAILS
DWG. S-003

CONNECTION BETWEEN

6395
6395

PRECAST PANEL & FOOTING


BY THE SPECIALIST
F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F1

F2
F2

C2 C1
C1 C1 C1 C1 C1 C1 C1 C1 C1 C2
C4 C3
F2

6044
6170 6170 6170 6170 6170 6020 500 4000 500 1250 5700 6085 6170 6170 6170 4401

PLOT LIMIT PLOT LIMIT

You might also like