Project Month: 6 I 12 !

18 I
Piping materials supply 70% piping
PSIDFD
IFR in-line In-line instr.
materials
e&IDsreviewPIDs instr. POs Vendor dwgs PLast
delivered
Prping Package IFC start
klasses Piping |Eqt Vendor
1" IFC
vendor PIDs Piping
Line >MIO IED Piping
SMTO dwgs P&IDS dwgs |fab.
Fluids Diagr. (General UG uEP)
list networks Pipe supports MTO
S0% up
Fire Piping isosdates
PR st
Plot rotection
Plan >Main cable
PO calcs dwgs Piping MTO
Piping studies IEC up-dates
PFDS Piping
HMB HIFR
routing PR
Isometrics
Piot Plan stress analysis found
Review IFC !
30% 60% 90%
Szed|T system model 3D MODELA model model
|Eqt set-up review,
list review review,

HX sizing Piping
Eqt Eqt Guide
IFD Piot IFC Plot Process |UG piping
& cable GADS
sizing drawings
Plan Plan str IFC trench IFC
Eqt Equipment GADs Final Equipment,
PDS Eqt
Equipment POs found packages and in-line
LEqt spec Eqt setting UFC instrument vendor
S-MSD MDS MR plan & loads dwgs
Eqt T8TS The il &Cin EgineKriny Guide, Editions Technip