Remaining per 15 Nov (Exclude SWTP)

Stok Site Stok Pabrik


Item Total Kebutuhan Ket. Kurang/Sisa D500 D600
per 15 Nov per 15 Nov UPPER
B C B C

B0 BM 15m 19 14 33 57 ‐24 RELEASED 4 53 18 3

B0 M 6m 1 2 3 0 TOTAL 57 21
Middle 6m+9m digabung jadi middle, utk 4 titik
B0 M 9m 3 2 5 0

B0 M 10m 0 0 0 0 Material Kurang:


1. B0 BM 15m : 24btg
D500 B0 M 11m 0 0 0 0
2. B0 M 13m : 23btg
B0 M 12m 0 0 0 0 3. C0 M 15m :5btg

B0 M 13m 2 0 2 57 ‐23

B0 M 15m 2 30 32 4 Sisa 28 btg, dipakai jadi Middle 0

C0 M 15m 35 13 48 53 ‐5

B0 BM 15m 22 63 85 21 64

B0 M 6m 0 0 0 0 0

B0 M 9m 18 0 18 0 18

B0 M 10m 0 0 0 0 0
Belum dikurangi kebutuhan untuk
D600 B0 M 11m 0 0 0 0 0
SWTP
B0 M 12m 3 3 6 3 3

B0 M 13m 5 12 17 0 17

B0 M 15m 119 0 119 36 Middle & Upper pakai B0 M 15m 83

C0 M 15m 2 1 3 3 0