2/28/24, 12:01 PM Aconex

4800000946 Document Control (WF-056653) 07-186101-4800000946-LAJ-HSE-PLN-000… 11:58 AM


LIMAK WORKFLOW TRANSMITTAL LMK-WTRAN-000424

Limak
Hafta Sokkak No:9 GOP
Ankara
Turkey 06700 Turkey

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Workflow Transmittal LMK-WTRAN-000424 LMK-WTRAN-000424

(WF-056653) 07-186101-4800000946-LAJ-HSE-PLN-000004 Neom Trojena Time


Travel Tunnel, Depot & Vault Excavation Propose : Fatigue Management Plan

From 4800000946 Document Control - Limak

To (3) Ms Ailyn Abela - Bechtel KSA (+2 more...)

Cc (18) Mr Keith Pallesen - Bechtel KSA (+17 more...)

Sent Wednesday, 28 February 2024 11:58:04 AM AST (GMT +03:00)

Reason IFA - Issued for Approval

Status N/A

DOCUMENT ATTACHMENTS (2)

(0 selected)

Revision
File Document No Revision Title Status
Date

Neom Trojena Time Travel Tunnel, Depot & Vault


07-186101-4800000946- Under
01 28/02/2024 Excavation Propose : Fatigue Management
LAJ-HSE-CRS-000004 Review
Plan_CRS

07-186101-4800000946- Neom Trojena Time Travel Tunnel, Depot & Vault Under
01 28/02/2024
LAJ-HSE-PLN-000004 Excavation Propose : Fatigue Management Plan Review

MESSAGE

Workflow Initiated - Action Required


The attached documents are part of the "07-186101-4800000946-LAJ-HSE-PLN-000004 Neom Trojena Time Travel Tunnel, Depot & Vault
Excavation Propose : Fatigue Management Plan" workflow.

Workflow Note

https://ksa1.aconex.com/hub/index.html 1/2
2/28/24, 12:01 PM Aconex

Notes for DCC to DCC submission


This Workflow is Document Control to Document Control Submission.

PMC DCC team will do the Quality Check of Document Number, Title, Revision, Discipline etc. if the submission is not complying with the
PMC/NEOM requirement, PMC DCC will provide QA-Rejected status and close the workflow without processing. Resubmission after QA-
Rejected will not affect Document Revision and it should be submitted same revision.

A Sub-workflow will be assigned by PMC (Bechtel) Document Management Team to the respective reviewers of PMC & NEOM.

No action required from the person who in the CC, you receive the copy to inform you that we have new submission and the relevant
person can start the review and wait for new workflow notification from Bechtel DCC team for Action.

Total two notifications Reviewer may receive for this workflow;


• First notification is this one, when documents submitted to PMC (Bechtel) for review
• Second notification when PMC close the workflow with final review outcome and comments.

Bechtel DCC will Select any of the following Outcome as per Lead Reviewer/Consolidator or NEOM recommendation.
A - Work May Proceed
B - Incorporate Comments - Proceed
C - Revise and Resubmit - Do Not Proceed
D - Rejected
E - Review Not Required - Proceed
F – QA Rejected

Note: Status “F - QA Rejected” shall be provided in following conditions:


• If the document or submittal does not comply with the document management requirement.
• If document/s are missing in the Submission/Workflow.
• If any error found in the Metadata (i.e. title, revision, type, discipline, contract, SO/WO, asset code, date, attachment, etc),

After QA Rejected, the resubmission of the document/s shall not affect/upgrade the revision number, and it should be submitted with the
same revision number.

Regards,
Bechtel Document Management Team - TROJENA

This mail was automatically generated.

https://ksa1.aconex.com/hub/index.html 2/2