Professional Documents
Culture Documents
Contract Document All Commends 01
Contract Document All Commends 01
Contract Document All Commends 01
IN WITNESS whereof the parties hereto have caused this Agreement to be executed the day and year
first before written in accordance with their respective laws.
For and on behalf of the Employer in the For and on behalf of the Contractor in the
presence of presence of PEB Steel BuildingsCo., LTD
Witness: Witness:
Name: Name:
Date: Date:
SIGNED by:
Witness:
Name:
Date:
Page 3 of 3
7th Floor, Menas Mall Saigon Airport, 60A Truong Son Street
Ward 2, Tan Binh District, Ho Chi Minh City, Vietnam
Tel : +84 28 38 475 475
2/ HIGH STRENGTH BOLTS A325 (DIN 8.8) INSTALLATION SHALL BE ASSURED BY THE FOLLOWING METHODS: A03 CROSS SECTION AT GL.C1, D1 & GL.C2 0 1
4. IT IS THE RESPONSIBILITY OF THE PURCHASER TO VERIFY ALL DESIGN
-TURN - OF - NUT
CRITERIA INCLUDING DEFLECTIONS AND NOTIFY SYSTEMS OF ANY -TORQUE WRENCH A04 CROSS SECTION AT GL.D2 0 1
DISCREPANCIES OR INCONSISTENCIES PRIOR TO RELEASE FOR
3/ ANCHOR BOLTS AND SHEAR BEARING CONNECTION OF HIGH STRENGTH BOLTS A05 CROSS SECTION AT GL.B1 & GL.E1 0 1
FABRICATION.
SHALL BE INSTALLED BY SNUG - TIGHTENED METHOD
A06 BOTTOM CHORD PLAN LEAVEL +18.550M 0 1
5. THE PURCHASER IS RESPONSIBLE FOR THE ACCURATE SETTING OF ANCHOR
A07 MEZZANINE PLANE LAVEL +21.500M 0 1
BOLTS AND ERECTION OF STEEL IN ACCORDANCE WITH CONSTRUCTION
DRAWINGS ONLY TEMPORARY SUPPORTS, GUYS, BRACES,FALSE WORK,
CRIBBING OR OTHER ELEMENTS REQUIRED FOR THE ERECTION OPERATION
WILL BE DETERMINED, FURNISHED AND INSTALLED BY THE PURCHASER.
If any trims need to be a different color please make note here. 1 01.08.2023 ISSUED FOR APPROVAL 01
d) THE SUPPLYING OF SEALED ENGINEERING DATA AND DRAWINGS FOR ROOF DEAD LOAD: N.A APPROVED WITHOUT CHANGES ISSUED FOR APPROVAL
0 01.06.2023 00
THE METAL BUILDING SYSTEM DOES NOT IMPLY OR CONSTITUTE AN No changes, proceed with fabrication
LIVE LOAD: N.A ON ROOF THIS SEAL IS INTENDED FOR
AGREEMENT THAT SYSTEMS OR ITS DESIGN ENGINEER IS ACTING AS N.A ON FRAME CERTIFACATION OF THE STRUCTURAL APPROVED AS NOTED (MAY INCLUDE CHANGE ORDER)
Fabrication may proceed on the basis of comments indicated. ADMINISTRATION
THE ENGINEER OF RECORD OR DESIGN PROFESSIONAL FOR A PURLIN SPACING: N.A DESIGN OF THE METAL BUILDING SYSTEM
CONSTRUCTION PROJECT. THESE DOCUMENTS ARE SEALED ONLY AS TO COLLATERAL LOAD: N.A AND COMPONENTS AS PROVIDED BY By signing below, I (We) have reviewed all of the information contained in the
VATANAC BREWERY
DESIGN. ANY OVERVIEW OF ALL OTHER approval drawings and have found it to be correct, accurate and consistent with
THE COMPONENTS FURNISHED BY SYSTEMS. WIND SPEED: 110 KM/H VATTANAC BREWERY PHNOM PENH
PORTIONS OF THE PROJECT ARE NOT my (our) intent and purpose. I (We) accept all of the purchaser responsibilities.
(3-SECOND GUST) I (We) further state the I (we) are authorized to provide acceptance on behalf of
BREWERY ADMINISTRATION BUILDING
WITHIN THE SCOPE OF THIS SEAL
e) ANY FIELD MODIFICATION OR ALTERATION, OR THE ATTACHMENT OF ANY EXPLOSURE: B the listed company. PHNOM PENH, CAMBODIA
EQUIPMENT OR COMPONENT TO SYSTEMS METAL BUILDING SYSTEMS, OCCUPANCY: II Reviewed by:
SPECIAL LOADS INDEX SHEET
ENCLOSURE: ENCLOSED
OR THE OMITTED INSTALLATION OF ANY SPECIFIED PARTS OR PIECES, Signature: Title:
RAINFALL : 200MM/H QB19457/23
WITHOUT THE EXPRESS WRITTEN APPROVAL OF SYSTEM SHALL VOID
SEISMIC : N.A Company:
ANY AND ALL WARRANTIES. P03126/23
IT IS THE RESPONSIBILITY OF THE PURCHASER TO VERIFY ALL DESIGN CRITERIA AND NOTIFY PEB Date:
OF ANY DISCREPANCIES OR INCONSISTENCIES PRIOR TO RELEASE FOR FABRICATION. B01 A00
IMPORTANT NOTES:
B
1. All dimensions are in mm unless noted otherwise.
2. The customer is responsible for accurate locations of
CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H
building lines and bench marks at the building site. B1 B1
A1
3. The slab or edge beam should be square and level to B1
G G G C G G D G G C G G G STRAIGHT ANCHOR BOLT DIMENSIONS
within 5mm tolerance. Anchor bolts should be set to the
E E1 M42
e) 6mm from the center of any anchor bolt group to the D2 M48
established column line through that group. E
10 11 B1 B E E1
C2 11a 11a
ADMINISTRATION
ANCHOR BOLT DETAIL A ANCHOR BOLT DETAIL A1 ANCHOR BOLT DETAIL A2 VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
ANCHOR BOLT DETAIL
QB19457/23
P03126/23
B01 AB2
B1 C 11a E1 C 11a
ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
ANCHOR BOLT DETAIL
QB19457/23
P03126/23
B01 AB3
10 11 B2 C2 D2 B B1 (*)
D2 & B2 12 13 E1 (*)
ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
ANCHOR BOLT DETAIL
QB19457/23
P03126/23
B01 AB4
11 & 12 B1 B2
A
B1 B2
12
10
VIEW B-B
B B
ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
ANCHOR BOLT DETAIL
QB19457/23
P03126/23
C C
12
10
VIEW B-B
B B
E E1
12
10
VIEW C-C
ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
ANCHOR BOLT DETAIL
QB19457/23
P03126/23
10 11
D1
C1
B B
VIEW B-B
DETAIL F1
VIEW A-A PMB NPH TMT VTT
ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
ANCHOR BOLT DETAIL
QB19457/23
P03126/23
C C
D1
C1
VIEW B-B
B B
13
D1
C1
VIEW C-C
DETAIL F2
VIEW A-A PMB NPH TMT VTT
ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
ANCHOR BOLT DETAIL
QB19457/23
P03126/23
B1 C1 D1 E1 A B
B1 C1 D1 E1 1 3 1 3 B1 C1
H1 H3 H1 H3
2
V1 V3 V1 V3 E1 D1
H2
2 4 2 4 H1
1
V2 H2 H4
H2 H4
1 3 Joist beam
H1 H3 V2 V4 V1
V2 V4
V1 V3
LOAD CASE
H1 V1 H2 V2 H3 V3 H4 V4 H1 V1
H1 V1 H2 V2 H3 V3 LOAD CASE
H1 V1 H2 V2 H3 V3 H4 V4 KN KN KN KN KN KN KN KN LOAD CASE
LOAD CASE KN KN KN KN KN KN KN KN KN KN
KN KN KN KN KN KN DEAD LOAD -171 352 0 4 0 377 0 4
DEAD LOAD -111 474 0 5 0 462 0 5 COLLATERAL -152 311 0 2 0 334 0 2 DEAD LOAD 0 29
DEAD LOAD 1 1 0 121 -1 1 COLLATERAL -97 417 0 4 0 408 0 4 WIND LEFT CASE 1 12 -22 0 0 0 -23 0 0 COLLATERAL 0 31
COLLATERAL -3 0 0 109 3 0 WIND LEFT CASE 1 8 -44 0 0 0 -40 0 0 WIND RIGHT CASE 1 11 -21 0 0 0 -22 0 0
WIND RIGHT CASE 1 7 -39 0 0 0 -40 0 0
LIVE MEZZANINE 0 7
WIND LEFT CASE 1 -1 0 0 -5 1 0 WIND LEFT CASE 2 7 -13 0 0 0 -14 0 0
WIND LEFT CASE 2 8 -28 0 0 0 -24 0 0
WIND RIGHT CASE 1 -1 0 0 -5 1 0 WIND RIGHT CASE 2 6 -12 0 0 0 -13 0 0
WIND RIGHT CASE 2 6 -23 0 0 0 -23 0 0
WIND LEFT CASE 2 -1 0 0 -3 1 0
WIND END CASE 1 16 -25 0 0 0 -26 0 0 Note:
WIND END CASE 1 4 -45 0 0 0 -46 0 0 WIND END CASE 2 7 -16 0 0 0 -16 0 0
WIND RIGHT CASE 2 0 0 0 -3 0 0 WIND END CASE 2 2 -28 0 0 0 -29 0 0 Self-weight of finish floor is included in Collateral Load
LIVE MEZZANINE -34 69 0 0 0 74 0 0
WIND END CASE 1 -1 0 0 -5 1 0 LIVE MEZZANINE -22 93 0 1 0 91 0 1 T1 (TEMPERATURE) -22 0 0 0 0 0 0 0 T1 is Negative Temperature Load
T1 (TEMPERATURE) -30 0 0 0 0 -1 0 0 T2 (TEMPERATURE) 22 0 0 0 0 0 0 0 T2 is Positive Temperature Load
WIND END CASE 2 0 0 0 -3 0 0 T2 (TEMPERATURE) 30 0 0 0 0 1 0 0
LIVE MEZZANINE -1 0 0 24 1 0
T1 (TEMPERATURE) -24 0 0 1 24 0 Note:
T2 (TEMPERATURE) 24 0 0 -1 -24 0
Note: Self-weight of finish floor is included in Collateral Load
Note: Self-weight of finish floor is included in Collateral Load T1 is Negative Temperature Load
Self-weight of finish floor is included in Collateral Load T1 is Negative Temperature Load T2 is Positive Temperature Load
T1 is Negative Temperature Load T2 is Positive Temperature Load
T2 is Positive Temperature Load
10 11 11a 12 13
10 11 11a 12 13 10 11 11a 12 13
1 2 H1
1 H2
2
H2 2 H1 H2
V2
V1 V2 V1 V2
H1
1 H3
3
V1 V3
H1 V1 H2 V2 H1 V1 H2 V2
LOAD CASE LOAD CASE
KN KN KN KN KN KN KN KN
DEAD LOAD 74 50 -54 46 DEAD LOAD 128 19 -95 46
H1 V1 H2 V2 H3 V3
LOAD CASE
KN KN KN KN KN KN COLLATERAL 67 52 -49 49 COLLATERAL 112 18 -84 45
DEAD LOAD -41 3 0 201 41 3 WIND LEFT CASE 1 -3 1 2 1 WIND LEFT CASE 1 -9 0 6 0
COLLATERAL -30 1 0 191 30 1
WIND RIGHT CASE 1 -5 1 4 1 WIND RIGHT CASE 1 -8 0 6 0
WIND LEFT CASE 1 3 0 0 -22 -3 0
WIND RIGHT CASE 1 3 0 0 -21 -3 0 WIND LEFT CASE 2 -2 0 1 0 WIND LEFT CASE 2 -5 0 4 0
WIND LEFT CASE 2 2 0 0 -13 -2 0 WIND RIGHT CASE 2 -4 0 3 0 WIND RIGHT CASE 2 -5 0 3 0
WIND RIGHT CASE 2 2 0 0 -12 -2 0
WIND END CASE 1 -4 1 2 1 WIND END CASE 1 -9 0 8 0
WIND END CASE 1 4 0 0 -25 -4 0
WIND END CASE 2 -3 0 1 0 WIND END CASE 2 -7 0 2 0
WIND END CASE 2 2 0 0 -16 -2 0 PMB NPH TMT VTT
LIVE MEZZANINE -7 0 0 42 7 0 LIVE MEZZANINE 15 12 -11 11 LIVE MEZZANINE 25 4 -19 10 1 01.08.2023 ISSUED FOR APPROVAL 01
T1 (TEMPERATURE) -42 0 0 2 42 0 T1 (TEMPERATURE) -22 0 22 0 T1 (TEMPERATURE) -19 0 29 0 0 01.06.2023 ISSUED FOR APPROVAL 00
T2 (TEMPERATURE) 42 0 0 -2 -42 0
T2 (TEMPERATURE) 22 0 -22 0 T2 (TEMPERATURE) 19 0 -29 0
Note: Note: Note: ADMINISTRATION
Self-weight of finish floor is included in Collateral Load Self-weight of finish floor is included in Collateral Load Self-weight of finish floor is included in Collateral Load
VATANAC BREWERY
T1 is Negative Temperature Load T1 is Negative Temperature Load T1 is Negative Temperature Load
T2 is Positive Temperature Load T2 is Positive Temperature Load T2 is Positive Temperature Load VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
COLUMN REACTION
QB19457/23
P03126/23
B01 AB6
B1 C C1 C2 D D1 E E1
S1a
S1 S1 S1 S1
S3 S3
S3 S3
ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
B1 B2 C C1 C2 D D1 D2 E E1
QB19457/23
P03126/23
B01 A01
S1 S1 S1 S1
S2
S2
S1 S1 S1 S1
B1 B2 C C1 C2 D D1 D2 E E1
S1a
S1 S1 S1 S1
S3 S3
S3 S3
ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
B1 B2 C C1 C2 D D1 D2 E E1
CROSS SECTION AT GL.11a & GL.12
P03126/23
B01 A02
S1 S1 S1
S1 S1
S1 S1c S7
S1
10 11 11a 12 13
S4
ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
CROSS SECTION AT GL.C1, D1 & GL.C2
10 11 11a 12 13 QB19457/23
CROSS SECTION AT GL.C2 P03126/23
B01 A03
10 11 11a 12 13
ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
QB19457/23
CROSS SECTION AT GL.D2
P03126/23
B01 A04
S5
10 11 11a 12 13
ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
CROSS SECTION AT GL.B1 & GL.E1
QB19457/23
P03126/23
MB
B1
B2
MB
MB
MB
C
MB MB MB MB
C1
MB
MB
MB
MB
MB MB
C2
D
MB MB MB MB
D1
MB
MB
MB
D2
E
MB MB
E1
F ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
10 11 11a 12 13
BOTTOM CHORD PLAN LEAVEL +18.550M
BOTTOM CHORD PLANE LEVEL +18.550M QB19457/23
P03126/23
B01 A06
B
CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H
B1
MB
MB
JB
JB
JB
JB
JB
JB
JB
JB
JB
JB
MB
CONC. BEAM 700Wx1000H
JB
JB
JB
JB
JB
JB
JB
JB
JB
MEZZANINE DESIGN SUMMARY
MB MB MB MB Mezzanine Live Load 1.0 kN/m²
C1 Dead Load (Excluding Joists & Beams) 4.16 kN/m²
Additional Load (Collateral Load) 4.5 kN/m²
MB
MB
MB
Total Load (Excluding Joists & beams) 9.66 kN/m²
Decking 1mm Peb Deck 76mm By PEB
CONC. BEAM 700Wx1000H
JB
JB
JB
JB
JB
JB
JB
JB
JB
BEAM SIZE STD. END CONNECTION REMARKS
MB: REFER CROSS SECTION
MB MB MB MB JB W.300x5; F.150x5 3M24HSB; KNIFE 10mm NA
C2
D
JB
JB
JB
JB
JB
JB
JB
JB
JB
JB
MB MB MB MB
D1
MB
MB
MB
CONC. BEAM 700Wx1000H
JB
JB
JB
JB
JB
JB
JB
JB
JB
MB MB MB MB
D2
E
MB
MB
MB
JB
JB
JB
JB
JB
JB
JB
JB
JB
JB
E1
CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H
F ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
10 10a 10b 10c 11 11c 11b 11a 11d 11e 12 12a 12b 12c 13
MEZZANINE PLANE LAVEL +21.500M
MEZZANINE PLANE LEVEL +21.500M QB19457/23
P03126/23
B01 A07
DRAWING INDEX
REV 01
01 COLUMN LAYOUT PLAN
02 MEZZANINE LAYOUT
03 CROSS SECTION
04 ROOF SHEETING PLAN
PROPOSAL DRAWING(PPD)
NOTE: NOT FOR CONSTRUCTION
2950
A
440 5440 5440 5440 5430 580
22770
OUT TO OUT OF STEEL BEAM
1a 1 2 3 4 5 5a
B
2950
A
5440 5440 5440 5430
21750
CENTER TO CENTER OF STEEL COLUMN
1 2 3 4 5
2/F PART PLAN-FOOTBRIDGE ROOF LEVEL
L
T2 T1 L1 APPLICABLE CODES IN PEB STEEL QUOTE NO. : QB19457-23
1. IBC - 2009 4. AISI - 2007
2. MBMA - 2010 5. AWS D1.1/D1.1M : 2008 REV. NO. : 01
Pipe D
DxP
3. AISC - 2005
PROJECTION MIN 5MM
(OR 2 THREAD PICH)
TACK WELD @3POINT SAB
H (MIN 12xD)
W N
PRO NOTE:
BLDG. NO. : B02
STRAIGHT ANCHOR BOLT DIMENSIONS
A. Wind speed : 110 BLDG. NAME :
PLASTIC CAP b. Live load on Roof : 0.57KN/M2
QTY. SYM. SIZE
COMPONENT
ID
DxP
THREAD PICH
T1
(mm)
T2
(mm)
L
(mm)
PRO
(mm)
Pipe D
(mm)
L1
(mm)
c. Live load on Purlin : 0.57KN/M2 ADMINISTRATION BUIDING
(mm) d. Live load on Frame : 0.3KN/M2
e. Rainfall : 200
- M20 SAB:20 M20 x 2.5 125 30 450 80 Ø49 80
f. Mezzanine Live load : 6.4KN/m2
CUSTOMER : VATTANAC BERWERY
- M24 SAB:24 M24 x 3 145 35 510 95 Ø60 90
- M30 SAB:30 M30 x 3.5 165 40 630 110 Ø76 100
g. Dead load (Excluding Joists & Beams : 1KN/m2 LOCATION : PHNOM PENH, CAMBODIA
- M36 SAB:36 M36 x 4 190 45 750 130 Ø90 120 h. Additional Load (Collateral Load) : N/A KN/m2
- M42 SAB:42 M42 x 4.5 230 55 870 160 Ø110 140 i. All dimensions are in millimeter. DRN. BY DATE CHK. BY CONFIRMED DATE SHEET NO.
- M48 SAB:48 M48 x 5 260 60 980 180 Ø110 150 j. This is a proposal drawing only, not for construction.
STRAIGHT ANCHOR BOLT DETAIL HCH 03-Aug-2023 VDA VDA 03-Aug-2023 1
301
CENTER TO CENTER OF STEEL COLUMN
B
2950
A
440 5440 5440 5440 5430 580
22770
OUT TO OUT OF STEEL BEAM
1a 1 2 3 4 5 5a
CONCRETE SLAB
(BY OTHER)
PEBDECK SCREW CONCRETE.(BY OTHERS) QUOTE NO. : QB19457-23
ANGLE
CONCRETE SLAB CONCRETE STOPPER
(BY OTHER) REV. NO. : 01
BLDG. NO. : B02
BEAM
BEAM
BLDG. NAME :
MEZZ. BEAM MEZZ. BEAM MEZZ. BEAM MEZZ. BEAM JA2
ADMINISTRATION BUIDING
CUSTOMER : VATTANAC BERWERY
(4+4)M20 HSB (4+4)M20 HSB
COLUMN
PL-16MMTHK. COLUMN
PL-16mmTHK. LOCATION : PHNOM PENH, CAMBODIA
DRN. BY DATE CHK. BY CONFIRMED DATE SHEET NO.
DETAIL DETAIL DETAIL DETAIL DETAIL CONNECTION JB & MB HCH 03-Aug-2023 VDA VDA 03-Aug-2023 2
Roof panel: Lock-Seam 0.50mm Thnk.
755
1000
700
305
600
600
700
900
1a 1 2 3 4 5 5a
SIDE WALL AT GL.A
2950
B A
ENDWALL AT GL.1
B
2950
A
5440 5440 5440 5430
21750
CENTER TO CENTER OF STEEL COLUMN
1 2 3 4 5
ROOF LAYOUT PLAN
470
ROD REV. NO. : 01
HILLSIDE WASHER RAFTER/COLUMN
BLDG. NO. : B02
65
66
Hot rolled sections and built up sections are designed in accordance with:
updated design
1989/2005 Manual of Steel Construction – Allowable Stress Design (AISC)
Material Specifications
Minimum yield
No Components Specifications Applicable Design Code
strength
Built –up ASTM A572-Gr50 Fy = 34.5 AISC - American Institute of Steel
1
(Plates) (or equivalent) <20mm kN/cm2 Construction - Latest Edition
JIS G3101-SS400 AISC - American Institute of Steel
Angles Fy = 24.5 kN/cm2
(or equivalent) Construction - Latest Edition
2 Hot Rolled
JIS G3101-SS400 AISC - American Institute of Steel
Beams Fy = 24.5 kN/cm2
(or equivalent) Construction - Latest Edition
Cold Form Galvanized AS 1397 Fy = 45.0 AISI - American Iron & Steel
3
≤ (Z275) ≤ (Z275) (or equivalent) kN/cm2 Institute - 2001 Edition
Ft = 30.3 kN/cm2
High strength Bolts ASTM A325 Type 1 AISC - American Institute of Steel
10 Fu = 72 to 83
(Galvanized) (or equivalent) Construction - Latest Edition
kN/cm2
Machine Bolts DIN 933- Grade 4.6 Ft = 13.8 kN/cm2 AISC - American Institute of Steel
11 2
(Galvanized) (or equivalent) Fu = 41.0 kN/cm Construction - Latest Edition
VBL BREWERY ADMIN BLOCK
(PACKAGE: STEEL STRUCTURE ROOF) POST TENDER ADDENDUM 01
Where become applicable, any design responsibility shall include the following factors:
a) Code and practice and/or local market practice; in case of discrepancies, the most stringent
requirements shall prevail
b) Safety during the construction and after handover.
c) All temporary works required for to complete the works.
The contract rate and price shall deemed to be conclusive, inclusive of all labor, material, plants, tools,
equipment, testing, haulage, carting, cutting cost, handling, assembling, fixing, trimming, fixed to
position, hoisting, transport, loading and unloading, working space, ancillary works, temporary works,
temporary protection, material indispensably, cleaning, attendance cost, overhead cost, profit, tax and all
necessary works for the satisfactory completion of the works and including maintenance cost during
Defect Notification Period and providing necessary warranty. The Contractor to refer preambles for full
listing.
a) All wastage
b) All lapping, joint length and overlap length
c) All construction joint, expansion joint and other similar movement joint
d) All cost associated to built concrete kicker and water stop
e) All cutting
f) Working space cutting work, fabrication, cut to profile, trimming, chamfering, splayed, bullnose,
Pls remove
rebate, fixed to position including drilling, putty, mortar infill, etc.
g) Fire proof certificate for fire resistance items.
h) Work around opening, drain and curve/edge surface
i) All bracket, suspension system, rod, hanger, clip and other accessories complete with anti-rust
j) All steel to be coated with anti-rust coating
k) Any extra quantity/work due to termination works, cable pulling, etc
l) If not described, the works shall include testing commissioning
m) All profit and overhead in relation to material
All material and temporary material (except for tools, machinery, plant, site office, workers camp and
administrative equipment for site staff and worker) including wastage shall belong to the Employer.
The contract rate and price shall not subject to any fluctuation.
B.4 / 2 of 10
and labour employed on the site from insect and pest nuisance, and to reduce their
danger to health. The contractor shall provide suitable prophylactics for the
Contractor’s Personnel and shall comply with all the regulations of the local health
authorities, including use of appropriate insecticide.”
“The Contractor shall submit samples and relevant information of all major Materials
intended for incorporation into the works to the Engineer for Consent prior to using
the Materials in or for the Works.
Each sample shall be labelled as to origin and intended use in the Works. Samples
shall become the property of the Employer.”
Sub-Clause 7.4
7.6Remedial Work
At the end of sub-clause 7.6, insert the following paragraph:
“At his sole discretion, the Engineer may retain any plant, Materials or work which is
not in accordance with the Contract, in which case and adjustment shall be included
in the Contract Price commensurate with the reduced value to the employer of the
defective plant, materials and work.
In determining this adjustment, the Engineer shall proceed in accordance with sub-
clause 3.5 [Determinations].”
“The parties agree that, for the purpose of effective transfer of title of any item of
plant and Materials to the employer, the employer shall have control or be deemed
to have control over the item of plant and/or materials upon the occurrence of either
of the events in sub-paragraph (a) or (b) above”.
Delete the first paragraph of Sub-Clause 8.1 and substitute with the following:
Page 11 of 25