Vattanac Brewery Ltd

No 66, Preah Monivong Blvd


Sangkat Wat Phnom
Khan Daun Penh
Phnom Penh, Kingdom of Cambodia

T (855) 023 938 888 Ext 1183

IN WITNESS whereof the parties hereto have caused this Agreement to be executed the day and year
first before written in accordance with their respective laws.

SIGNED by: SIGNED by:

Sam Ang Vattanac Print:

For and on behalf of the Employer in the For and on behalf of the Contractor in the
presence of presence of PEB Steel BuildingsCo., LTD

Witness: Witness:

Name: Name:

Date: Date:

SIGNED by:

For and on behalf of the Employer in the


presence of P.E.B-KH Construction Co., Ltd

Witness:

Name:

Date:

Page 3 of 3
7th Floor, Menas Mall Saigon Airport, 60A Truong Son Street
Ward 2, Tan Binh District, Ho Chi Minh City, Vietnam
Tel : +84 28 38 475 475

Must replace the latest drawing!

ISSUED FOR APPROVAL

CUSTOMER : VATANAC BREWERY


PROJECT : VATTANAC BREWERY PHNOM PENH BREWERY ADMINISTRATION BUILDING
LOCATION : PHNOM PENH, CAMBODIA
BLDG. NAME : ADMINISTRATION
BLDG. N0. : B01
8. ALL TECHNICAL DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS, DESIGNS, INSTRUCTIONS DRAWING INDEX
PURCHASER RESPONSIBILITIES PROVIDED BY PEB STEEL BUILDINGS CO. LTD. (“PEB”) ARE INTELLECTUAL PROPERTIES OF PEB THAT
NO PARTIES MAY AT THEIR OWN DISCRETION USE IN ANY MANNER. ANY USE, INCLUDING BUT NOT LIMITED DRG. TITLE
TO REPRODUCTION, DISTRIBUTION, FABRICATION, WITHOUT WRITTEN AUTHORIZATION FROM PEB SHALL STRICTLY FACE
LEGAL CONSEQUENCES. A00 INDEX SHEET 0 1
1. IT IS THE RESPONSIBILITY OF THE PURCHASER TO INSURE THAT ALL
PROJECT PLANS, SPECIFICATIONS, AND APPLIED DESIGN LOADS, FULLY MATERIALS ASTM DESIGNATIONS AB1 ANCHOR BOLT PLAN 0 1
MEET THE PROPOSED INTENT AS WELL AS COMPLY WITH ALL APPLICABLE AB2 ANCHOR BOLT DETAIL 0 1
BUILT-UP (PLATES) ASTM A-572 GRADE 50 (OR EQUI.) Fy = 34.5 kN/cm²
REQUIREMENTS OF ANY GOVERNING AUTHORITIES. AND TO OBTAIN THE HOT ROLLED SECTION Fy = 24.5 kN/cm²
JIS G3101-SS400 (OR EQUI.)
APPROPRIATE APPROVALS AND/OR PERMITS AS MAY BE REQUIRED FROM AB3 ANCHOR BOLT DETAIL 0 1
COLD FORM NSDC570/NSDH540/ K18 (OR EQUI.) Fy = 45.0 kN/cm²
CITY, COUNTY, STATE, OR FEDERAL AGENCIES. COLD FORM AS 1397 (OR EQUI.) Fy = 45.0 kN/cm² AB4 ANCHOR BOLT DETAIL 0 1
ROOF PANEL/ WALL PANEL ASTM A792 Gr.50-JIS G3321 AZ150(OR EQUI.) Fy = 34.5 kN/cm²
2. IT IS THE RESPONSIBILITY OF THE PURCHASER TO COMPLETELY Fy = 34.5 kN/cm² AB5 ANCHOR BOLT DETAIL 0 1
ROOF PANEL/ WALL PANEL ASTM A755/A792 Gr.50-JIS G3322 AZ150 (OR EQUI.)
UNDERSTAND WHAT IS INCLUDING OR EXCLUDING FROM ARCHITECTURAL CABLE BRACING EN12385 (OR EQUI.) Fu = 157 kN/cm² AB5a ANCHOR BOLT DETAIL - 0
PLANS AND/OR SPECIFICATIONS. ANCHOR BOLTS JIS G3101-SS400 (OR EQUI.) Fu = 40.0 kN/cm²
ANCHOR BOLTS ISO 898-1 PROPERTY CLASS 8.8 METRIC BOLT HEAD MARKING Fu = 72.0 kN/cm² AB5b ANCHOR BOLT DETAIL - 0
3. IT IS THE RESPONSIBILITY OF THE PURCHASER FOR OVERALL PROJECT HIGH STRENGTH BOLTS (for primary structure) DIN 933/931 GRADE 8.8 (OR EQUI) Fu = 80.0 kN/cm²
AB5c ANCHOR BOLT DETAIL - 0
COORDINATION, INTERFACE, COMPATIBILITY, AND DESIGN CONCERNING ANY MACHINE BOLTS (for secondary structure) DIN 6921- Grade 4.6 (OR EQUI.) Ft = 13.8 kN/cm², Fu = 41.0 kN/cm²
MATERIALS NOT FURNISHED BY WITH THE SYSTEM TO BE FURNISHED BY AB5d ANCHOR BOLT DETAIL - 0
GENERAL NOTES
SYSTEMS. THE SPECIFIC DESIGN CRITERIA CONCERNING THIS INTERFACE AB6 COLUMN REACTION 0 1
BOLT TIGHTENING REQUIREMENTS:
BETWEEN MATERIALS MUST BE FURNISHED BY THE PURCHASER PRIOR TO
A01 CROSS SECTION AT GL.10 & GL.11 0 1
RELEASE FOR FABRICATION, OR THE DESIGN ASSUMPTIONS OF SYSTEMS 1/ IT IS THE ERECTOR'S RESPONSIBILITY TO INSPECT THE TYPE OF BOLT ACCORDING TO THE DRAWINGS
WILL GOVERN. DESIGNATE BEFORE INSTALLATION A02 CROSS SECTION AT GL.11a & GL.12 0 1

2/ HIGH STRENGTH BOLTS A325 (DIN 8.8) INSTALLATION SHALL BE ASSURED BY THE FOLLOWING METHODS: A03 CROSS SECTION AT GL.C1, D1 & GL.C2 0 1
4. IT IS THE RESPONSIBILITY OF THE PURCHASER TO VERIFY ALL DESIGN
-TURN - OF - NUT
CRITERIA INCLUDING DEFLECTIONS AND NOTIFY SYSTEMS OF ANY -TORQUE WRENCH A04 CROSS SECTION AT GL.D2 0 1
DISCREPANCIES OR INCONSISTENCIES PRIOR TO RELEASE FOR
3/ ANCHOR BOLTS AND SHEAR BEARING CONNECTION OF HIGH STRENGTH BOLTS A05 CROSS SECTION AT GL.B1 & GL.E1 0 1
FABRICATION.
SHALL BE INSTALLED BY SNUG - TIGHTENED METHOD
A06 BOTTOM CHORD PLAN LEAVEL +18.550M 0 1
5. THE PURCHASER IS RESPONSIBLE FOR THE ACCURATE SETTING OF ANCHOR
A07 MEZZANINE PLANE LAVEL +21.500M 0 1
BOLTS AND ERECTION OF STEEL IN ACCORDANCE WITH CONSTRUCTION
DRAWINGS ONLY TEMPORARY SUPPORTS, GUYS, BRACES,FALSE WORK,
CRIBBING OR OTHER ELEMENTS REQUIRED FOR THE ERECTION OPERATION
WILL BE DETERMINED, FURNISHED AND INSTALLED BY THE PURCHASER.

6. THE PURCHASER IS RESPONSIBLE FOR ALL AFFECTS THAT MAY BE


IMPOSED ON FACILITIES, LANDS, ROADS, BUILDINGS, ETC.. LOCATED WITHIN
THE PROXIMITY OF THE NEW STRUCTURE, BY THE NEW STRUCTURE,
AFFECTS INCLUDE BUT ARE NOT LIMITED TO SNOW SLIDING, OR DRIFTING,
AND WIND LOADING, SHEDDING, OR VORTEX ACTION.
ENGINEERING CALCULATIONS SUBMITTAL FOR APPROVAL
7. UNLESS SPECIFICALLY STATED OTHERWISE WITHIN SYSTEMS BUILDING CODE: DATE:
IBC-2018 01.08.2023
"PURCHASE OFFER", THE FOLLOWING SHALL GOVERN:
MBMA - 2012 DESIGNED BY: Sent on: SUBMITTAL FOR APPROVAL
DESIGN CODES: NPH
a) IN CASE OF DISCREPANCIES BETWEEN SYSTEMS STRUCTURAL STEEL In order to schedule this project in the most efficient manner, return
AISI - 2001 CHECKED BY: these drawings marked in RED with your comments WITHIN TWO WEEKS
DRAWINGS AND PLANS FOR OTHER TRADES, THE STRUCTURAL STEEL AISC 360-16 from the above mentioned date WITH COLORS OF SHEETING AND TRIM
TMT
DRAWINGS SHALL GOVERN. AWS - 2015
Any changes made AFTER approval of these drawings will delay the fabrication
DESIGN PARAMETERS ENGINEER'S SEAL and delivery process.
b) SYSTEMS QUALITY CRITERIA, STANDARD PRACTICE, METHODS AND AREA#01 Please supply colors for the sheeting and trim:
TOLERANCES. FRAME TYPE: SEE DWG. ROOF SHEETING: N.A.
ROOF SLOPE: SEE DWG. WALL SHEETING: N.A.
c) WHEN WINDOW AND/OR DOOR OPENINGS HAVE A COMBINED AREA EAVE GUTTER AND DOWNSPOUT: N.A
BAY SPACING: 1@9.025+1@14.1+1@8.725 (M)
INSULATION: N.A.
GREATER THAN 15% OF GROSS WALL AREA ON ANY WALL, AND THE BUILDING WIDTH: 28.13M (CENTER TO CENTER OF RC COLUMNS) LINER: N.A.
BUILDING IS DESIGNED AS "ENCLOSED", THEN THE WINDOWS AND OR LENGTH : 31.85M (OFFSET 0.5M FROM OUT TO CENTER OF RC COLUMNS) SOFFIT: N.A.
DOORS REPRESENTING THE EXCESS ABOVE 15% SHALL BE DESIGNED HEIGHT: 21.5M (TOP OF MEZZANINE) FACADE: N.A.
AND DETAILED FOR APPLICABLE LOADING, BY THE PURCHASER. TRIM: TBE
DESIGN LOADS Trims will be supplied according to the color listed above. PMB NPH TMT VTT

If any trims need to be a different color please make note here. 1 01.08.2023 ISSUED FOR APPROVAL 01
d) THE SUPPLYING OF SEALED ENGINEERING DATA AND DRAWINGS FOR ROOF DEAD LOAD: N.A APPROVED WITHOUT CHANGES ISSUED FOR APPROVAL
0 01.06.2023 00
THE METAL BUILDING SYSTEM DOES NOT IMPLY OR CONSTITUTE AN No changes, proceed with fabrication
LIVE LOAD: N.A ON ROOF THIS SEAL IS INTENDED FOR
AGREEMENT THAT SYSTEMS OR ITS DESIGN ENGINEER IS ACTING AS N.A ON FRAME CERTIFACATION OF THE STRUCTURAL APPROVED AS NOTED (MAY INCLUDE CHANGE ORDER)
Fabrication may proceed on the basis of comments indicated. ADMINISTRATION
THE ENGINEER OF RECORD OR DESIGN PROFESSIONAL FOR A PURLIN SPACING: N.A DESIGN OF THE METAL BUILDING SYSTEM
CONSTRUCTION PROJECT. THESE DOCUMENTS ARE SEALED ONLY AS TO COLLATERAL LOAD: N.A AND COMPONENTS AS PROVIDED BY By signing below, I (We) have reviewed all of the information contained in the
VATANAC BREWERY
DESIGN. ANY OVERVIEW OF ALL OTHER approval drawings and have found it to be correct, accurate and consistent with
THE COMPONENTS FURNISHED BY SYSTEMS. WIND SPEED: 110 KM/H VATTANAC BREWERY PHNOM PENH
PORTIONS OF THE PROJECT ARE NOT my (our) intent and purpose. I (We) accept all of the purchaser responsibilities.
(3-SECOND GUST) I (We) further state the I (we) are authorized to provide acceptance on behalf of
BREWERY ADMINISTRATION BUILDING
WITHIN THE SCOPE OF THIS SEAL
e) ANY FIELD MODIFICATION OR ALTERATION, OR THE ATTACHMENT OF ANY EXPLOSURE: B the listed company. PHNOM PENH, CAMBODIA
EQUIPMENT OR COMPONENT TO SYSTEMS METAL BUILDING SYSTEMS, OCCUPANCY: II Reviewed by:
SPECIAL LOADS INDEX SHEET
ENCLOSURE: ENCLOSED
OR THE OMITTED INSTALLATION OF ANY SPECIFIED PARTS OR PIECES, Signature: Title:
RAINFALL : 200MM/H QB19457/23
WITHOUT THE EXPRESS WRITTEN APPROVAL OF SYSTEM SHALL VOID
SEISMIC : N.A Company:
ANY AND ALL WARRANTIES. P03126/23
IT IS THE RESPONSIBILITY OF THE PURCHASER TO VERIFY ALL DESIGN CRITERIA AND NOTIFY PEB Date:
OF ANY DISCREPANCIES OR INCONSISTENCIES PRIOR TO RELEASE FOR FABRICATION. B01 A00
IMPORTANT NOTES:
B
1. All dimensions are in mm unless noted otherwise.
2. The customer is responsible for accurate locations of
CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H
building lines and bench marks at the building site. B1 B1
A1
3. The slab or edge beam should be square and level to B1
G G G C G G D G G C G G G STRAIGHT ANCHOR BOLT DIMENSIONS
within 5mm tolerance. Anchor bolts should be set to the

CONC. BEAM 700Wx1000H


given dimensions and projection, with maximum deviation

CONC. BEAM 800Wx1000H


QTY. SYM. SIZE
of 5mm. Anchor bolt threads should be protected during
concreting operation, or thoroughly cleaned after pouring. M20
E E1
All templates should be removed. B2 M24
M30
4. PEB Steel assumes no responsibility or liability for the C
M36
column foundations, slab design or construction.
M42
Foundations should be designed as a minimum for the
M48
given reaction loads.
F1 F2
5. The installation of anchor bolts and embedded items must C1 STRAIGHT ANCHOR BOLT GRADE 4.6 DETAIL
be done in accordance with the code of Standard Practice B

CONC. BEAM 800Wx1000H


for Steel Buildings of AISC section 7. Anchor bolts and

CONC. BEAM 700Wx1000H


foundation bolts shall be set by the owner (or his civil
contractor) in accordance with PEB Steel "Issued for
Construction Anchor Bolt Plan". Maximum allowable A E F
tolerances are as follows : C2
D
a) 3mm center to center of any two within an anchor bolt
group. STRAIGHT ANCHOR BOLT DIMENSIONS
B
b) 6mm center to center of adjacent bolt groups. QTY. SYM. SIZE
D1
F1 F2
c) Elevation of the top of anchor bolts +/- 12mm. M20
M24
d) Maximum accumulation of 6mm per 30 meters along
CONC. BEAM 700Wx1000H

the established column line of multiple anchor bolt M30

CONC. BEAM 800Wx1000H


groups but not to exceed a total of 25mm M36

E E1 M42
e) 6mm from the center of any anchor bolt group to the D2 M48
established column line through that group. E

f) The tolerances of paragraphs b, c and d apply to to


STRAIGHT ANCHOR BOLT GRADE 8.8 DETAIL
apply to offset dimensions shown on the plans,
NOTE :
measured parallel and perpendicular to the nearest
MINIMUM CONCRETE COMPRESSIVE
established column line for individual columns shown on G1 G1 G1 C1 G1 G1 D1 G1 G1 C1 G1 G1 G1 STRENGTH: F'C=3.0kN/cm2
the plans to be offset from established column line. E1
B2 A2
B2
6. PEB STEEL LTD(PEBSL) assumes structures. When CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H

required for calculations, no responsibility or liability for


the existing concrete PEB will assume concrete strength of
f'c=3500 psi.
F
7. Before commencing the erection of this building the
erector must read the PEB Erection Manual.

8. In case of descrepancies between PEB Steel structural


steel plans or other trades, PEB Steel plans govern.
10 10a 10b 10c 11 11c 11b 11a 11d 11e 12 12a 12b 12c 13
(AISC 360-16)

9. It is important to check that the drawing revision number


ANCHOR BOLT PLAN
shown on each sheet matches with revision in the drawing
transmittal for the same sheet. PEB Steel keeps a master
list showing the latest revision number and date for each
PMB NPH TMT VTT
engineering document issued. In case you have any doubt
1 01.08.2023 ISSUED FOR APPROVAL 01
whether you have the latest revision, you should clear it
0 01.06.2023 ISSUED FOR APPROVAL 00
out by contacting our CUSTOMER SERVICE MANAGER at
our head office/plant Tel.Nos.028-38 475 475 or the PEB
ADMINISTRATION
Steel's Area office nearest to you.
VATANAC BREWERY
10. Building must be erected in strict accordance with PEB
VATTANAC BREWERY PHNOM PENH
Steel drawings Any deviation must have prior approval BREWERY ADMINISTRATION BUILDING
from PEB Steel.
PHNOM PENH, CAMBODIA
11. PEB Steel will not accept responsibility for any variations ANCHOR BOLT PLAN
or omissions which do not have their written consent.
QB19457/23
12. PEB steel has right to suggest the connetion which is
different than the one show in approval drawing for easy P03126/23
to transportation, fabrication, erection
B01 AB1
D1 D 12 11
C1 C2 10 11 11 12 B1 B

ANCHOR BOLT DETAIL B ANCHOR BOLT DETAIL B1

10 11 B1 B E E1

C2 11a 11a

PMB NPH TMT VTT

1 01.08.2023 ISSUED FOR APPROVAL 01

0 01.06.2023 ISSUED FOR APPROVAL 00

ADMINISTRATION
ANCHOR BOLT DETAIL A ANCHOR BOLT DETAIL A1 ANCHOR BOLT DETAIL A2 VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
ANCHOR BOLT DETAIL

QB19457/23

P03126/23

B01 AB2
B1 C 11a E1 C 11a

ANCHOR BOLT DETAIL D ANCHOR BOLT DETAIL D1


12 11
11 12 E E1 D2 & B2 12 13

ANCHOR BOLT DETAIL B2 ANCHOR BOLT DETAIL E1

PMB NPH TMT VTT

1 01.08.2023 ISSUED FOR APPROVAL 01

0 01.06.2023 ISSUED FOR APPROVAL 00

ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
ANCHOR BOLT DETAIL

QB19457/23

P03126/23

B01 AB3
10 11 B2 C2 D2 B B1 (*)

ANCHOR BOLT DETAIL E ANCHOR BOLT DETAIL G

D2 & B2 12 13 E1 (*)

ANCHOR BOLT DETAIL F ANCHOR BOLT DETAIL G1

PMB NPH TMT VTT

1 01.08.2023 ISSUED FOR APPROVAL 01

0 01.06.2023 ISSUED FOR APPROVAL 00

ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
ANCHOR BOLT DETAIL

QB19457/23

P03126/23

B01 AB4
11 & 12 B1 B2
A

B1 B2

12
10

VIEW B-B
B B

VIEW A-A DETAIL C


PMB NPH TMT VTT

1 01.08.2023 ISSUED FOR APPROVAL 01

0 01.06.2023 ISSUED FOR APPROVAL 00

ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
ANCHOR BOLT DETAIL

QB19457/23

P03126/23

ANCHOR BOLT DETAIL C B01 AB5


E E1 11 & 12
A
E E1

C C

12
10

VIEW B-B

B B

E E1

12
10

VIEW C-C

DETAIL C1 VIEW A-A


PMB NPH TMT VTT

1 01.08.2023 ISSUED FOR APPROVAL 01

0 01.06.2023 ISSUED FOR APPROVAL 00

ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
ANCHOR BOLT DETAIL

QB19457/23

P03126/23

ANCHOR BOLT DETAIL C1 B01 AB5a


D1 & C1 10 11
A

10 11

D1
C1

B B
VIEW B-B

DETAIL F1
VIEW A-A PMB NPH TMT VTT

1 01.08.2023 ISSUED FOR APPROVAL 01

0 01.06.2023 ISSUED FOR APPROVAL 00

ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
ANCHOR BOLT DETAIL

QB19457/23

P03126/23

ANCHOR BOLT DETAIL F1 B01 AB5b


12 13 11 & 12 12 13
A

C C

D1
C1

VIEW B-B

B B
13

D1
C1

VIEW C-C

DETAIL F2
VIEW A-A PMB NPH TMT VTT

1 01.08.2023 ISSUED FOR APPROVAL 01

0 01.06.2023 ISSUED FOR APPROVAL 00

ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
ANCHOR BOLT DETAIL

QB19457/23

P03126/23

ANCHOR BOLT DETAIL F2 B01 AB5c


SIGN CONVENTION SIGN CONVENTION SIGN CONVENTION SIGN CONVENTION

+ve +ve +ve +ve


FRAME @GL.10 FRAME @GL.11,12 FRAME @GL.C1,D1 Joist Beam

+ve +ve +ve +ve


+ve +ve +ve +ve

B1 C1 D1 E1 A B
B1 C1 D1 E1 1 3 1 3 B1 C1
H1 H3 H1 H3
2
V1 V3 V1 V3 E1 D1
H2

2 4 2 4 H1
1
V2 H2 H4
H2 H4
1 3 Joist beam
H1 H3 V2 V4 V1
V2 V4

V1 V3

LOAD CASE
H1 V1 H2 V2 H3 V3 H4 V4 H1 V1
H1 V1 H2 V2 H3 V3 LOAD CASE
H1 V1 H2 V2 H3 V3 H4 V4 KN KN KN KN KN KN KN KN LOAD CASE
LOAD CASE KN KN KN KN KN KN KN KN KN KN
KN KN KN KN KN KN DEAD LOAD -171 352 0 4 0 377 0 4
DEAD LOAD -111 474 0 5 0 462 0 5 COLLATERAL -152 311 0 2 0 334 0 2 DEAD LOAD 0 29
DEAD LOAD 1 1 0 121 -1 1 COLLATERAL -97 417 0 4 0 408 0 4 WIND LEFT CASE 1 12 -22 0 0 0 -23 0 0 COLLATERAL 0 31
COLLATERAL -3 0 0 109 3 0 WIND LEFT CASE 1 8 -44 0 0 0 -40 0 0 WIND RIGHT CASE 1 11 -21 0 0 0 -22 0 0
WIND RIGHT CASE 1 7 -39 0 0 0 -40 0 0
LIVE MEZZANINE 0 7
WIND LEFT CASE 1 -1 0 0 -5 1 0 WIND LEFT CASE 2 7 -13 0 0 0 -14 0 0
WIND LEFT CASE 2 8 -28 0 0 0 -24 0 0
WIND RIGHT CASE 1 -1 0 0 -5 1 0 WIND RIGHT CASE 2 6 -12 0 0 0 -13 0 0
WIND RIGHT CASE 2 6 -23 0 0 0 -23 0 0
WIND LEFT CASE 2 -1 0 0 -3 1 0
WIND END CASE 1 16 -25 0 0 0 -26 0 0 Note:
WIND END CASE 1 4 -45 0 0 0 -46 0 0 WIND END CASE 2 7 -16 0 0 0 -16 0 0
WIND RIGHT CASE 2 0 0 0 -3 0 0 WIND END CASE 2 2 -28 0 0 0 -29 0 0 Self-weight of finish floor is included in Collateral Load
LIVE MEZZANINE -34 69 0 0 0 74 0 0
WIND END CASE 1 -1 0 0 -5 1 0 LIVE MEZZANINE -22 93 0 1 0 91 0 1 T1 (TEMPERATURE) -22 0 0 0 0 0 0 0 T1 is Negative Temperature Load
T1 (TEMPERATURE) -30 0 0 0 0 -1 0 0 T2 (TEMPERATURE) 22 0 0 0 0 0 0 0 T2 is Positive Temperature Load
WIND END CASE 2 0 0 0 -3 0 0 T2 (TEMPERATURE) 30 0 0 0 0 1 0 0
LIVE MEZZANINE -1 0 0 24 1 0
T1 (TEMPERATURE) -24 0 0 1 24 0 Note:
T2 (TEMPERATURE) 24 0 0 -1 -24 0
Note: Self-weight of finish floor is included in Collateral Load
Note: Self-weight of finish floor is included in Collateral Load T1 is Negative Temperature Load
Self-weight of finish floor is included in Collateral Load T1 is Negative Temperature Load T2 is Positive Temperature Load
T1 is Negative Temperature Load T2 is Positive Temperature Load
T2 is Positive Temperature Load

SIGN CONVENTION SIGN CONVENTION SIGN CONVENTION

+ve +ve +ve


FRAME @GL.B1,E1 FRAME @GL.B2,D2 FRAME @GL.C2

+ve +ve +ve


+ve +ve +ve

10 11 11a 12 13
10 11 11a 12 13 10 11 11a 12 13
1 2 H1
1 H2
2
H2 2 H1 H2

V2
V1 V2 V1 V2
H1
1 H3
3

V1 V3

H1 V1 H2 V2 H1 V1 H2 V2
LOAD CASE LOAD CASE
KN KN KN KN KN KN KN KN
DEAD LOAD 74 50 -54 46 DEAD LOAD 128 19 -95 46
H1 V1 H2 V2 H3 V3
LOAD CASE
KN KN KN KN KN KN COLLATERAL 67 52 -49 49 COLLATERAL 112 18 -84 45
DEAD LOAD -41 3 0 201 41 3 WIND LEFT CASE 1 -3 1 2 1 WIND LEFT CASE 1 -9 0 6 0
COLLATERAL -30 1 0 191 30 1
WIND RIGHT CASE 1 -5 1 4 1 WIND RIGHT CASE 1 -8 0 6 0
WIND LEFT CASE 1 3 0 0 -22 -3 0
WIND RIGHT CASE 1 3 0 0 -21 -3 0 WIND LEFT CASE 2 -2 0 1 0 WIND LEFT CASE 2 -5 0 4 0
WIND LEFT CASE 2 2 0 0 -13 -2 0 WIND RIGHT CASE 2 -4 0 3 0 WIND RIGHT CASE 2 -5 0 3 0
WIND RIGHT CASE 2 2 0 0 -12 -2 0
WIND END CASE 1 -4 1 2 1 WIND END CASE 1 -9 0 8 0
WIND END CASE 1 4 0 0 -25 -4 0
WIND END CASE 2 -3 0 1 0 WIND END CASE 2 -7 0 2 0
WIND END CASE 2 2 0 0 -16 -2 0 PMB NPH TMT VTT

LIVE MEZZANINE -7 0 0 42 7 0 LIVE MEZZANINE 15 12 -11 11 LIVE MEZZANINE 25 4 -19 10 1 01.08.2023 ISSUED FOR APPROVAL 01
T1 (TEMPERATURE) -42 0 0 2 42 0 T1 (TEMPERATURE) -22 0 22 0 T1 (TEMPERATURE) -19 0 29 0 0 01.06.2023 ISSUED FOR APPROVAL 00
T2 (TEMPERATURE) 42 0 0 -2 -42 0
T2 (TEMPERATURE) 22 0 -22 0 T2 (TEMPERATURE) 19 0 -29 0
Note: Note: Note: ADMINISTRATION
Self-weight of finish floor is included in Collateral Load Self-weight of finish floor is included in Collateral Load Self-weight of finish floor is included in Collateral Load
VATANAC BREWERY
T1 is Negative Temperature Load T1 is Negative Temperature Load T1 is Negative Temperature Load
T2 is Positive Temperature Load T2 is Positive Temperature Load T2 is Positive Temperature Load VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
COLUMN REACTION

QB19457/23

P03126/23

B01 AB6
B1 C C1 C2 D D1 E E1

CROSS SECTION AT GL.10

S1a
S1 S1 S1 S1
S3 S3

S3 S3

S1b S1b S1b S1b

PMB NPH TMT VTT

1 01.08.2023 ISSUED FOR APPROVAL 01

0 01.06.2023 ISSUED FOR APPROVAL 00

ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
B1 B2 C C1 C2 D D1 D2 E E1

CROSS SECTION AT GL.11 PHNOM PENH, CAMBODIA


CROSS SECTION AT GL.10 & GL.11

QB19457/23

P03126/23

B01 A01
S1 S1 S1 S1
S2

S2

S1 S1 S1 S1

B1 B2 C C1 C2 D D1 D2 E E1

CROSS SECTION AT GL.11a

S1a
S1 S1 S1 S1
S3 S3

S3 S3

S1b S1b S1b S1b

PMB NPH TMT VTT

1 01.08.2023 ISSUED FOR APPROVAL 01

0 01.06.2023 ISSUED FOR APPROVAL 00

ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
B1 B2 C C1 C2 D D1 D2 E E1
CROSS SECTION AT GL.11a & GL.12

CROSS SECTION AT GL.12 QB19457/23

P03126/23

B01 A02
S1 S1 S1
S1 S1

S1 S1c S7
S1

10 11 11a 12 13

CROSS SECTION AT GL.C1 & D1

S4

PMB NPH TMT VTT

1 01.08.2023 ISSUED FOR APPROVAL 01

0 01.06.2023 ISSUED FOR APPROVAL 00

ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
CROSS SECTION AT GL.C1, D1 & GL.C2
10 11 11a 12 13 QB19457/23
CROSS SECTION AT GL.C2 P03126/23

B01 A03
10 11 11a 12 13

CROSS SECTION AT GL.B2

PMB NPH TMT VTT

1 01.08.2023 ISSUED FOR APPROVAL 01

0 01.06.2023 ISSUED FOR APPROVAL 00

ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA

10 11 11a 12 13 CROSS SECTION AT GL.D2

QB19457/23
CROSS SECTION AT GL.D2
P03126/23

B01 A04
S5

10 11 11a 12 13

CROSS SECTION AT GL.B1 & E1

DETAIL S1a DETAIL S1b DETAIL S4 DETAIL S1c


PMB NPH TMT VTT

1 01.08.2023 ISSUED FOR APPROVAL 01

0 01.06.2023 ISSUED FOR APPROVAL 00

ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
CROSS SECTION AT GL.B1 & GL.E1

QB19457/23

P03126/23

DETAIL S1 DETAIL S2 DETAIL S3 DETAIL S5 B01 A05


B

MB
B1

B2

MB

MB
MB
C

MB MB MB MB
C1

MB

MB
MB

MB
MB MB
C2
D

MB MB MB MB
D1

MB

MB
MB

D2
E

MB MB
E1

PMB NPH TMT VTT

1 01.08.2023 ISSUED FOR APPROVAL 01

0 01.06.2023 ISSUED FOR APPROVAL 00

F ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
10 11 11a 12 13
BOTTOM CHORD PLAN LEAVEL +18.550M
BOTTOM CHORD PLANE LEVEL +18.550M QB19457/23

P03126/23

B01 A06
B

CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H

B1

MB

MB
JB

JB

JB

JB

JB

JB

JB

JB

JB

JB
MB
CONC. BEAM 700Wx1000H

CONC. BEAM 800Wx1000H


MB MB MB MB
B2

C SUPPORT DECKING DETAIL


JB

JB

JB

JB

JB

JB

JB

JB

JB

JB
MEZZANINE DESIGN SUMMARY
MB MB MB MB Mezzanine Live Load 1.0 kN/m²
C1 Dead Load (Excluding Joists & Beams) 4.16 kN/m²
Additional Load (Collateral Load) 4.5 kN/m²

MB

MB
MB
Total Load (Excluding Joists & beams) 9.66 kN/m²
Decking 1mm Peb Deck 76mm By PEB
CONC. BEAM 700Wx1000H

CONC. BEAM 800Wx1000H


Total Concrete (T) 200 mm By Other
JB

JB

JB

JB

JB

JB

JB

JB

JB

JB
BEAM SIZE STD. END CONNECTION REMARKS
MB: REFER CROSS SECTION
MB MB MB MB JB W.300x5; F.150x5 3M24HSB; KNIFE 10mm NA
C2
D
JB

JB

JB

JB

JB

JB

JB

JB

JB

JB
MB MB MB MB
D1

MB

MB
MB
CONC. BEAM 700Wx1000H

CONC. BEAM 800Wx1000H


JB

JB

JB

JB

JB

JB

JB

JB

JB

JB
MB MB MB MB
D2
E
MB

MB
MB
JB

JB

JB

JB

JB

JB

JB

JB

JB

JB
E1
CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H CONC. BEAM 800Wx850H

PMB NPH TMT VTT

1 01.08.2023 ISSUED FOR APPROVAL 01

0 01.06.2023 ISSUED FOR APPROVAL 00

F ADMINISTRATION
VATANAC BREWERY
VATTANAC BREWERY PHNOM PENH
BREWERY ADMINISTRATION BUILDING
PHNOM PENH, CAMBODIA
10 10a 10b 10c 11 11c 11b 11a 11d 11e 12 12a 12b 12c 13
MEZZANINE PLANE LAVEL +21.500M
MEZZANINE PLANE LEVEL +21.500M QB19457/23

P03126/23

B01 A07
DRAWING INDEX
REV 01
01 COLUMN LAYOUT PLAN
02 MEZZANINE LAYOUT
03 CROSS SECTION
04 ROOF SHEETING PLAN

PROPOSAL DRAWING(PPD)
NOTE: NOT FOR CONSTRUCTION

Must replace the latest drawing!

CUSTOMER: VATTANAC BREWERY

PROJECT NAME: ADMINISTRATION BUILDING


LOCATION: PHNOM PENH, CAMBODIA
CENTER TO CENTER OF STEEL COLUMN
B

2950
A
440 5440 5440 5440 5430 580
22770
OUT TO OUT OF STEEL BEAM

1a 1 2 3 4 5 5a

1/F PART PLAN-FOOTBRIDGE WALKWAY LEVEL


CENTER TO CENTER OF STEEL COLUMN

B
2950

A
5440 5440 5440 5430
21750
CENTER TO CENTER OF STEEL COLUMN

1 2 3 4 5
2/F PART PLAN-FOOTBRIDGE ROOF LEVEL

L
T2 T1 L1 APPLICABLE CODES IN PEB STEEL QUOTE NO. : QB19457-23
1. IBC - 2009 4. AISI - 2007
2. MBMA - 2010 5. AWS D1.1/D1.1M : 2008 REV. NO. : 01
Pipe D
DxP

3. AISC - 2005
PROJECTION MIN 5MM
(OR 2 THREAD PICH)
TACK WELD @3POINT SAB

H (MIN 12xD)
W N
PRO NOTE:
BLDG. NO. : B02
STRAIGHT ANCHOR BOLT DIMENSIONS
A. Wind speed : 110 BLDG. NAME :
PLASTIC CAP b. Live load on Roof : 0.57KN/M2
QTY. SYM. SIZE
COMPONENT
ID
DxP
THREAD PICH
T1
(mm)
T2
(mm)
L
(mm)
PRO
(mm)
Pipe D
(mm)
L1
(mm)
c. Live load on Purlin : 0.57KN/M2 ADMINISTRATION BUIDING
(mm) d. Live load on Frame : 0.3KN/M2
e. Rainfall : 200
- M20 SAB:20 M20 x 2.5 125 30 450 80 Ø49 80
f. Mezzanine Live load : 6.4KN/m2
CUSTOMER : VATTANAC BERWERY
- M24 SAB:24 M24 x 3 145 35 510 95 Ø60 90
- M30 SAB:30 M30 x 3.5 165 40 630 110 Ø76 100
g. Dead load (Excluding Joists & Beams : 1KN/m2 LOCATION : PHNOM PENH, CAMBODIA
- M36 SAB:36 M36 x 4 190 45 750 130 Ø90 120 h. Additional Load (Collateral Load) : N/A KN/m2
- M42 SAB:42 M42 x 4.5 230 55 870 160 Ø110 140 i. All dimensions are in millimeter. DRN. BY DATE CHK. BY CONFIRMED DATE SHEET NO.
- M48 SAB:48 M48 x 5 260 60 980 180 Ø110 150 j. This is a proposal drawing only, not for construction.
STRAIGHT ANCHOR BOLT DETAIL HCH 03-Aug-2023 VDA VDA 03-Aug-2023 1
301
CENTER TO CENTER OF STEEL COLUMN

B
2950

CONCRETE SLAB THK:100MM

A
440 5440 5440 5440 5430 580
22770
OUT TO OUT OF STEEL BEAM

1a 1 2 3 4 5 5a

MEZZANINCE PART PLAN-FOOTBRIDGE WALKWAY LEVEL

CONCRETE SLAB
(BY OTHER)
PEBDECK SCREW CONCRETE.(BY OTHERS) QUOTE NO. : QB19457-23
ANGLE
CONCRETE SLAB CONCRETE STOPPER
(BY OTHER) REV. NO. : 01
BLDG. NO. : B02
BEAM
BEAM
BLDG. NAME :
MEZZ. BEAM MEZZ. BEAM MEZZ. BEAM MEZZ. BEAM JA2
ADMINISTRATION BUIDING
CUSTOMER : VATTANAC BERWERY
(4+4)M20 HSB (4+4)M20 HSB
COLUMN
PL-16MMTHK. COLUMN
PL-16mmTHK. LOCATION : PHNOM PENH, CAMBODIA
DRN. BY DATE CHK. BY CONFIRMED DATE SHEET NO.
DETAIL DETAIL DETAIL DETAIL DETAIL CONNECTION JB & MB HCH 03-Aug-2023 VDA VDA 03-Aug-2023 2
Roof panel: Lock-Seam 0.50mm Thnk.

755
1000

CONCRETE SLAB THK:100MM


+19.925

700
305

600
600
700

900

440 5440 5440 5440 5430


580

1a 1 2 3 4 5 5a
SIDE WALL AT GL.A

Handrail Supply by other

2950

B A
ENDWALL AT GL.1

APPLICABLE CODES IN PEB STEEL QUOTE NO. : QB19457-23


CABLE Ø 15 1. IBC - 2009 4. AISI - 2007
HILL SIDE WASHER 1510 (LAP)
2. MBMA - 2010 5. AWS D1.1/D1.1M : 2008 REV. NO. : 01
3. AISC - 2005
755 755
L40x65x1.5 NOTE:
BLDG. NO. : B02
02 SCREW
FLAT WASHER
FERRULE
80 A. Wind speed : 110 BLDG. NAME :
b. Live load on Roof : 0.57KN/M2
HEX NUT THIMBLE 01 SCREW
c. Live load on Purlin : 0.57KN/M2 ADMINISTRATION BUIDING
2 M12X30 MSB d. Live load on Frame : 0.3KN/M2
L25x25x1.5 e. Rainfall : 200
EYE BOLT (BOLT+NUT+2WASHER)(TYP.)
COLUMN FLANGE BRACE
01 SCREW EACH END
f. Mezzanine Live load : 6.4KN/m2
CUSTOMER : VATTANAC BERWERY
RAFTER U-45x35x2.4
RAFTER/COLUMN g. Dead load (Excluding Joists & Beams : 1KN/m2 LOCATION : PHNOM PENH, CAMBODIA
WEB h. Additional Load (Collateral Load) : N/A KN/m2
NOTE: ALL BOLTS ARE M12x30mm MSB WITH DOUBLE WASHER
NOTE: LAP 375 SEE E04 DWG.
i. All dimensions are in millimeter. DRN. BY DATE CHK. BY CONFIRMED DATE SHEET NO.
j. This is a proposal drawing only, not for construction.
CABLE BRACING FLANGE STAY WITH LAP SAG ARRESTOR DETAIL HCH 03-Aug-2023 VDA VDA 03-Aug-2023 3
Roof panel: Lock-Seam 0.50mm Thnk.

B
2950

A
5440 5440 5440 5430
21750
CENTER TO CENTER OF STEEL COLUMN

1 2 3 4 5
ROOF LAYOUT PLAN

DISTANCE BETWEEN CLIPS FOR QUOTE NO. : QB19457-23


EXCELLENT WIND RESISTANCE SELF-LOCK FIXING SUPPORTER BRACE WEB OF RAFTER/COLUMN

470
ROD REV. NO. : 01
HILLSIDE WASHER RAFTER/COLUMN
BLDG. NO. : B02
65
66

C.P.WASHER 50 LONG SLOT


BLDG. NAME :
SELF - LOCK FIXING SUPPORTER
CLIP FOR LOKSEAM ADMINISTRATION BUIDING
NUT NUT ROD
360°
CUSTOMER : VATTANAC BERWERY
LOKSEAM CLIP
LOCATION : PHNOM PENH, CAMBODIA
DRN. BY DATE CHK. BY CONFIRMED DATE SHEET NO.
THE CONCEALED FIXING CONCEPT (LOKSEAM) BRACE ROD FIXING DETAIL HCH 03-Aug-2023 VDA VDA 03-Aug-2023 4
Applicable Codes, Deflection Criteria & Material Specifications

PEB STEEL COMPLIANCE WITH LATEST INTERNATIONAL CODES


Loads on all buildings are applied in accordance with:
2009 edition of the International Building Code (IBC2009/MBMA2010)

Manufacturing and Erection tolerances are applied as per: Please replace


with the
2010 edition of the Low Rise Building Systems Manual (MBMA 2010)

Hot rolled sections and built up sections are designed in accordance with:
updated design
1989/2005 Manual of Steel Construction – Allowable Stress Design (AISC)

2001 Edition of AISI 2001- American Iron and Steelcodes.


Cold formed members are designed in accordance with:
Institute

Welding is applied in accordance with:


2008 American Welding Society (AWS 2008)

PEB STEEL STRICT DEFLECTION CRITERIA


Deflection
Deflection Structural Member Load Case
Limitation
Live or 10 years
1 Main frame rafters Span/ 180
Wind
Snow or 10 years
2 Roof purlins Span/ 150
Wind or Live
Vertical
3 Mezzanine beams and joists Span/ 360 Dead Load
Deflection
4 Top running crane (TRC) beams Span/ 600 Crane load
5 Underhung crane (UHC) beams Span/ 450 Crane load
6 Monorail crane (MR) beams Span/ 450 Crane load
Main frame columns with eave height
1 Eave height/60 10 year Wind
(EH) up to 9.0 m

Main frame columns with eave height


2 Eave height/100 10 year Wind
(EH) greater or equal to 9.0 m
Lateral Main frames supporting top running 10 year Wind or
Deflection 3 Height/100
cranes Crane lateral
4 Wall Girt Span/ 120 10 year Wind
5 Endwall wind columns Span/ 120 10 year Wind
6 Portal frames Height/120 10 Year Wind
MATERIAL SPECIFICATIONS FOR PROJECT

Material Specifications
Minimum yield
No Components Specifications Applicable Design Code
strength
Built –up ASTM A572-Gr50 Fy = 34.5 AISC - American Institute of Steel
1
(Plates) (or equivalent) <20mm kN/cm2 Construction - Latest Edition
JIS G3101-SS400 AISC - American Institute of Steel
Angles Fy = 24.5 kN/cm2
(or equivalent) Construction - Latest Edition
2 Hot Rolled
JIS G3101-SS400 AISC - American Institute of Steel
Beams Fy = 24.5 kN/cm2
(or equivalent) Construction - Latest Edition

Cold Form Galvanized AS 1397 Fy = 45.0 AISI - American Iron & Steel
3
≤ (Z275) ≤ (Z275) (or equivalent) kN/cm2 Institute - 2001 Edition

Cold Form NSDC570/NSDH540/ Fy = 45.0 AISI - American Iron & Steel


4
(Silver180TM) K18 (or equivalent) kN/cm2 Institute - 2001 Edition

ASTM A792 Gr.50


Roof panel/Wall panel Fy = 34.5 AISI - American Iron & Steel
5 JIS G3321 AZ150
(Alu-Zinc) kN/cm2 Institute - 2001 Edition
(or equivalent)
ASTM A755/A792
Roof panel/Wall panel Gr.50 Fy = 34.5 AISI - American Iron & Steel
6
(AluPeb) JIS G3322 AZ150 kN/cm2 Institute - 2001 Edition
(or equivalent)
ASTM A755/A792
Roof panel Gr.50 Fy = 34.5 AISI - American Iron & Steel
7
(AluPeb70) JIS G3322 AZ70 kN/cm2 Institute - 2001 Edition
(or equivalent)
Galvanized EN - 12385 ASCE - American Society of Civil
8 X-Bracing Fu = 157 kN/cm2 Engineers Standards
cable bracing (or equivalent)

Anchor bolts JIS G3101-SS400 Fu = 40.0 AISC - American Institute of Steel


9
(Galvanized) (or equivalent) kN/cm2 Construction - Latest Edition

Ft = 30.3 kN/cm2
High strength Bolts ASTM A325 Type 1 AISC - American Institute of Steel
10 Fu = 72 to 83
(Galvanized) (or equivalent) Construction - Latest Edition
kN/cm2

Machine Bolts DIN 933- Grade 4.6 Ft = 13.8 kN/cm2 AISC - American Institute of Steel
11 2
(Galvanized) (or equivalent) Fu = 41.0 kN/cm Construction - Latest Edition
VBL BREWERY ADMIN BLOCK
(PACKAGE: STEEL STRUCTURE ROOF) POST TENDER ADDENDUM 01

3.0 Design responsibility, supply and install scope

Where become applicable, any design responsibility shall include the following factors:

a) Code and practice and/or local market practice; in case of discrepancies, the most stringent
requirements shall prevail
b) Safety during the construction and after handover.
c) All temporary works required for to complete the works.

4.0 Pricing inclusion

The contract rate and price shall deemed to be conclusive, inclusive of all labor, material, plants, tools,
equipment, testing, haulage, carting, cutting cost, handling, assembling, fixing, trimming, fixed to
position, hoisting, transport, loading and unloading, working space, ancillary works, temporary works,
temporary protection, material indispensably, cleaning, attendance cost, overhead cost, profit, tax and all
necessary works for the satisfactory completion of the works and including maintenance cost during
Defect Notification Period and providing necessary warranty. The Contractor to refer preambles for full
listing.

The quality of the works shall as per Employer’s satisfactory.

In addition, the material contract rate shall include:

a) All wastage
b) All lapping, joint length and overlap length
c) All construction joint, expansion joint and other similar movement joint
d) All cost associated to built concrete kicker and water stop
e) All cutting
f) Working space cutting work, fabrication, cut to profile, trimming, chamfering, splayed, bullnose,

Pls remove
rebate, fixed to position including drilling, putty, mortar infill, etc.
g) Fire proof certificate for fire resistance items.
h) Work around opening, drain and curve/edge surface
i) All bracket, suspension system, rod, hanger, clip and other accessories complete with anti-rust
j) All steel to be coated with anti-rust coating
k) Any extra quantity/work due to termination works, cable pulling, etc
l) If not described, the works shall include testing commissioning
m) All profit and overhead in relation to material

In addition, the labour contract rate shall include:

a) Annual leave, paid holidays and sick days


b) Travelling cost
c) Site accommodation
d) Non-productive time and overtime
e) Incentive
f) Other employee benefit and welfare
g) All profit and overhead in relation to labour

All material and temporary material (except for tools, machinery, plant, site office, workers camp and
administrative equipment for site staff and worker) including wastage shall belong to the Employer.

The contract rate and price shall not subject to any fluctuation.

B.4 / 2 of 10
and labour employed on the site from insect and pest nuisance, and to reduce their
danger to health. The contractor shall provide suitable prophylactics for the

Contractor’s Personnel and shall comply with all the regulations of the local health
authorities, including use of appropriate insecticide.”

CLAUSE 7 PLANT, MATERIALS AND WORKMANSHIP

Sub-Clause 7.2 Samples

Delete Sub-Clause 7.2 and substitute:

“The Contractor shall submit samples and relevant information of all major Materials

intended for incorporation into the works to the Engineer for Consent prior to using
the Materials in or for the Works.

Each sample shall be labelled as to origin and intended use in the Works. Samples
shall become the property of the Employer.”

Sub-Clause 7.4
7.6Remedial Work
At the end of sub-clause 7.6, insert the following paragraph:

“At his sole discretion, the Engineer may retain any plant, Materials or work which is

not in accordance with the Contract, in which case and adjustment shall be included
in the Contract Price commensurate with the reduced value to the employer of the
defective plant, materials and work.

In determining this adjustment, the Engineer shall proceed in accordance with sub-
clause 3.5 [Determinations].”

Sub-Clause 7.7 Ownership of plant and Materials

Add new paragraph at the end of this Sub-Clause:

“The parties agree that, for the purpose of effective transfer of title of any item of

plant and Materials to the employer, the employer shall have control or be deemed
to have control over the item of plant and/or materials upon the occurrence of either
of the events in sub-paragraph (a) or (b) above”.

CLAUSE 8 COMMENCEMENT, DELAYS AND SUSPENSION

Sub-Clause 8.1 Commencement of Work

Delete the first paragraph of Sub-Clause 8.1 and substitute with the following:

“Commencement date shall be the date as stated in the Letter of Acceptance.”

Page 11 of 25