OPERATION
SWICPOWER TECHNOLOGY SDN BHD
STANDARD OF PROCEDURE Rev.: Sheet No.
Client
Requirement
Client
satisfaction
No
Stock Check Material Requistion
Yes
Inventory Requistion
QC Check / Testing
END
Ref No: Eff. Date:
OPERATION STANDARD OF
SWICPOWER TECHNOLOGY SDN PROCEDURE Rev: Sheet No:
BHD
Engineering review
Details 1
Details Requires
Project Name
PIC / Company
Tag Panel
Implementation Requires
Load list Preparation
GA Drawing
Component Review
Project Summary
Project Award
Details 2
Assembly Works
Details 3
Documentation requires
Approval Drawing