Ref. No.: Eff.

Date:
OPERATION
SWICPOWER TECHNOLOGY SDN BHD
STANDARD OF PROCEDURE Rev.: Sheet No.

Engineering Project Procedures

Client
Requirement

Enginering Review Refer to


Details 1
No
Yes

Client
satisfaction

Project Award Refer to


Details 2

No
Stock Check Material Requistion

Yes

Inventory Requistion

Item Preparation Item Purchasing

Assembly work Refer to


Details 3

QC Check / Testing

Packing and Dilivery Refer to


Details 4

END
Ref No: Eff. Date:
OPERATION STANDARD OF
SWICPOWER TECHNOLOGY SDN PROCEDURE Rev: Sheet No:
BHD

Engineering review
Details 1
Details Requires
 Project Name
 PIC / Company
 Tag Panel

Implementation Requires
 Load list Preparation
 GA Drawing
 Component Review
 Project Summary

Project Award
Details 2

 Received Job Number.


 Reconfirm Drawing
 Enquiry Component.

Assembly Works
Details 3

Mandatory PPE requires


 Safety Shoe
 Safety Glass/ Goggle
 Glove

Insulated Tools/ Equipment requires


 Hand drill
 Grinder
 Screwdriver
 Cable Cutter
 Test pen

Documentation requires
 Approval Drawing

Packing and Identify Job No.


Detail 4
 Equipment must always keep clean and tidy before packing
 Provide Interior and external labeling
 Equipment not any damaged, loose part or component missing
 After packing equipment needed to provide marking and labeling
 Store/ place at the designed area for ready delivery.