In class acrivity-Dina Gunasekera

Identif atleast 4 tasks of a bridge construction project where the sman is 100m. hwight is 50m
and the deck is constructed on 4 piers
Identify haxards assicitaes woth each task along woth risk for each hazard.
Indicate prioirit givem for each risk woth control measure
Explain procedure used for prioritization
Risk Assessment
Task Hazard Risk PROIRITY cONTROL
Task 1 Planks may slip Will lead to High Secure the planks
Building or throughout the inuries ranging and scaffolding
taking apart process from minor to tightly and ensure
scaffolding death workers are
wearing protective
equipment,Provide
a harness
Presence of May lead to Very high Avoid rushing the
overhead electrocution job, Make sure
electrical wires scaffolding is on
even ground and is
soindly anchored,
levelled and
adjusted and that
all legs are plumb
Lack of guard Will tend to fall Very high Ensire
rails of scaffoldings
always have a
guard rail even at
low heights
Task 2 Slight body May lead to Low
Laoding or injusries miscle, nerve
unloading injuries etc
building
meterials
Task 3 Sparks from May cause eye High Use aporporiate
Welding welding may get and facial eye or facial
into damge protection
eyes/face.skin
Exposure to May cause High Wear am
funes and gases damage to approved respiraot
respiratory
systme
Fire and Death Very high Maintaining a
explosion clean working
area before
proceeding to
weld
Task 4 Leaves a pit at May cause
Digging the site workers/staff to
trenches fall in leading to
death
Tools left near Tools left on
the trenches will uneven ground
be harmful above the
trenche may fall
into the trench
harming the
workers
Trenches depth Trenches may Support the sides
is too deep collapse if its of trenches througj
dug too deep shoring

You might also like