Sl no Description No Length(m) Breadth(m)

1 Earth work in exclavation


Long wall 2 11.7 1.1
Short wall 3 5.2 1.1

2 C.C foundation in
Long wall 2 11.7 1.1
Short wall 3 5.2 1.1

3 Brick work foundation and plinth


Long wall
1st footing 2 11.4 0.8
2nd footing 2 11.3 0.7
3rd footing 2 11.2 0.6
4th footing 2 11.1 0.5
Plinth wall above feeting 2 11 0.4
Short wall
1st footing 3 5.5 0.8
2nd footing 3 5.6 0.7
3rd footing 3 5.7 0.6
4th footing 3 5.8 0.5
Plinth wall above feeting 3 5.9 0.4

4 Damp proof course


Long wall 2 11 0.4
Short wall 3 5.9 0.4

Deduct door wall 2 1.2 0.4

5 Brick work in super structure


Long wall 2 10.9 0.3
Short wall 3 6 0.3

Deduct door opening 2 1.2 0.3


Window opening 4 1 0.3
Shelves 2 1 0.2
Lintels over doors 2 1.5 0.3
Lintels over window 4 1.3 0.3
Lintels over shelves 2 1.5 0.3
Height(m) Quantity(m3) Remark

1 25.74 L=10.6+1.1=11.7
1 17.16 L=6.3-1.1=5.2
Total 42.9

0.3 7.722 L=10.6+1.1=11.7


0.3 5.148 L=6.3-1.1=5.2
Total 12.87

0.2 3.648 L=10.6+0.8=11.4


0.1 1.582 L=10.6+0.7=11.3
0.1 1.344 L=10.6+0.6=11.2
0.1 1.11 L=10.6+0.5=11.1
0.8 7.04 L=10.6+0.4=11
Total 14.724
0.2 2.64 L=6.3-0.8=5.5
0.1 1.155 L=6.3-0.7=5.6
0.1 1.026 L=6.3-0.6=5.7
0.1 0.87 L=6.3-0.5=5.8
0.8 5.664 L=6.3-0.4=5.9
Total 11.376

0.8 L=10.6+0.4=11
0.78 L=6.3-0.4=5.9
Total 15.88
0.96
deduct 14.92

4.2 27.986
4.2 22.68
Total 27.986
2.1 1.512
1.5 1.8
2.5 0.6 Back of shelves 10cm thick wall
0.15 0.135 Bearing 15cm
0.15 0.234 Bearing 15cm
0.15 0.117 Bearing 15cm
Total 4.398
SUBMITTED BY
NAME-MANASI BHESRA
BRANCH-CIVIL ENGINEERING
SEMESTER-3RD
GROUP-1
ROLL NO-F22117001030
TOPIC-DOUBLE BUILDING ROOM
(Long wall short wall method)
Sl No Description No Length(m) Breadth(m) Height(m)
1 Earth work in exclavation
Long wall 2 11.7 1.1 1
Short wall 3 5.2 1.1 1
Total
2 Cement concrete in foundation
Long wall 2 6.2 0.9 0.3
Short wall 3 3.4 0.9 0.3
Total
3 Brick work in foundation
Long wall
1st footing 2 10.2 0.9 0.25
2nd footing 2 10 0.7 0.1
3rd footing 2 9.9 0.6 0.2
4th footing 2 10.3 0.5 0.15
Plinth 2 9.7 0.4 0.8
Total
Short wall
1st footing 2 3.4 0.9 0.25
2nd footing 2 3.6 0.7 0.2
3rd footing 2 3.7 0.6 0.1
4th footing 2 3.8 0.5 0.15
plinth 2 3.9 0.4 0.8
Total
4 Brick work in super structure
Long wall 2 9.6 0.3 3.3
Short wall 2 4 0.3 3.3
Total
Quantity(m3) Remark

25.74 L=5.3+0.9=6.2
17.16 L=4.3-0.9=3.4
42.9

3.348 L=5.3+0.9=6.2
1.836 L=4.3-0.9=3.4
5.184

4.59 L=9.3+0.9=10.2
2.8 L=9.3+0.7=10
1.118 L=9.3+0.6=9.9
1.545 L=9.3+0.5=9.8
6.208 L=9.3+0.4=9.7
16.331

1.53 L=4.3-0.9=3.4
1.008 L=4.3-0.7=3.6
0.444 L=4.3-0.6=3.7
0.57 L=4.3-0.5=3.8
2.496 L=4.3-0.4=3.9
6.048

19.008 l=9.3-0.3=9.6
7.92 L=4.3-0.3=4
26.928

SUBMITTED BY
NAME-MANASI BHESRA
BRANCH-CIVIL ENGINEERING
SEMESTER-3RD
GROUP-1
ROLL NO-F22117001030
TOPIC-SINGLE ROOM BUILDING
(Long wall short wall method)
Sl no Particulars of item No Length(m) Breadth(m)
1 Earth work in exclavation in foundation 1 39 1.1

2 Lime concrete in foundation 1 39 1.1

3 First class brick work in foundation and plinth


1st footing 1 39.3 0.8
2nd footing 1 39.4 0.7
3rd footing 1 39.5 0.6
4th footing 1 39.7 0.5
Plinth 1 39.8 0.4

4 Damp proof course 1 39.7 0.4


Deduct doorsills 2 1.2 0.4

5 Brick work in super structure 1 39.8 0.3


6 Deduct door opening 2 1.2 0.3
window opening 4 1 0.3
shelves opening 2 1 0.2
Lintels over window 4 1.3 0.3
Lintels over shelves 2 1.3 0.3
Height(m) Quantity(m3) Remark
1 42.9 L=40.1-2*.5*1.1=39

0.3 12.87 L=40.1-2*.5*1.1=39

0.2 6.288 L=40.1-2*.5*0.8=39.3


0.1 2.758 L=40.1-2*.5*0.7=39.4
0.1 2.37 L=40.1-2*.5*0.6=39.5
0.1 1.98 L=40.1-2*.5*0.5=39.7
0.8 12.704 L=40.1-2*.5*0.4=39.8
Total 26.1
15.88 L=40.1-2*.5*0.4=39.7
0.96
Deduct 14.92
4.2 50.148 L=40.1-2*.5*0.3=39.8
2.1 1.512
1.5 1.8
1.8 0.6
0.15 0.234
0.15 0.117
Total 4.263

SUBMITTED BY
NAME-MANASI BHESRA
BRANCH-CIVIL ENGINEERING
SEMESTER-3RD
GROUP-1
ROLL NO-F22117001030
TOPIC-DOUBLE ROOM BUILDING
(Centre line method)
Sl no Particulars of item No Length(m) Breadth(m)
1 Earth work in exclavation in foundation 2 26 1.2

2 Cement concrete in foundation 2 26 1.2

3 1st class brick work in foundation in plinth


1st footing 2 26.3 0.9
2nd footing 2 26.5 0.7
3rd footing 2 26.6 0.6
4th footing 2 26.7 0.5
Plinth 2 26.8 0.4

4 Super structure 2 26.9 0.3


Height(m) Quantity(m3) Remark
0.85 53.04 L=27.2-2*1/2*1.2=26

0.15 9.36 L=27.2-2*1/2*1.2=26

0.25 11.835 L=27.2-2*1/2*0.9=26.3


0.2 7.42 L=27.2-2*1/2*0.7=26.5
0.1 3.192 L=27.2-2*1/2*0.6=26.6
0.15 4.005 L=27.2-2*1/2*0.5=26.7
0.8 17.152 L=27.2-2*1/2*0.4=26.8
Total 43.604
3.3 53.262 L=27.2-2*1/20.3=26.9

SUBMITTED BY
NAME-MANASI BHESRA
BRANCH-CIVIL ENGINEERING
SEMESTER-3RD
GROUP-1
REGD-F22117001030
TOPIC-
Sl no Particulars of item and details work No Length(m)
1 Earth work in exclavation and foundation
Long wall 2 5.3
Short wall 2 2.5
Verandah Pillars 3 0.7
Front wall 1 3.1
Side wall 2 1.55
Step 1 2.1

2 Lime concrete in foundation


Long wall 2 5.3
Short wall 2 2.5
Verandah Pillars 3 0.7
Front wall 1 3.7
Side wall 2 1.85
Step 1 2.1

3 First class brick work in foundation and plinth


Long wall
1st footing 2 5.1
2nd footing 2 5
Plinth 2 4.9
Short wall
1st footing 2 2.7
2nd footing 2 2.8
Plinth 2 2.9
Verandah pillars footing 3 0.5
Pillar plinth 3 0.4
Front wall 1 3.7
Side wall 2 1.9

Step
1st step 1 2
2nd step 1 1.4

4 Damp proof coarse


Long wall 2 4.9
Short walL 2 2.9

Verandah pillars 3 0.4

Deduct door sils 2 1

5 First class brick work in super structure


Long wall 2 4.8
Short wall 2 3
Verandah pillars 3 0.3
Front above lintel 1 4.8
Side above lintel 2 2
Parapet long wall 2 4.8
Parapet short wall 2 3.2

Deduct
Door opening 2 1
Window opening 3 1
Shelve 1 1
Ventilators 1 0.6
Breadth(m) Height(m) Quantity(m3) Remark

0.8 0.65 5.512 L=4.5+0.8=5.3m


0.8 0.65 2.6 L=3.3-0.8=2.5m
0.7 0.65 0.9555
0.4 0.25 0.31 L=4.5-0.7-0.7/2-0.7/2=3.10
0.4 0.25 0.31 L=2.3-0.8/2-0.7/2=1.55
0.65 0.1 0.14
9.8275

0.8 0.3 2.544 L=4.5+0.8=5.3m


0.8 0.3 1.2 L=3.3-0.8=2.5m
0.7 0.3 0.94
0.4 0.1 0.148 L=4.5-0.4-0.4/2-0.4/2=3.7
0.4 0.1 0.148 L=4.5-0.4-0.4/2-0.4/2=1.85
0.65 0.06 0.0819 L=4.5-0.65-0.65/2-0.65/2=2.1
Total 5.0619

0.6 0.1 0.612 L=4.5+0.6=5.1


0.5 0.1 0.5 L=4.5+0.5=5
0.4 0.6 2.352 L=4.5+0.4=4.9

0.6 0.1 0.324 L=3.3-0.6=2.7


0.5 0.1 0.28 L=3.3-0.5=2.8
0.4 0.6 1.392 L=3.3-0.4=2.9
0.5 0.1 0.075
0.4 0.7 0.336
0.2 0.6 0.444 L=4.5-0.4-0.4/2-0.4/2=3.7
0.2 0.6 0.456 L=2.30-0.4=1.9
Total 6.771

0.6 0.19 0.228


0.3 0.15 0.063
Total 0.291

0.4 3.92
0.4 2.32
Total 6.24
0.4 0.48
Total 6.72
0.4 0.8
Deduct 5.92

0.3 3.5 10.08


0.3 3.5 6.3
0.3 2.2 0.594
0.3 0.4 0.576
0.3 0.4 0.48
0.2 0.375 0.72
0.2 0.375 0.48
Total 19.23

0.3 2 1.2
0.3 1.4 1.26
0.2 1.7 0.34
0.3 0.3 0.054
Total 2.854

SUBMITTED BY
NAME-MANASI BHESRA
BRANCH-CIVIL ENGINEERING
SEMESTER-3RD
REGD-F22117001030
TOPIC-SINGLE ROOM WITH FRONT VERANDAH
VERANDAH
Sl no Particulars of item No Length(m)
1 Earth work in exclavation in
Breadth(m) Height(m) Quantity(m3)
Remark
Sl no Particulars of item No Length(m) Breadth(m)
1 Earth work in exclavation in foundation
Rooms
Long wall 2 9 0.9
Short wall 3 3.4 0.9
Verandah front 1 8.9 0.7
Verandah sides 2 1.95 0.7
Step 1 2.9 1

2 Earth work in filling in plinth


Room 1 1 3.9 3.4

Room 2 1 3.9 3.9


Verandah 1 7.9 2.4

3 Lime concrete in foundation


Rooms
Long walls 2 9 0.9
short walls 3 3.4 0.9
Verandah front 1 8.9 0.7
Verandah side 2 1.95 0.7
Step 1 2.9 1

4 First class brick work in foundation in plinth


in 1:6 cement mortar
Rooms
Long walls
1st footing 2 8.8 0.7
2nd footing 2 8.7 0.6
3rd footing 2 8.6 0.5
Plinth wall 2 8.5 0.4

Short walls
1st footing 3 3.6 0.7
2nd footing 3 3.7 0.6
3rd footing 3 3.8 0.5
Plinth wall 3 3.9 0.4

Verandah
Front wall(long)
1st footing 1 8.7 0.5
2nd footing 1 8.6 0.4
Plinth wall 1 8.5 0.3

Side wall(short)
1st footing 2 2.15 0.5
2nd footing 2 2.25 0.4
Plinth wall 2 2.35 0.3

5
Height(m) Quantity(m3) Remark

0.9 14.58 L=8.10+9=9.0


0.9 8.26 L=4.30-90=3.40
0.9 5.61 L=8.20+7=8.90
0.9 2.46 L=2.75-90/2-70/2=1.95
0.15 0.44 L=2.70+(2*.10)=2.90
Total 31.35

0.54 7.16 L=4.00-.10=3.90


B=3.50-.10=3.40
H=60+2.8=54
0.54 8.22 L=8.20-.30=7.90
0.54 10.23 B=2.75-.40/2-.30/2=2.40
Total 18.45

0.3 4.86 May be taken 1/3 of exclavation


0.3 2.75
0.3 1.87
0.3 0.82
0.15 0.44
Total 10.74

0.2 2.464 L=8.10+.70=8.80


0.1 1.044 L=8.80-.10=8.70
0.1 0.86 L=8.70-.10=8.60
0.8 5.44 L=8.60-.10=8.50
Total 9.808

0.2 1.512 L=4.30-.70=3.60


0.1 0.666 L=3.60+.10=3.70
0.1 0.57 L=3.70+.10=3.80
0.8 3.744 L=3.80+.10=3.90
Total 6.492

0.2 0.87 L=8.20+.50=8.70


0.1 0.344 L=8.70-.10=8.60
0.9 2.295 L=8.60-.10=8.50
Total 3.509

0.2 0.43 L=2.75-.50/2-.70/2=2.15


0.1 0.18 L=2.75-.40/2-.60/2=2.25
0.9 1.269 L=2.75-.30/2-.50/2=2.35
Total 1.879