Professional Documents
Culture Documents
Book1mansi Maanvi
Book1mansi Maanvi
2 C.C foundation in
Long wall 2 11.7 1.1
Short wall 3 5.2 1.1
1 25.74 L=10.6+1.1=11.7
1 17.16 L=6.3-1.1=5.2
Total 42.9
0.8 L=10.6+0.4=11
0.78 L=6.3-0.4=5.9
Total 15.88
0.96
deduct 14.92
4.2 27.986
4.2 22.68
Total 27.986
2.1 1.512
1.5 1.8
2.5 0.6 Back of shelves 10cm thick wall
0.15 0.135 Bearing 15cm
0.15 0.234 Bearing 15cm
0.15 0.117 Bearing 15cm
Total 4.398
SUBMITTED BY
NAME-MANASI BHESRA
BRANCH-CIVIL ENGINEERING
SEMESTER-3RD
GROUP-1
ROLL NO-F22117001030
TOPIC-DOUBLE BUILDING ROOM
(Long wall short wall method)
Sl No Description No Length(m) Breadth(m) Height(m)
1 Earth work in exclavation
Long wall 2 11.7 1.1 1
Short wall 3 5.2 1.1 1
Total
2 Cement concrete in foundation
Long wall 2 6.2 0.9 0.3
Short wall 3 3.4 0.9 0.3
Total
3 Brick work in foundation
Long wall
1st footing 2 10.2 0.9 0.25
2nd footing 2 10 0.7 0.1
3rd footing 2 9.9 0.6 0.2
4th footing 2 10.3 0.5 0.15
Plinth 2 9.7 0.4 0.8
Total
Short wall
1st footing 2 3.4 0.9 0.25
2nd footing 2 3.6 0.7 0.2
3rd footing 2 3.7 0.6 0.1
4th footing 2 3.8 0.5 0.15
plinth 2 3.9 0.4 0.8
Total
4 Brick work in super structure
Long wall 2 9.6 0.3 3.3
Short wall 2 4 0.3 3.3
Total
Quantity(m3) Remark
25.74 L=5.3+0.9=6.2
17.16 L=4.3-0.9=3.4
42.9
3.348 L=5.3+0.9=6.2
1.836 L=4.3-0.9=3.4
5.184
4.59 L=9.3+0.9=10.2
2.8 L=9.3+0.7=10
1.118 L=9.3+0.6=9.9
1.545 L=9.3+0.5=9.8
6.208 L=9.3+0.4=9.7
16.331
1.53 L=4.3-0.9=3.4
1.008 L=4.3-0.7=3.6
0.444 L=4.3-0.6=3.7
0.57 L=4.3-0.5=3.8
2.496 L=4.3-0.4=3.9
6.048
19.008 l=9.3-0.3=9.6
7.92 L=4.3-0.3=4
26.928
SUBMITTED BY
NAME-MANASI BHESRA
BRANCH-CIVIL ENGINEERING
SEMESTER-3RD
GROUP-1
ROLL NO-F22117001030
TOPIC-SINGLE ROOM BUILDING
(Long wall short wall method)
Sl no Particulars of item No Length(m) Breadth(m)
1 Earth work in exclavation in foundation 1 39 1.1
SUBMITTED BY
NAME-MANASI BHESRA
BRANCH-CIVIL ENGINEERING
SEMESTER-3RD
GROUP-1
ROLL NO-F22117001030
TOPIC-DOUBLE ROOM BUILDING
(Centre line method)
Sl no Particulars of item No Length(m) Breadth(m)
1 Earth work in exclavation in foundation 2 26 1.2
SUBMITTED BY
NAME-MANASI BHESRA
BRANCH-CIVIL ENGINEERING
SEMESTER-3RD
GROUP-1
REGD-F22117001030
TOPIC-
Sl no Particulars of item and details work No Length(m)
1 Earth work in exclavation and foundation
Long wall 2 5.3
Short wall 2 2.5
Verandah Pillars 3 0.7
Front wall 1 3.1
Side wall 2 1.55
Step 1 2.1
Step
1st step 1 2
2nd step 1 1.4
Deduct
Door opening 2 1
Window opening 3 1
Shelve 1 1
Ventilators 1 0.6
Breadth(m) Height(m) Quantity(m3) Remark
0.4 3.92
0.4 2.32
Total 6.24
0.4 0.48
Total 6.72
0.4 0.8
Deduct 5.92
0.3 2 1.2
0.3 1.4 1.26
0.2 1.7 0.34
0.3 0.3 0.054
Total 2.854
SUBMITTED BY
NAME-MANASI BHESRA
BRANCH-CIVIL ENGINEERING
SEMESTER-3RD
REGD-F22117001030
TOPIC-SINGLE ROOM WITH FRONT VERANDAH
VERANDAH
Sl no Particulars of item No Length(m)
1 Earth work in exclavation in
Breadth(m) Height(m) Quantity(m3)
Remark
Sl no Particulars of item No Length(m) Breadth(m)
1 Earth work in exclavation in foundation
Rooms
Long wall 2 9 0.9
Short wall 3 3.4 0.9
Verandah front 1 8.9 0.7
Verandah sides 2 1.95 0.7
Step 1 2.9 1
Short walls
1st footing 3 3.6 0.7
2nd footing 3 3.7 0.6
3rd footing 3 3.8 0.5
Plinth wall 3 3.9 0.4
Verandah
Front wall(long)
1st footing 1 8.7 0.5
2nd footing 1 8.6 0.4
Plinth wall 1 8.5 0.3
Side wall(short)
1st footing 2 2.15 0.5
2nd footing 2 2.25 0.4
Plinth wall 2 2.35 0.3
5