Girder 2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1294.

00

120.00

127.50 70.00
20.00

UT
CL
O
AY
SL
ER
IRD
-G 127,5
-PS
AN
PL
O
IN GT
RD
CO
S AC Notes
RIE
VA
1. installation of beam and casting of deck slab concrete should
10
not be more than 6 months after prestress transfered
10
3Ø 15.24 mm debonded/2.50m from 2. prestress strands diameter15.24mm ( 0.6 ") low relaxation G 270
5

3. intial prestressing force is 197.08 kN / strand before losses


5
support
4. concrete compressive strength 45 N / mm² .
5. prestress transfer should be after the concrete reaches
0.85 fc = 38 N/mm²
20
8Ø 15.24mm debonded /3.75m from 6. design loading standard ISSRB
65

support 7. 6 holes each side of 20 mm diameter 2 should be


120

provided for diaphrams as shown


8. all dimention are in metric system
9. each lifting hook is of two strand of 2x0.6" diameter each arm of
6Ø 15.24mm debonded /5.25m from strand should be embeded 90 cm in to concrete and the strand 7
support wires should separated 20 cm from the end to secured bonding
10

10.Angle of skew at girder ends and other dimensions should


measured from dwg. ABI-B-04(plan-ps-girders layout)
5 5

20
10,8
7

8Ø 15.2mm non-debonded strands .


10 5 5 5 5 5

70

STRANDS PATTERN
TYPE :25 STRANDS Ø15.24