This document provides a work schedule for a special school classroom project in 90 working days from December 4, 2023 to March 16, 2024. It involves site mobilization, substructure work including excavation, masonry, and concrete work. Superstructure work includes further concrete work, block work, roofing, carpentry, joinery, and metal work. The project aims to be completed within the scheduled time through detailed planning of interdependent tasks.
This document provides a work schedule for a special school classroom project in 90 working days from December 4, 2023 to March 16, 2024. It involves site mobilization, substructure work including excavation, masonry, and concrete work. Superstructure work includes further concrete work, block work, roofing, carpentry, joinery, and metal work. The project aims to be completed within the scheduled time through detailed planning of interdependent tasks.
This document provides a work schedule for a special school classroom project in 90 working days from December 4, 2023 to March 16, 2024. It involves site mobilization, substructure work including excavation, masonry, and concrete work. Superstructure work includes further concrete work, block work, roofing, carpentry, joinery, and metal work. The project aims to be completed within the scheduled time through detailed planning of interdependent tasks.
Client: Hurumu Woreda Education Office Contractor: Abebaw, Mintamir, Bizunesh and Friends BC SME ID Task Name Duration Start Finish Dec '23 Jan '24 Feb '24 Mar '24 Apr ' 26 3 10 17 24 31 7 14 21 28 4 11 18 25 3 10 17 24 1 Project: Tomorrow's Foundation School Class Room 90 days Mon 12/4/23 Sat 3/16/24 2 Site Mobilization 3 days Mon 12/4/23 Wed 12/6/23 3 A. SUB STRUCTURE 35 days Thu 12/7/23 Tue 1/16/24 4 1. EXCAVATION AND EARTH WORK 31 days Thu 12/7/23 Thu 1/11/24 5 1.1 clear the site (top 200mm thick) 2 days Thu 12/7/23 Fri 12/8/23 6 1.2 excavate bulck (avg. depth of 150cm) 3 days Fri 12/8/23 Mon 12/11/23 7 1.3 excavate trench (depth up to 150cm) 4 days Tue 12/12/23 Fri 12/15/23 8 1.4 back fill around masonary foundation and under hardcore 2 days Tue 1/2/24 Wed 1/3/24 9 1.5 cart away excavated material 2 days Thu 1/4/24 Fri 1/5/24 10 1.6 250mm thick basaltic stone hard core 3 days Tue 1/9/24 Thu 1/11/24 11 2. MASONRY WORK 13 days Mon 12/18/23 Mon 1/1/24 12 2.1 50cm thick trachytic masonary BNGL 6 days Mon 12/18/23 Sat 12/23/23 13 2.2 50cm thick trachytic masonary ANGL 7 days Mon 12/25/23 Mon 1/1/24 14 3.CONCRETE WORK 27 days Sat 12/16/23 Tue 1/16/24 15 3.1 50mm thick C-5 lean concrete under Foundation Wall 2 days Sat 12/16/23 Mon 12/18/23 16 3.2 C-25 reinforced concrete filled into formwork 10 days Fri 1/5/24 Tue 1/16/24 17 a) In grade beam 3 days Fri 1/5/24 Mon 1/8/24 18 b) In 100mm thick ground floor slab 3 days Sat 1/13/24 Tue 1/16/24 19 3.3 Provide, cut & fix in position form work 4 days Thu 1/4/24 Mon 1/8/24 20 a) to grade beam 4 days Thu 1/4/24 Mon 1/8/24 21 3.4 Mild steel reinforcement 8 days Fri 1/5/24 Sat 1/13/24 22 a) dia 8mm deformed barfor ground slab 2 days Fri 1/12/24 Sat 1/13/24 23 b) dia 12mm deformed bar 4 days Fri 1/5/24 Tue 1/9/24 24 B. SUPER STRUCTURE 62 days Fri 1/5/24 Sat 3/16/24 25 1.CONCRETE WORKS 22 days Fri 1/5/24 Tue 1/30/24 26 1.1 C-25 reinforced concrete filled into formwork 11 days Thu 1/18/24 Tue 1/30/24 27 a. to elevation column 4 days Thu 1/18/24 Mon 1/22/24 28 b. to top tie beam 5 days Thu 1/25/24 Tue 1/30/24
NB: 90days for Project Completion are Only Working Days
Hubachiisa: Goyyootiin 90 Hojii itti Xumuruuf Ibsaman, Guyyoolee Hojii qofa Page 1 WORK SCHEDULE (KAROORA HOJII) Project: Special School Class Room Client: Hurumu Woreda Education Office Contractor: Abebaw, Mintamir, Bizunesh and Friends BC SME ID Task Name Duration Start Finish Dec '23 Jan '24 Feb '24 Mar '24 Apr ' 26 3 10 17 24 31 7 14 21 28 4 11 18 25 3 10 17 24 29 1.2 Provide, cut & fix in position form work 10 days Wed 1/17/24 Sat 1/27/24 30 a. to elevation column 4 days Wed 1/17/24 Sat 1/20/24 31 b. to top tie beam 5 days Tue 1/23/24 Sat 1/27/24 32 1.3 Mild steel reinforcement 21 days Fri 1/5/24 Mon 1/29/24 33 1.31 in elivation column 4 days Fri 1/5/24 Tue 1/9/24 34 a) dia 6mm plain bar for stirrup 4 days Fri 1/5/24 Tue 1/9/24 35 b) dia 12mm deformed bar 4 days Fri 1/5/24 Tue 1/9/24 36 1.32 in top tie beam 4 days Thu 1/25/24 Mon 1/29/24 37 a) dia 6mm plain bar for stirrup 4 days Thu 1/25/24 Mon 1/29/24 38 b) dia 12mm deformed bar 4 days Thu 1/25/24 Mon 1/29/24 39 2. BLOCK WORK 7 days Tue 2/13/24 Tue 2/20/24 40 2.1 200mm thick Class B HCB wall 7 days Tue 2/13/24 Tue 2/20/24 41 2.2 Ditto but 150mm thick 4 days Tue 2/13/24 Fri 2/16/24 42 3.ROOFING 34 days Wed 2/7/24 Sat 3/16/24 43 3.1 G-30 Roofing cover 5 days Wed 2/7/24 Mon 2/12/24 44 3.2 dia 110mm PVC down pipe 1 day Sat 3/16/24 Sat 3/16/24 45 3.3 G-28 ribbed sheet ceiling under eave 2 days Sat 3/2/24 Mon 3/4/24 46 3.4 G-28 flat iron Metal gutter 1 day Tue 3/5/24 Tue 3/5/24 47 3.5 Flush type internal Wood Door; D2 size:- 90cmX280cm 1 day Thu 3/14/24 Thu 3/14/24 48 4.CARPENTORY AND JOINARY 28 days Thu 2/1/24 Mon 3/4/24 49 4.1 10-12dia wooden lower and upper 2 days Thu 2/1/24 Fri 2/2/24 50 4.2 8-10cm dia wooden vertical and diagonal chord member 2 days Fri 2/2/24 Sat 2/3/24 51 4.3 5x7cm zigba wood purlins 2 days Mon 2/5/24 Tue 2/6/24 52 4.4 10mm thick chipwood ceiling 4 days Thu 2/29/24 Mon 3/4/24 53 4.5 Fascia board 250x25mm 2 days Thu 2/29/24 Fri 3/1/24 54 5.METAL WORK 20 days Thu 2/1/24 Fri 2/23/24 55 5.1 door and windows fabrication (welding) 12 days Thu 2/1/24 Wed 2/14/24 56 5.2 installing and finishing work for doors and windows 3 days Wed 2/21/24 Fri 2/23/24
NB: 90days for Project Completion are Only Working Days
Hubachiisa: Goyyootiin 90 Hojii itti Xumuruuf Ibsaman, Guyyoolee Hojii qofa Page 2 WORK SCHEDULE (KAROORA HOJII) Project: Special School Class Room Client: Hurumu Woreda Education Office Contractor: Abebaw, Mintamir, Bizunesh and Friends BC SME ID Task Name Duration Start Finish Dec '23 Jan '24 Feb '24 Mar '24 Apr ' 26 3 10 17 24 31 7 14 21 28 4 11 18 25 3 10 17 24 57 6. FINISHING 19 days Wed 2/21/24 Wed 3/13/24 58 6.1 30mm thick cement sand screed 3 days Tue 3/5/24 Thu 3/7/24 59 6.2 Three coats of plastering to internal walls, beam and column 7 days Wed 2/21/24 Wed 2/28/24 60 6.3 Two coats of plastering to external wall surface 5 days Wed 2/21/24 Mon 2/26/24 61 6.4 3x25cm terrazo window sill 1 day Fri 2/23/24 Fri 2/23/24 62 6.5 100cm wide and 15cm thick C-20 concrete around building 2 days Fri 3/8/24 Sat 3/9/24 63 6.6 C-25 concrete pipe of rectangular ditch 3 days Mon 3/11/24 Wed 3/13/24 64 7. GLAZING 1 day Sat 3/16/24 Sat 3/16/24 65 7.1 4mm thick clear glass 1 day Sat 3/16/24 Sat 3/16/24 66 7.2 6mm thick figured glass 1 day Sat 3/16/24 Sat 3/16/24 67 8. PAINTING 6 days Sat 3/9/24 Fri 3/15/24 68 8.1 Three coats of plastic emultion paint to internal plastered 4 days Tue 3/12/24 Fri 3/15/24 surface, external beam & columns 69 8.2 Ditto but to Chipwood ceiling 2 days Sat 3/9/24 Mon 3/11/24 70 8.3 Three coats of synthetic enamel paint to ceiling under eave 1 day Sat 3/9/24 Sat 3/9/24 71 9. EECTRICAL INSTALLATION 1 day Sat 3/16/24 Sat 3/16/24 72 9.1 Flush mounted SDB 1 day Sat 3/16/24 Sat 3/16/24 73 9.2 Surface mounted light point fed through PVC 1 day Sat 3/16/24 Sat 3/16/24 74 9.3 Fluish mounted Two way 10Amp switch 1 day Sat 3/16/24 Sat 3/16/24 75 9.4 Surface mounted Socket outlet 1 day Sat 3/16/24 Sat 3/16/24 76 9.5 Telephone point fed through PVC 1 day Sat 3/16/24 Sat 3/16/24 77 9.6 Phillips Florecent 1 day Sat 3/16/24 Sat 3/16/24 78 9.7 Earthing System 1 day Sat 3/16/24 Sat 3/16/24