SOLAR INSTALLATION

SIME DARBY (PULAU CAREY)

HSE PROGRESS REPORT


FROM 1ST AUGUST 2023 – 31ST AUGUST 2023

PREPARED BY,

…………………………………..

(KOVAIKARTHIK A/L RAMAN)


SITE SAFETY SUPERVISOR
SIME DARBY PULAU CAREY
LEADING SAFETY INDICATOR

TOTAL MANHOURS HOURS HOURS HOURS

TOTAL HEADCOUNT HC HC HC

WORKERS INDUCTED
HC HC HC

NO OF TBM

FIRST AID CASE

PROPERTY DAMAGE

RECORDABLE CASE
TOOLBOX MEETING
TOOLBOX MEETING
HARNESS QUALITY CHECKING
HARNESS QUALITY CHECKING
HOUSEKEEPING ACTIVITIES
MONTHLY LORRY CRANE INSPECTION

(Documents attached: Reference 1.0)


MONTHLY SKYLIFT INSPECTION

(Documents attached: Reference 2


ATTACHMENTS
ATTACHMENTS
ATTACHMENTS
Skylift Checklist
______________
Date : Page :

LIFTING CHECKLIST No: ______ PROJECT:____________________ Date:________

(I) DESCRIPTION OF CRANE (MOBILE / TOWER / CRAWLER / SKYLIFT )


Crane ID:_______________________ Expiry Date:______________________
PMA No:_______________________ Crane SWL:______________________
(II) SCOPE OF LIFTING OPERATION
Types of Load:_______________________ Time of Operation:_________________
Pre-approved Weight of Load:___________ Communication Needs:_____________
Weight Constraint:________________ No Lift Zone:_____________________
Load Lift-off Point:_______________ Designated Crane Access:___________
(III) DOCUMENT TO BE SUBMITTED TO SAFETY & HEALTH OFFICER
Certificate of Competency Safety Undertaking Letter
Crane Operator Crane Operator
Crane PMA Signalman
Signalman

Safety Control Measures Checklist


Barricade Crane Checklist
Signage Wire Rope Checklist
Tool Box Meeting Chain Sling Checklist
Webb Sling Checklist

(IV) LIST OF QUALIFIED PERSONNEL FOR LIFTING OPERATION


Lifting Supervisor Crane Operator
Name
Company
Signature
Date
(v) APPROVAL BY NIAGA SARI SDN BHD
PIC Checked By Approved by
Electrical Tools Checklist
______________
Date : Page :

Project: Model:
Owner: Inspection By:
Type of Tool:

DATE / MONTH
ITEMS CHECKED

Overall condition
Double insulated industrial-type cable
Industrial- type socket / plug
Earthing completed
Proper connection to ELCB
Connection by electrician
ELCB secured / enclosed
Cable laid above water
Equipment serviced periodic
Maintenance done
Training provided to user
Personal Protective Equipments
Lorry Checklist
______________
Date : Page :

Project: Operator : IC No:


License No: Model: Reg No:
Co: Tonnage: Validity:

DATE / MONTH
ITEM CHECKED
Engine Condition
Hydraulic Condition
Engine Oil Level
Water Level
Tire Condition
Driver Cabin Condition
Brake Function
Hand Brake Function
Meter Function
Main Body Condition
Headlight
Reverse Light
Tire Stopper
Plastic Top Cover
Safety Boot
Safety Helmet
Safety Belt

( S ) INSPECTED &
( R ) REPAIR REQUIRED ( N/A ) NOT APPLICABLE
SATISFACTORY

INSPECTION BY: WITNESSED BY:


NAME NAME
POSITION: POSITION:
SIGN SIGN