PROPOSED

WORK SCOPE
COST OF INSTALLATION OF NEW CP SYSTEM FOR AFIESERE COMPRESSOR

S/N ITEM DESCRIPTION UNIT QTY UNIT TOTAL (N)


PRICE(N)
Mobilization /Demobilization LS -
Soil Resistivity/Geophysical test LS 1
CP system Design LS 1
Drilling of Deep well LS 1
Procurement/Installation of T/R LS 1
Procurement of mixed metal oxide Per Anode 10
Anodes
Coke Breeze Per Bag 30
70mm2 multi stranded Single core cable Per Meter 100
35mm2 multi stranded Single core cable Per meter 100

16mm2multi stranded Single core cable Per meter 100


12'' stove PVC Casing Per casing 1
8'' Steel Casing Per casing 4
8'' PVC Casing Per casing 14
Provide and install float collar Per piece 1
Positive Junction Box Per box 1
Negative Junction Box Per box 1
Casting of deep well manhole Per piece 1
Cable lugs/Bolts and Nuts LS -
Shelter for deep well/fence Per T/R 1
Shelter for T/R / Plinth Per T/R 1
Excavation/backfilling of cable trenches Per meter 100
Header works LS -
Ground bed Resistance test LS -
Investigate and rectify the causes of low Per line 42
CP potential on all gas lift lines
Clear bushy right of way to existing deep Per G/B 1
well
Hookup of severed cables to gas well 5&6 Per line 2
Service drain points terminal to gas lines Per line 42
Potential Measurement Per Point 2
Line Current Measurement Per Point 14
Cable Marker Per piece 10
Pre- commissioning LS -
Commissioning LS -
Report LS -
CP Engineer 1 7
CP Technicians 2 7
Chief Driller 1 7
Driller 8 7
Safety Officer 1 7
Driver 1 7
Hilux 1 7
Truck 1 1
Self-loader 1 1
SUB –TOTAL
7.5% VAT
TOTAL

COST OF REMEDIAL ACTION/REPAIR FOR ERIEMU FIELD


S/N ITEM DESCRIPTION UNIT QTY UNIT TOTAL (N)
PRICE(N)
Mobilization /Demobilization LS -
Investigate and rectify the causes of Per T/R 1
faulty voltage meter on T/R
Replace discharged silica gel Per T/R 1
Hookup of severed cables to gas well 3&5 Per line 2
Replacement of output meters housing Per T/R 1
Potential measurement Per line 22
Line current measurement Per line 22
Technician Per tech 2
Safety officer Per 1
Driver per 1
HILUX Per day 1
SUB-TOTAL
7.5% VAT
TOTAL

COST OF INSTALLATION OF NEW CP SYSTEM AND REMEDIAL ACTION FOR


KOKORI FIELD
S/N ITEM DESCRIPTION UNIT QTY UNIT TOTAL (N)
PRICE(N)
Mobilization /Demobilization LS -
Soil Resistivity/Geophysical test LS 1
CP system Design LS 1

Drilling of Deep well LS 1


Repair existing T/R Without output Per T/R 1
Procurement of mixed metal oxide Per Anode 10
Anodes
Coke Breeze Per Bag 30
70mm2 multi stranded Single core cable Per Meter 100
35mm2 multi stranded Single core cable Per meter 100

16mm2multi stranded Single core cable Per meter 100


12'' stove PVC Casing Per casing 1
8'' Steel Casing Per casing 4
8'' PVC Casing Per casing 14
Provide and install float collar Per piece 1
Positive Junction Box Per box 1
Negative Junction Box Per box 1
Casting of deep well manhole Per piece 1
Cable lugs/Bolts and Nuts LS -
Shelter for deep well/fence Per T/R 1
Excavation/backfilling of cable trenches Per meter 100
Header works LS -
Ground bed Resistance test LS -
Investigate and rectify the causes of low Per line 42
CP potential on all gas lift lines
Clear bushy right of way to existing deep Per G/B 1
well
Investigate and rectify the causes of low Per line 50
CP potential on all gas lift/ Flow lines
Clear bushy right of way to existing deep Per G/B 1
well
Hookup of severed cables to gas well Per line 1
HUR1
Service drain points terminal to gas/flow Per line 35
lines
Bury exposed drain cables to gas lift lines LS 1
Re-wrap failed riser coating to all F/L Per line 50
Re-wrap failed riser coating to all G/L Per line 35
Re-wrap failed riser coating to all D/L Per line 1
Disconnect all drain cables inside falling LS 1
32way JB and re-mount with concrete,
terminate and paint box
Service drain points terminal to gas lines Per line 35
Potential Measurement Per Point 2
Line Current Measurement Per Point 14
Cable Marker Per piece 10
Pre- commissioning LS -
Commissioning LS -
Report LS -
CP Engineer 1 7
CP Technicians 2 7
Chief Driller 1 7
Driller 8 7
Safety Officer 1 7
Driver 1 7
Hilux 1 7
Truck 1 1
Self-loader 1 1
SUB –TOTAL
7.5% VAT
TOTAL

COST OF REMEDIAL ACTION/REPAIR FOR OLOMORO FLOWSTATION


S/N ITEM DESCRIPTION UNIT QTY UNIT TOTAL (N)
PRICE(N)
Mobilization /Demobilization LS -
Re-wrap failed riser coating to all F/S Per line 49
Technician Per tech 2
Safety officer Per 1
Driver per 1
HILUX Per day 1
SUB-TOTAL
7.5% VAT
TOTAL

COST OF REMEDIAL ACTION/REPAIR FOR OLOMORO COMPRESSOR

S/N ITEM DESCRIPTION UNIT QTY UNIT TOTAL (N)


PRICE(N)
Mobilization /Demobilization LS -
Hookup severed drain cable Per line 1
Line current measurement Per line 22
Potential measurement Per line 22
Technician Per tech 2
Safety officer Per 1
Driver per 1
HILUX Per day 1
SUB-TOTAL
7.5% VAT
TOTAL
COST OF REMEDIAL ACTION/REPAIR FOR OWEH FLOWSTATION

S/N ITEM DESCRIPTION UNIT QTY UNIT TOTAL (N)


PRICE(N)
Mobilization /Demobilization LS -
Re-wrap failed riser coating to all F/S Per line 32
Technician Per tech 2
Safety officer Per 1
Driver per 1
HILUX Per day 1
SUB-TOTAL
7.5% VAT
TOTAL

COST OF INSTALLATION OF NEW CP SYSTEM AND REMEDIAL ACTION FOR UZERE


FLOW/ COMPRESSOR
S/N ITEM DESCRIPTION UNIT QTY UNIT TOTAL (N)
PRICE(N)
Mobilization /Demobilization LS -
Soil Resistivity/Geophysical test LS 1
CP system Design LS 1
Drilling of Deep well LS 1
Procurement/Installation of T/R LS 1
Procurement of mixed metal oxide Per Anode 10
Anodes
Coke Breeze Per Bag 30
70mm2 multi stranded Single core cable Per Meter 100
35mm2 multi stranded Single core cable Per meter 100

16mm2multi stranded Single core cable Per meter 100


12'' stove PVC Casing Per casing 1
8'' Steel Casing Per casing 4
8'' PVC Casing Per casing 14
Provide and install float collar Per piece 1
Positive Junction Box Per box 1
Negative Junction Box Per box 1
Casting of deep well manhole Per piece 1
Cable lugs/Bolts and Nuts LS -
Shelter for deep well/fence Per T/R 1
Excavation/backfilling of cable trenches Per meter 100
Header works LS -
Ground bed Resistance test LS -
Investigate and rectify the causes of low Per line
CP potential on all gas lift/flow lines
Replace contaminated oil to T/R Per Drum
Re-wrap failed riser coating to 6'' & 8'' Per line 2
D/Lines
Replace faulty volt meter Per meter 1
Service drain points terminal to gas lines Per line 20
Hookup of severed cables to gas well 5&6 Per line 2
Service drain points terminal to gas lines Per line 42
Potential Measurement Per Point 2
Line Current Measurement Per Point 14
Cable Marker Per piece 10
Pre- commissioning LS -
Commissioning LS -
Report LS -
CP Engineer 1 7
CP Technicians 2 7
Chief Driller 1 7
Driller 8 7
Safety Officer 1 7
Driver 1 7
Hilux 1 7
Truck 1 1
Self-loader 1 1
SUB –TOTAL
7.5%VAT
TOTAL

COST OF REMEDIAL ACTION/REPAIR FOR UZERE MFD FLOWEHSTATION

S/N ITEM DESCRIPTION UNIT QTY UNIT TOTAL (N)


PRICE(N)
Mobilization /Demobilization LS -
Arrange to replace T/R in this manifold Per T/R 1
Technician Per day 2
Safety officer Per day 1
HILUX Per day 1
Self-loader Per day 1
SUB-TOTAL
7.5% VAT
TOTAL

COST OF INSTALLATION OF NEW CP SYSTEM AND REMEDIAL ACTION FOR ORONI


FLOWSTATION

S/N ITEM DESCRIPTION UNIT QTY UNIT TOTAL (N)


PRICE(N)
Mobilization /Demobilization LS -
Soil Resistivity/Geophysical test LS 1
CP system Design LS 1
Drilling of Deep well LS 1
Procurement of mixed metal oxide Per Anode 10
Anodes
Coke Breeze Per Bag 30
70mm2 multi stranded Single core cable Per Meter 100
35mm2 multi stranded Single core cable Per meter 100

16mm2multi stranded Single core cable Per meter 100


12'' stove PVC Casing Per casing 1
8'' Steel Casing Per casing 4
8'' PVC Casing Per casing 14
Provide and install float collar Per piece 1
Positive Junction Box Per box 1
Negative Junction Box Per box 1
Casting of deep well manhole Per piece 1
Cable lugs/Bolts and Nuts LS -
Shelter for deep well/fence Per T/R 1
Excavation/backfilling of cable trenches Per meter 100
Header works LS -
Ground bed Resistance test LS -
Investigate and rectify the causes of low Per line 15
CP potential on all flow lines
Clear bushy right of way to deep well Per G/B 1
Troubleshoot T/R without DC output Per line 1
Re-wrap failed riser coating to 8'' D/Lines Per line 1
Potential Measurement Per Point 2
Line Current Measurement Per Point 14
Cable Marker Per piece 10
Pre- commissioning LS -
Commissioning LS -
Report LS -
CP Engineer 1 7
CP Technicians 2 7
Chief Driller 1 7
Driller 8 7
Safety Officer 1 7
Driver 1 7
Hilux 1 7
Truck 1 1
Self-loader 1 1
SUB –TOTAL
7.5% VAT
TOTAL

COST OF REMEDIAL ACTION/REPAIR FOR EVWERENI FIELD


S/N ITEM DESCRIPTION UNIT QTY UNIT TOTAL (N)
PRICE(N)
Mobilization /Demobilization LS -
Arrange to paint 3nos JB and T/R LS -
Provide 120m 16mm2 cable and hookup Per line 5
5nos Gaslift lines to CP system
Clear bushy right of way to deep well Per G/B 1
Re-wrap failed riser coating to all Per line 41
flowlines
Potential measurement Per line 82
Line current measurement Per line 41
HILUX Per day 4
Technician Per day 4
Safety officer Per day 4
SUB-TOTAL
7.5%VAT
TOTAL

COST OF REMEDIAL ACTION/REPAIR FOR UPS FIELD

S/N ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL (N)


(N)

1 Mobilization/Demobilization LS 1
2 Excavate and re-Wrap failed riser Per line 9
coating to 7 No's delivery and Trunk
lines

3 Potential measurements per line 7

4 Line current measurements Per line 7

5 Hilux Per Day 5

6 Technician Per Day 5

7 Safety officer Per Day 5

SUB-TOTAL

7.5%

TOTAL

MATERIALS

S/N ITEM DESCRIPTION QUANTITY MAKE


1 Tripod stand 1 -
2 Drilling pump 4 -
3 Multi meter 2 Fluke
4 Current clamp 2 Fluke
5 Reference cell 2 MC Miller
6 Soil resistivity meter 1 Megger
7 Electrical tool box 1 RS
8 Mechanical tool box 1 -
9 Cable reel 1 -
10 Crimping tool 1 -