MATERIALES

DESCRIPCIÓN CANTIDAD P.U


VARILLA DE 5/8 40.00 55.50
VARILLA DE 1/2 80.00 41.03
VARILLA DE 3/8 64.00 20.01
VARILLA DE 11/4 12.00 8.07
ALAMBRE #16 50.00 20.01
CLAVOS DE 2 1/2 15.00 8.00
CLAVOS DE 4 10.00 5.10
ALAMBRE #08 30.00 5.00
CEMENTO 200.00 32.81
YESO 1.00 10.00
ARENA GRUESA 16.00 60.00
PIEDRA CHANCADA 12.00 120.00
HORMIGON 8.00 65.00
PIEDRA PILCA 7.00 75.00
LADRILLO 18 HUECOS 3000.00 0.75
TUBOS DE 3 PULG 3.00 34.90
TUBOS DE 2 PULG. 2.00 86.90
TUBOS DE 4 PULGADAS 1.00 31.90
1 und de socate 1.00
1 foco led de 15 w 1.00
cinta aislante 1.00
FLETE
plasticos

PRESUPUESTO DE MANO DE OBRA


COSTO: LA CANTIDAD
MATERIALES
TOTAL
ERIALES
TOTAL cant-. Real p.u real total SALDO
2219.80 40.00 57.55 2302.04 0.00 57.551 0
3282.40 80.00 37.21 2976.72 0.00 37.21 0
1280.77 64.00 20.75 1328.19 0.00 20.75 0
96.84 12.00 8.37 100.40 0.00 8.37 0
1000.60 50.00 3.88 193.75 0.00 3.88 0
120.00 15.00 4.41 66.09 0.00 4.41 0
51.00 10.00 4.41 44.06 0.00 4.41 0
150.00 30.00 3.88 116.25 0.00 3.88 0
6562.60 200.00 33.65 6730.60 0.00 33.65 0
10.00 1.00 10.00 10.00 0.00 10.00 0
960.00 12.00 60.00 720.00 4.00 60.00 240
1440.00 8.00 120.00 960.00 4.00 120.00 480
520.00 8.00 65.00 520.00 0.00 65.00 0
525.00 7.00 75.00 525.00 0.00 75.00 0
2250.00 3000.00 0.77 2310.00 0.00 0.77 0
104.70 3.00 33.92 101.77 0.00 33.92 0
173.80 2.00 14.52 29.04 0.00 14.52 0
31.90 1.00 34.13 34.13 0.00 34.13 0
1.00 10.13 10.13 0.00 10.13 0
1.00 9.29 9.29 0.00 9.29 0
1.00 1.93 1.93 0.00 1.93 0
1.00 240.00 240.00 0.00 240.00 0
0.00 0.00 0.00 0

20779.408 19329.398
12530

14655.00
20779.41
35434.41
MATERIALES
DESCRIPCIÓN cant-. Real p.u real
VARILLA DE 5/8 40.00 57.55
VARILLA DE 1/2 80.00 37.21
VARILLA DE 3/8 64.00 20.75
VARILLA DE 11/4 12.00 8.37
ALAMBRE #16 50.00 3.88
CLAVOS DE 2 1/2 15.00 4.41
CLAVOS DE 4 10.00 4.41
ALAMBRE #08 30.00 3.88
CEMENTO 200.00 33.65
YESO 1.00 10.00
ARENA GRUESA 16.00 75.00
PIEDRA CHANCADA 13.00 120.00
HORMIGON 8.00 75.00
PIEDRA PILCA 7.00 80.00
LADRILLO 18 HUECOS 3000.00 0.77
TUBOS DE 3 PULG 3.00 33.92
TUBOS DE 2 PULG. 2.00 14.52
TUBOS DE 4 PULGADAS 1.00 34.13
1 und de socate 1.00 10.13
1 foco led de 15 w 1.00 9.29
cinta aislante 1.00 1.93
FLETE 1.00 240.00
plasticos 1.00 30.00
MANO DE OBRA 1.00 7050.00
GUARDIANIA 28-8-23 AL 3-9-23 1.00 300.00

PRESUPUESTO DE MANO DE OBRA


COSTO: LA CANTIDAD
MATERIALES
TOTAL
total
2302.04
2976.72
1328.19
100.40
193.75
66.09
44.06
116.25
6730.60
10.00
1200.00
1560.00
600.00
560.00
2310.00
101.77
29.04
34.13
10.13
9.29
1.93
240.00
180.00
7050.00
300.00

28054.398
7704.00
35758.40

AG 12.00 75.00 900.00


P.C 8.00 120.00 960.00
HORMIGON 8.00 75.00 600.00
PIEDRA PILCA 7.00 80.00 560.00
3020.00
AG 4 75 300
AP.C 4 120 480
780
DESAGREDADO DE GASTOS

FECHAS DESCRIPCIÓN N° DE FACTURAS


27-Aug ADELANTO OBISPO
28-Aug COMPRAS QUIROGA FAC. N° 004-00049291
28-Aug FLETE FAC. N° 004-00049292
28-Aug COMPRAS QUIROGA FAC. N° 004-00049294
30-Aug PLASTICO FERRETERIA LA PRIMAVERA
29-Aug AGREGADO
29-Aug PLASTICO FERRETERIA LA PRIMAVERA
29-Aug COMPRAS QUIROGA FAC. N°004-00049310
30-Aug FLETE FAC.0004-0049311
1-Sep AGREGADO 01-09
1-Sep ADELANTO OBISPO
2-Sep GUARDIANIA
28-Aug ARREGLO DE MEZCLADORA + ACEITE
PASAJE DIANA

SALDO

36000 36000.07
PRECIO
2550.00
4197.46
80.00
30.41
80.00
3020.00
100.00
12156.00
160.00
975.00
4500.00
300.00
100.00
100.00
28348.87
7651.20
36000.07

-0.07
MATERIALES
DESCRIPCIÓN CANTIDAD
VARILLA DE 5/8 40.00
VARILLA DE 1/2 80.00
VARILLA DE 3/8 64.00
VARILLA DE 11/4 12.00
ALAMBRE #16 50.00
CLAVOS DE 2 1/2 15.00
CLAVOS DE 4 10.00
ALAMBRE #08 30.00
CEMENTO 200.00
YESO 1.00
ARENA GRUESA 17.00
PIEDRA CHANCADA 13.00
HORMIGON 8.00
PIEDRA PILCA 7.00
LADRILLO 18 HUECOS 3000.00
TUBOS DE 3 PULG 3.00
TUBOS DE 2 PULG. 2.00
TUBOS DE 4 PULGADAS 1.00
1 und de socate 1.00
1 foco led de 15 w 1.00
cinta aislante 1.00
TOMACORTIENTE DUPLEX 1.00
INTERRUPTOR DOBLE 1.00
FLETE 1.00
PLASTICO 1.00
MANO DE OBRA - ADELANTO 1.00
GUARDIANIA 28-8-23 AL 2-9-23 1.00
PASAJE DIANA DEL 28 DE AGOSTO AL 1 DE SEPT. 1.00
ARREGLO DE MAQUINA + ACEITE 1.00
PRESUPUESTO DE OBRAS HASTA LA FECHA 03-09-2023

VARILLAS DE DE 3/8 14
ARENA GRUESA 5
HORMIGON 4
FURGON 1
tubo de agua 1/2" 1
codo de pvc de 1/2" de 45° 2
codo de pvc de 1/2" de 90° 1
pasajes ida y vuelta diana 5
ploteos de planos 1
pegamento azul para tuberia 1
ADELANTO AL MAESTRO OBISPO 1
PAGO DE GUARDIANIA 1
pasajes de ida y vuelta diana 1
cemento 11
varillas de 3/8" 5

SALDO DE L MAESTRO OBISPO 3100


GUARDIANIA 150
MOTOFURGON 80
3330

RESTO 2183.47
LES
PRECIO UNITARIO TOTAL
57.55 2302.04
37.21 2976.72
20.75 1328.19
8.37 100.40
3.88 193.75
4.41 66.09
4.41 44.06
3.88 116.25
33.65 6730.60
10.00 10.00
75.00 1275.00
120.00 1560.00
75.00 600.00
80.00 560.00
0.77 2310.00
33.92 101.77
14.52 29.04
34.13 34.13
10.13 10.13
9.29 9.29
1.93 1.93
20.00 20.00
9.53 9.53
240.00 240.00
180.00
7050.00 7050.00
300.00 300.00
100.00 100.00
100.00 100.00
HA 03-09-2023 28355.93
36000.00
20.753 290.54
75 375.00
75 300.00
20 20.00
11.737 11.74
4.16 8.32
1.534 1.53
14 70.00 POR PAGAR OBISPO 3100.00
45 45.00 GUARDIANIA 3 DIAS 150.00
10.7 10.70 CALAMINA 6 155.40
4500 4500.00 REGRESO DE MATERIALES 80.00
300 300.00 REGRESO DE MEZCLADORA 150.00
85 85.00 ALQUILER DE SITIO 50.00
34.178 375.958 3685.40 2538.87
20.75 103.75
34853.47
1146.53
MATERIALES
DESCRIPCIÓN CANTIDAD P.U TOTAL COMPRO P.U TOTAL SALDO
TUBOS DE LUZ DE 3/4" 25.00 5.42 135.42 25.00 5.417 135.42
CURVAS DE LUZ DE 3/4" 35.00 0.61 21.31 35.00 0.609 21.31
CAJAS RETANGULARES 18.00 1.70 30.65 18.00 1.703 30.65
CAJA DE PASO DE 10X10 1.00 6.24 6.24 1.00 6.24 6.24
PIEDRA CHANCADA 19.00 120.00 2280.00 12.00 120 1440.00 7.00
ARENA GRUESA 18.00 75.00 1350.00 17.00 60 1020.00 1.00
HORMIGON 5.00 75.00 375.00 5.00 65 325.00
PIEDRA PILCA 4.00 80.00 320.00 4.00 75 300.00
VARILLA DE 5/8" 22.00 57.55 1266.12 22.00 57.55 1266.12
VARILLA DE 1/2" 21.00 37.21 781.39 21.00 37.21 781.39
VARILLA DE 3/8" 30.00 20.75 622.56 65.00 20.75 1348.88
VARILLA DE 1/4" 24.00 8.37 200.78 24.00 8.37 200.78
VARILLA DE N° 8 12.00 14.99 179.86 12.00 14.99 179.86
ALAMBRE DE #16 35.00 3.79 132.69 35.00 3.79 132.69 0.00
ALAMBRE DE #8 25.00 3.79 94.77 25.00 3.79 94.77
CLAVOS DE 21/2" 10.00 4.11 41.07 10.00 4.11 41.07
CLAVOS DE 4" 5.00 4.11 20.54 5.00 4.11 20.54
CEMENTO 160.00 33.65 5384.48 130.00 33.65 4374.89 30.00
TUBOS DE 1 PULGADA 3.00 21.65 64.94 3.00 21.648 64.94
CODOS DE 1 PULGADA 6.00 4.64 27.85 6.00 4.641 27.85
TUBOS DE 3/4" 4.00 15.55 62.22 4 15.554 62.22
TEE DE 3/4" 4.00 3.91 15.65 4 3.913 15.65
REDUCCION DE 3/4" A 1/2" 4.00 1.63 6.50 4 1.625 6.50
CODOS DE 1/2"DE EMBONE 12.00 1.53 18.41 12 1.534 18.41
TUBOS DE 1/4" 1.00 10.00 10.00 0.00
ADAPTADORES DE 1/2" 12.00 0.96 11.54 12 0.962 11.54
CODOS DE 1/2" GALVANIZADO 6.00 1.82 10.94 6 1.823 10.94
CINTA DE TEFLON 5.00 0.75 3.75 5 0.75 3.75
PEGAMENTO GRANDE DE AGUA FRIA 1.00 40.18 40.18 1 54.95 54.95
HOJA DE SIERRA 5.00 4.96 24.81 5 4.962 24.81
TUBO DE 4"PULGADAS 5.00 21.01 105.05 1 34.133 34.13
TUBOS DE 2" PULGADAS 5.00 14.52 72.60 5 14.52 72.60
CODOS4X90° 2.00 8.11 16.22 2 8.112 16.22
CODOS 2X90° 17.00 1.99 33.86 17 1.992 33.86
TEE DE 4 A 2 PULGADAS 5.00 8.99 44.94 5 8.988 44.94
TEE DE 4X4 PULGADAS 1.00 11.36 11.36 1 11.364 11.36
CODO SANITARIA DE 4 A 2 PULGADAS 1.00 10.51 10.51 1 10.512 10.51
YEE DE 2X2 PULGADAS 1.00 4.62 4.62 1 4.62 4.62
TUBOS DE 3 PULGADAS 6.00 33.92 203.54 6 33.924 203.54
CODOS DE 3X90° 4.00 3.33 13.33 4 6 24.00
LADRILLO KIN KON 18 HUECOS 2000.00 0.77 1540.00 2000.00 0.74 1480.00
CODOS DE 3X45° 2.00 4.90 9.79 2.00 4.90 9.79
MOVILIDAD 1.00 200.00 200.00 1.00 200.00 200.00
FLETE 1.00 240.00 240.00 1.00 240.00 240.00
UNIONES UNIVERSALES de 1/2 4.00 0.40 1.60 4.00 0.40 1.60
VALVULA DE PVC DE 1/2 4.00 6.24 24.96 4.00 6.24 24.96
NIPLES DE 1/2" X 11/2" PULGADAS 8.00 0.73 5.84 8.00 0.73 5.84
TUBO DE 1/2" 2.00 7.08 14.16 2.00 7.08 14.16
CODO DE 4 X 45° 2.00 5.00 10.00 2.00 5.00 10.00
movilidad diana 1.00 200.00 200.00 1.00 200.00 200.00
16362.77 14663.33

PRESUPUESTO DE MANO DE OBRA real PRESUPUESTO REAL 35000.00 DEPOSITO


MANO DE OBRA 15500.00 18000.00 32816.53 2183.47 DEUDA ANTERIOR
MATERIALES 16362.77 16362.77 35062.77 32816.53
GUARDIANIA LUNES A DOMINGO 700.00 700.00
SALDO DEL PRESUPUESTO ANTERIOR 2183.47 2183.47
TOTAL 32562.77 35062.77

9500.00
14140.64
850.00
24490.64

8325.89
1300.00
50.00 diana
200.00 diana
272.99
200.00 diana
147.34
200.00 diana
350.00 arena gruesa
50.00 pasaje
5555.56 SALDO CUENTA
MATERIALES
DESCRIPCIÓN CANTIDAD PRECIO UNITARIO TOTAL
LADRILLO DE TECHO 30X30X15 400.00 2.66 1062.00
VARILLA DE 5/8 40.00 58.54 2341.40
VARILLA DE 1/2 115.00 37.85 4352.18
VARILLA DE 3/8 93.00 21.31 1981.83
ALAMBRE #16 50.00 3.82 191.20
CLAVOS DE 21/2 10.00 4.11 41.07
CEMENTO MOCHICA AZUL 90.00 33.33 2999.88
ARENA GRUESA 12.00 75.00 900.00
PIEDRA CHANCADA 12.00 120.00 1440.00
TUBOS DE LUZ 3/4" 53.00 5.28 279.58
CURBAS DE LUZ 3/4 115.00 0.57 65.21
CAJAS OCTOGONALES DE LUZ 27.00 1.97 53.22
TUBOS DE DESAGUE DE 4" 2.00 33.51 67.02
TEE DE DESAGUE DE 4" 4.00 9.43 37.71
YEE DE 4 A 2 PULGADAS 4.00 9.66 38.66
CODOS DE DESAGUE DE 2" 2.00 8.75 17.49
YEE DE 2 " 3.00 4.54 13.63
CODOS DE DESAGUE DE 2X45 2.00 1.72 3.45
CODOS DE DESAGUE DE 2X90 22.00 3.50 77.00
TEE DE 2" 1.00 3.71 3.71
TUBOS DE AGUA DE 3/4" 3.00 15.27 45.81
TUBOS DE 1/2" 5.00 10.62 53.08
TEE DE 3/4 DE EMBONE 3.00 3.76 11.29
CODOS DE 3/4" DE EMBONE 2.00 4.00 8.00
REDUCCION DE 3/4 A 1/2" DE EMBONE 3.00 1.56 4.68
CODOS DE 1/2" DE EMBONE 20.00 1.48 29.50
PEGAMENTO DE AGUA FRIA 1.00 47.01 47.01
PASAJES DIANA 1.00 200.00 200.00
PRESUPUESTO DE MATERIALES DE TECHO 16165.58

PRESUPUESTO DE MANO DE OBRA


MANO DE OBRA 14000.00
MATERIALES 16165.58
GUARDIANIA LUNES A DOMINGO POR 10 DIAS 500.00
PRESUPUESTO DEL TECHO 30665.58

EN CUENTA 5550.5
SALDO DEL LO ANTERIOR OBISPO 6000 400
GUARDIANIA 8 DIAS S/ 1.00 S/ 400.00 S/ 400.00 GUARDIANIA 400 400
ARENA GRUESA M3 S/ 5.00 S/ 75.00 S/ 375.00 WATER 140
VARILLAD DE 3/8 S/ 35.00 S/ 20.75 S/ 726.25 6540 800
DESMONTE S/ 45.00 S/ 25.00 S/ 1,125.00
TANQUE DE 1200 M3 y accesorios S/ 1.00 S/ 750.00 S/ 750.00 SALDO 989.5
3376.25 1501.25
511.75

TOTAL 34041.83
MATERIALES
PRECIO CANT. DE
CANTIDAD TOTAL P.U. REAL TOTAL REAL
DESCRIPCIÓN UNITARIO MATERIALE
LADRILLO DE TECHO 30X30X15 400.00 2.66 1062.00 400.00 2.53 1012.00
VARILLA DE 5/8 40.00 58.54 2341.40 40.00 58.69 2347.52
VARILLA DE 1/2 115.00 37.85 4352.18 115.00 37.94 4363.56
VARILLA DE 3/8 93.00 21.31 1981.83 93.00 21.16 1968.16
VARILLA DE 1/4" 27.00 8.37 225.99 27.00 8.53 230.36
ALAMBRE #16 50.00 3.82 191.20 50.00 3.83 191.70
CLAVOS DE 21/2 10.00 4.11 41.07 10.00 4.12 41.18
CEMENTO MOCHICA AZUL 90.00 33.33 2999.88 20.00 33.653 673.06
ARENA GRUESA 9.00 60.00 540.00 9.00
PIEDRA CHANCADA 9.00 120.00 1080.00 9.00
TUBOS DE LUZ 3/4" 53.00 5.28 279.58 53.00 5.275 279.575
CURBAS DE LUZ 3/4 115.00 0.57 65.21 115.00 0.567 65.205
CAJAS OCTOGONALES DE LUZ 27.00 1.97 53.22 27.00 1.754 47.358
TUBOS DE DESAGUE DE 4" 2.00 33.51 67.02 2.00 33.512 67.024
TEE DE DESAGUE DE 4" 4.00 9.43 37.71 4.00
YEE DE 4 A 2 PULGADAS 4.00 9.66 38.66 4.00
CODOS DE DESAGUE DE 2" 2.00 8.75 17.49 2.00 1.992 3.98
YEE DE 2 " 3.00 4.54 13.63 3.00 4.62 13.86
CODOS DE DESAGUE DE 2X45 2.00 1.72 3.45 2.00 1.752 3.50
CODOS DE DESAGUE DE 2X90 22.00 3.50 77.00 22.00 1.992 43.82
TEE DE 2" 1.00 3.71 3.71 1.00 3.768 3.77
TUBOS DE AGUA DE 3/4" 3.00 15.27 45.81 3.00 15.554 46.66
TUBOS DE 1/2" 5.00 10.62 53.08 5.00 11.737 58.69
TEE DE 3/4 DE EMBONE 3.00 3.76 11.29 3.00 0.994 2.98
CODOS DE 3/4" DE EMBONE 2.00 4.00 8.00 2.00 2.847 5.69
REDUCCION DE 3/4 A 1/2" DE EMBONE 3.00 1.56 4.68 3.00 1.625 4.88
CODOS DE 1/2" DE EMBONE 20.00 1.48 29.50 20.00 1.534 30.68
PEGAMENTO DE AGUA FRIA 1.00 47.01 47.01 1.00 49.177 49.18
WATER 1.00 140.00 140.00 1.00 0.00
INSTALACION DE TANQUE - CASA
CODOS DE 3/4" DE EMBONE 7.00 2.85 19.93 7.00 2.85 19.93
TEE DE 3/4 DE EMBONE 4.00 3.91 15.65 4.00 3.91 15.65
REDUCCION DE 3/4 A 1/2" DE EMBONE 1.00 1.63 1.63 1.00 1.63 1.63
CODOS DE 1/2" DE EMBONE 4.00 1.53 6.14 4.00 1.53 6.14
UNION UNIVERSAL DE 3/4" 2.00 4.25 8.50 2.00 4.25 8.50
NIPLE DE 3/4 A 1" 6.00 0.94 5.64 6.00 0.94 5.64
ADAPTADOR DE 3/4" 4.00 1.91 7.64 4.00 1.91 7.64
LLAVE DE CONTROL DE 3/4"
VALVULA SHECK DE 3/4 1.00 8.99 8.99 1.00 8.99 8.99
UNIONES DE EMBONE DE 3/4" 2.00 4.25 8.50 2.00 4.25 8.50
TUBO DE AGUA FRIA DE 1/2" 1.00 11.74 11.74 1.00 11.74 11.74
TUBO DE AGUA FRIA DE 3/4 2.00 15.55 31.11 2.00 15.55 31.11
CODOS DE 2X90° 3.00 1.99 5.98 3.00 1.99 5.98
TUBOS DE 4" 2.00 33.51 67.02 2.00 33.51 67.02
VALVULA DE IMPULSION DE 3/4" 1.00 65.76 65.76 1.00 65.76 65.76
ADAPTADOR DE 1" 1.00 2.73 2.73 1.00 2.73 2.73
TUBO DE LUZ DE 3/4" 7.00 5.42 37.92 7.00 5.42 37.92
CURVAS DE LUZ DE 3/4" 6.00 0.56 3.34 6.00 0.56 3.34
CAJA RECTAGULAR 5.00 1.70 8.52 5.00 1.70 8.52
CODOS DE 1/2" DE EMBONE 4.00 1.53 6.14 4.00 1.53 6.14
TUBO DE AGUA FRIA DE 4" 1.00 34.13 34.13 1.00 34.13 34.13
FLETE 1.00 170.00 170.00 1.00 170.00 170.00
CALAMINA 3.00 29.07 87.21 3.00 29.07 87.21
CALAMINA VIVE HOGAR 3.00 31.00 95.00 3.00 31.00 93.00
VALVULA CHECK DE 1 PULG. DE CANASTIALLA 2.00 38.00 95.00 2.00 38.00 76.00
TUBO DE 2" 1.00 17.00 17.00 1.00 17.00 17.00
TUBO DE 2" 1.00 13.00 13.00 1.00 13.00 13.00

PRESUPUESTO DE MATERIALES DE TECHO 16168.56 12367.61

PRESUPUESTO DE MANO DE OBRA


MANO DE OBRA S/ 5,800.00
MATERIALES S/ 3,800.96
GUARDIANIA LUNES A DOMINGO POR 10 DIAS S/ 500.00
PRESUPUESTO DEL TECHO S/ 10,100.96
DEPOSITO TIA ANA 10/7/2023 S/ 34,100.00
DEPOSITO TIA ANA - PUERTAS 10/9/2023 S/ 6,625.00
SALDO ANTERIOR HASTA EL DIA 8-10-2023 10/8/2023 S/ 283.00
SALDO HASTA LA FECHA 9-10-2023 S/ 41,008.00

GASTOS

PAGO DE DESMONTE 10/9/2023 S/ 1,450.00


MOVILIDAD 10/9/2023 S/ 50.00
ADAPTADOR MIGUEL 10/9/2023 S/ 100.00
CALZONES 10/9/2023 S/ 237.50
MERCADO + OTROS 10/9/2023 S/ 200.00
NO SE SABE EN QUE SE GASTO 10/9/2023 S/ 78.00
TOTAL DE GASTOS S/ 2,115.50

SALDO HASTA LA FECHA 9-10-2023 S/ 38,892.50

FALTA POR PAGAR


PRESUPUESTO DE TECHO S/ 10,100.96
PRESUPUESTO DE PUERTAS S/ 6,300.00
S/ 16,400.96 S/ 22,491.54
2972
GUARDIANIA S/ -
OBISPO S/ 1,150.00
CEMENTO + LADRILLO S/ 3,113.74
AGREGADO S/ 1,450.00
PUERTAS S/ 6,300.00
WATER S/ 140.00
CEMENTO S/ - FALTA POR PAGAR DIFERENCIA QUE FALTA
S/ 12,153.74 S/ 7,590.00 S/ 4,618.00

PRESTAMO DIANA
INSTALACION DE TANQUE S/ 600.00
ZAPATOS DE SEGURIDAD MIGUEL S/ 700.00
RETIRO CASA S/ 100.00
COMPRAS TOTUS S/ 56.79
PROFESOR CARLOS S/ 80.00
RETIRO MIGUEL CASA S/ 100.00
ZAPATILLAS RAFAEL S/ 129.00
ROPA RAFAEL S/ 139.90
HAMBUEGUEZAS S/ 37.00
compras promart S/ 91.50
cena S/ 84.50
VINOS S/ 45.00
S/ 2,163.69

SE ADICINO
CEMENTO PARA CISTERNA Y ESCALERA
20.00 S/ 33.65 S/ 673.06
CALAMINA 6.00 S/ 33.34 S/ 200.04
GUARDIANIA 1.00 S/ 400.00 S/ 400.00
ARENA GRUESA 3.00 S/ 60.00 S/ 180.00
ladrillo 150.00 S/ 2.53 S/ 379.50
combustible 1.00 S/ 50.00 S/ 50.00
pasajes miguel vive hogar del 16 al 21 -10 1.00 S/ 100.00 S/ 100.00
PIEDRA CHANCADA 3.00 S/ 120.00 S/ 360.00
pintura tia ana 1.00 S/ 245.90 S/ 245.90
S/ 2,588.50

SE RETIRA S/ 3,000.00 PARA OBISPO 10/20/2023 DIANA


SE RETIRA S/ 1,000.00 PARA OBISPO 10/21/2023 MIGUEL
SE RETIRA S/ 350.00 GUARDIANIA 10/22/2023 MIGUEL
S/ 4,350.00

SE LE DEBERA A OBISPO -S/ 2,850.00


RESUMEN DE OBRA

LO QUE HAY EN CUENTA INTERBANK S/ 82.00


OBISPO S/ -
PUERTAS S/ 3,150.00
WATER S/ 140.00
FALTA POR PAGAR S/ 3,290.00

INGRESOS
EN CUENTA INTERBANK S/ 85.00
ADICIONAL DE OBRA TIA ANA S/ 0.00
PRESTAMO DIANA S/ 3,055.49
S/ 3,140.49

SALDO DE OBRA -S/ 149.51

PRESTAMO DIANA
INSTALACION DE TANQUE S/ 600.00
ZAPATOS DE SEGURIDAD MIGUEL S/ 700.00
RETIRO CASA S/ 100.00
COMPRAS TOTUS S/ 56.79
PROFESOR CARLOS S/ 80.00
RETIRO MIGUEL CASA S/ 100.00
ZAPATILLAS RAFAEL S/ 129.00
ROPA RAFAEL S/ 139.90
HAMBUEGUEZAS S/ 37.00
compras promart S/ 91.50
cena 21-10-23 S/ 84.50
VINOS S/ 45.00
PAGO DE LUZ CASA PIURA S/ 145.40
EUROTUBO S/ 35.00
CHIFA CANTON S/ 80.00
GASTOS CASA S/ 50.00
RETIRO CASA MIGUEL S/ 50.00
COMPRAS TOTUS S/ 213.70
PAGOS CASA Y GASTOS S/ 140.00
VESTIDO DIANA S/ 79.90
PLAZA VEA S/ 47.80
RETIRO MIGUEL PASAJES S/ 50.00
S/ 3,055.49
PROYECTO VIVE HOGAR
DESCRIPCIÓN UND C.PARCIAL PARCIAL
MANO DE OBRA TERREAJEO I PARTE 1.00 S/ 3,772.78
MANO DE OBRA TERRAJEO II PARTE 1.00 S/ 2,961.20
MATERIALES I PARTE 10.00 S/ 33.00 S/ 330.00
MATERIALES II PARTE 20.00 S/ 33.00 S/ 660.00
AGREGADO ARENA FINA 6.00 S/ 60.00 S/ 360.00
WATER FALTA COMPRAR 1.00 S/ 140.00 S/ 140.00
PINTURA 1.00 S/ 200.00 S/ 200.00
CONTRATO NAVARRO 1.00 S/ 6,150.00 S/ 6,150.00
OTROS 1.00 S/ 200.00 S/ 200.00

S/ 14,773.98
OGAR
P. A CTA.1 P. A CTA.2 SALDO A PAGAR
S/ 2,500.00 S/ 1,272.78
S/ 2,961.20
S/ 330.00
S/ 660.00
S/ 360.00
S/ 140.00
S/ 200.00
S/ 2,500.00 S/ 650.00 S/ 3,000.00
S/ 200.00

S/ 9,123.98
S/ 7,609.95 S/ 6,959.95
PRESTAMO A ROSH S/ 1,000.00
PRESTAMO ROSH I.E. CASA PIURA S/ 300.00
TOTAL SE TIENE S/ 8,259.95

SE DEBE A LA TIA ANA S/ 864.03