CONCRETE COVER King Khalid International Airport (KKIA),

Terminal 4 Extension - Concourse H and Link LT1


WITH INSCEPTION
"EARTHING PIT" BACKFILL SOIL
Engineer:

EARTHING ROD

CONCRETE HOUSING Main contractor:

GRAVEL FILLING

Sub-contractor:

FINISH GRADE LEVEL


BARE COPPER EARTHING Key Plan
CONDUCTOR 95mm2

CH

TR1 TL1 TR2 TL2 TR3 TL3 TR4

PROJECT
NORTH
1500

TRUE
NORTH

QUIBLA

800 300 800 800 300 800


LIGHT

50

50
150 150 200 150 200 150 200 150 150

150 150 200 150 200 150 200 150 150


EL. -1.50 150 150 200 150 150 150 150 200 150 150

300 2000 300 T.O.C


300

INSULATED COPPER CABLE 2X450MM CABLE LADDER FOR


MV CABLE FOR T1 & T2

1500

1500

1500

1500
2(3C,300MM2) + CPC CABLE 450 450
G1
400

400

Ø50mm uPVC SLEEVES


FOR EARTHING CABLES
300

300

2X450MM CABLE LADDER FOR


MV CABLE FOR T3,TL3 & T4 TO EARTH PIT

50

50
300

300

450 450
2000

ELEC TRENCH
SPACE RESERVED FOR A
450mm CABLE LADDER
450 450
FUTURE USE MV T1/T2 MV T3/T4
SPACE RESERVED FOR A MV T1/T2 MV T3/T4
1000

1000

450mm CABLE LADDER


FUTURE USE
SOCKET FOR
MAINTENANCE
50 300

(TYPICAL)

EL.-4.10
B.O.C.L LEGEND:

B.O.F. - BOTTOM OF FOOTING


T.O.F. - TOP OF FOOTING
T.O.B. - TOP OF BEAM
T.O.C. - TOP OF COLUMN
SPACING VARIES (MINIMUM C.L - CONCRETE TOP LEVEL

300mm SPACING)
800 1500 800 300 1500

50
150 150 200 150 200 150 200 150 150

150
150 150 200 150 150
Reference:

150

800
200
150
150
1500

1500
150 150 200 150 200 150 200 150 150
50 1500 50
Project

50
00 21/02/2024 Initial Submission
REV. Date Description Auth.
MV T1/T2 MV T3/T4 Scale N.T.S.
Drawn
Designed
Checked
Approved
MV T1/T2 MV T3/T4 Shop Drawing Title:

ELEC TRENCH

Shop Drawing No.:

S20014-200S-CACCI-SHD-SC-SSC-0299-00

Sub-Discpline
Project No.

Document

Sheet No.
Discpline

Revision
Form

Type
S20014-200S CACCI SHD SC SSC 0299 00