WATER SERVICES NOTES:

GENERAL NOTES:
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER M&E
SCHEMATICS & SCHEDULES
SERVICES DRAWINGS, TOGETHER WITH THE ARCHITECTS & STRUCTURAL
2. ALL HOT AND COLD WATER PIPEWORK NOT DIMENSIONED TO BE
DRAWINGS AND ASSOCIATED SPECIFICATIONS.
Ø15.
2. EMEC DESIGN AND CONSULTANCY LIMITED HAVE NO RESPONSIBILITY FOR
3. HWSF, CWS AND MCWS PIPEWORK SERVICES SHALL BE
ANY USE MADE OF THIS DRAWING OTHER THAN FOR THAT WHICH IT WAS
COMPLETE WITH ISOLATING VALVES. HWSR PIPEWORK BRANCHES
PREPARED AND ISSUED.
ARE TO BE FITTED WITH THERMAL BALANCING VALVES.
3. DO NOT SCALE FROM THIS DRAWING, WORK TO MEASURED DIMENSIONS
4. ALL PIPEWORK SHALL BE THERMALLY INSULATED USING MINERAL
ONLY.
WOOL (ROCKWOOL OR EQUIVALENT) AND SHALL HAVE A FIRE
4. ANY DISCREPANCIES, ERRORS OR OMISSIONS ARE TO BE CLARIFIED WITH
THE RELEVANT ENGINEER AT THE EARLIEST OPPORTUNITY.
12a RATING OF MINIMUM A2.
Ø42 mm MCWS
5. BRANCHES TAKE-OFFS FROM MAIN RUNS AND RISERS SHALL BE
5. ALL WORKS ARE TO BE IN ACCORDANCE WITH THE CURRENT RELEVANT
STATUTORY REGULATIONS, BUILDING REGULATIONS, BRITISH STANDARDS,
12 BOP : 2950
Ø42 mm BCWS CONFIGURED TO ALLOW NATURAL VENTING OF THE SYSTEM.
BOP : 2950 6. ALL FINAL CONNECTIONS TO APPLIANCES TO BE COMPLETE WITH
ACCEPTED CODES OF PRACTICE AND TRADE ASSOCIATION REQUIREMENTS.
Ø42 mm DHWSF BALLOFIX ISOLATING VALVES.
6. ALL DRAWINGS TO BE APPROVED BY THE RELEVANT STATUTORY BODY TO
BOP : 2950 7. REFER TO SCHEDULES FOR EQUIPMENT DETAILS.
CONFIRM COMPLIANCE WITH BUILDING REGULATIONS AND STATUTORY
REQUIREMENTS. 11a Ø28 mm DHWSR C 8. REFER TO SCHEMATICS FOR FINAL CONNECTION DETAIL TO
7. EMEC DESIGN AND CONSULTANCY LTD HAVE NO RESPONSIBILITY FOR ANY 9 10 BOP : 2955 APPLIANCES.
9. ALL PLANT/EQUIPMENT/SERVICES SELECTIONS TO BE VERIFIED
DESIGN WHICH HAS NOT BEEN APPROVED BY THE RELEVANT STATUTORY
BY THE PROJECT ACOUSTICIAN TO ENSURE COMPLIANCE WITH ALL
BODY.
EMPLOYER'S AND LOCAL AUTHORITY NOISE ASSESSMENTS &
8. IT IS THE RESPONSIBILITY OF THE PRINCIPLE DESIGNER/CONTRACTOR TO
DESIGN CRITERIA.
SEEK APPROVAL OF ALL DRAWINGS FROM THE BUILDING CONTROL OFFICER,
FIRE OFFICER & ANY OTHER RELEVANT STATUTORY BODY.
IV KEY NOTES:
9. FINAL DESIGN FOR ALL FIRE RELATED SERVICES, INCLUDING, BUT NOT
LIMITED TO SPRINKLERS, DRY/WET RISERS, SMOKE VENTILATION & FIRE ALARM
TO BE THE RESPONSIBILITY OF THE SPECIALIST SUB-CONTRACT
9a Cloaks MAINS COLD WATER
DESIGNER/INSTALLER. 0.23c BOOSTED COLD WATER
10. FINAL PROJECT CO-ORDINATION OF M&E SERVICES, STRUCTURE, 300x55 mm
IV MULTI (FA,ELV/BMS & SP+L) DOMESTIC HOT WATER FLOW
ARCHITECTURE AND FIRE STRATEGY IS THE RESPONSIBILITY OF THE PRINCIPLE
DESIGNER/CONTRACTOR. CABLE BASKET c/w DIVIDERS FOR
DOMESTIC HOT WATER RETURN
11. EMEC DESIGN & CONSULTANCY LTD HAVE NO RESPONSIBILITY FOR ANY CO- - 200 mm SP & L
Ø15 mm BCWS - 50mm FA
ORDINATION ISSUES THAT HAVE NOT BEEN REVIEWED/ADDRESSED BY THE
PRINCIPLE DESIGNER/CONTRACTOR.
8 Ø15 mm DHWSR - 50mm DATA/ELV CL:0000 HEIGHT FROM FFL TO CENTER OF PIPE
Ø15 mm DHWSF Ø42 mm BCWS BOT:2910
12. EMEC DESIGN AND CONSULTANCY LTD RETAIN COPYRIGHT OF ALL DHW - DOMESTIC HOT WATER
DRAWINGS, SCHEDULES AND CALCULATIONS UNTIL SUCH TIME THE CONTRACT Reception DROP TO L/L BOP : 2630
Ø15 mm MCWS - MAINS COLD WATER
B Ø42 mm BCWS BOP : 2675
IS COMPLETE.
0.23 WH TA - TO ABOVE
B BOP : 3095
13. ALL PENETRATIONS TO BE SUITABLY FIRE STOPPED WHEN THEY GO WH Ø15 mm BCWS
Ø15 mm FA - FROM ABOVE
THROUGH A DESIGNATED COMPARTMENT LINE. Reception WC Ø42 mm MCWS
BOP : 2675 TB - TO BELOW
14. FOR ELECTRICAL SYMBOLS REFER TO DRAWING No. FS0654-DOD--ZZ-XX-DR- BOP : 2895 BOP : 2630
FB - FROM BELOW
E-2010 0.23b Ø15 mm DHWSR Ø50 mm 200x55 mm
c/w - COMPLETE WITH
BOP : 2895 BOP : 2620 DATA (DT) CABLE BASKET
Ø50 mm BOT:2915 HL - HIGH LEVEL
Ø15 mm DHWSF BOP : 2620 LL - LOW LEVEL
BOP : 2895 300x50 mm AFFL - ABOVE FINISH FLOOR LEVEL
WC LOW VOLTAGE (LV) CONTAINMENT SU - SET UP
- 50mm FIRE ALARM CABLES SD - SET DN
WC - 50mm DATA/ELV CABLES
Ø15 mm DHWSR EQ - EQUAL
WC RISES WITHIN RISER TO ROOF PLANT
DWF - DRINKING WATER FOUNTAIN
BOP : 2895
BOT:2740
Ø25 mm CAT 5 BCWS WHB - WASH HAND BASIN
Ø15 mm DHWSF
BOP : 2895 BOP : 740
Fa WC - WATER CLOSET
Ø15 mm BCWS Store IV - ISOLATING VALVE
BOP : 2895 PRV - PRESSURE REDUCING VALVE
Ø25 mm CAT 5 BCWS UP 0.23a DV - DRAIN VALVE
BOP : 2890 SV - SOLENOID VALVE LINKED TO BMS
Ø15 mm BCWS
DROP TO L/L
Level 00 DCV - DOUBLE CHECK VALVE
UP STR - STRAINER
0
Cloaks G TMV3 - THERMOSTATIC MIXING VALVE - TYPE 3

0.22c ALL LEVELS ARE TAKEN FROM THE FFL:


Reception
Ø15 mm BCWS
MODELS USED AT THE TIME OF DRAWING ISSUE:
Ø15 mm BCWS 0.22 Ø15 mm DHWSR
Ø15 mm DHWSR Ø15 mm DHWSF SI N
K Section A-A
Ø15 mm DHWSF
DROP TO L/L
Ø28 mm BCWS
BOP : 2815
DROP TO L/L
UP A 1 : 25
Project Links
Ø15 mm DHWSR Ø22 mm DHWSF File Name Model Name Revision
BOP : 2820 Ø15 mm DHWSR BOP : 2790
Ø15 mm DHWSF BOP : 2645 Ø15 mm DHWSR F FS0954-NHA-ZZ-XX-M3-A-0010 Architects Model P33
BOP : 2820 Ø22 mm DHWSF BOP : 2795
FS0654-CHK-ZZ-XX-M3-I-0001 FF&E Model P12
BOP : 2640 Ø28 mm BCWS FS0654-HYS-ZZ-XX-M3-X-0001 FAB Steel Model C03
Ø15 mm DHWSF Ø35 mm BCWS Lobby
B Ø15 mm DHWSR BOP : 2790
WH BOP : 2990 BOP : 2635 FS0654-INT-V1-XX-M3-S-0001 Design Structural Model P17
B Ø15 mm DHWSR BOP : 2820 0.L2 Ø25 mm CAT 5 BCWS
WH Ø25 mm CAT 5 BCWS
B BOP : 2990 Ø22 mm DHWSF BOP : 2790
WH Ø15 mm BCWS BOP : 2640 UP UP
Reception WC BOP : 2990
BOP : 2820
Ø28 mm BCWS Ø22 mm BCWS E
Ø15 mm BCWS Ø28 mm BCWS BOP : 2985 BOP : 2780
BOP : 2945 0.22b BOP : 2815 Ø25 mm CAT 5 BCWS
Ø15 mm DHWSR Stair 2
BOP : 3090
BOP : 2945 Ø35 mm BCWS
Ø15 mm DHWSF UP 0.S2
UP Ø15 mm BCWS BOP : 2985
BOP : 2940 Ø15 mm DHWSR
WC BOP : 2825 UP Store IV
WC
WC SI N
K BOP : 2995
Ø22 mm DHWSF
Ø22 mm DHWSF Da
0.22a WC BOP : 2830
WC BOP : 2990
Ø15 mm DHWSR
Ø15 mm BCWS WC
Ø15 mm DHWSR BOP : 2835
FOR CONTINUATION SEE DRAWING NO. - FS0654-EME-ZZ-00-DR-P-1211

BOP : 2825 BOP : 3095 UP IV


Ø22 mm BCWS
UP
Group room Ø15 mm DHWSR Ø22 mm BCWS BOP : 2830
DN BOP : 2645 Ø15 mm BCWS
Ø15 mm DHWSF
Ø28 mm DHWSF DROP TO DROP TO L/L
Ø15 mm BCWS 0.21 BOP : 2835
BOP : 3095 SHOWER
DROP TO L/L Ø15 mm BCWS BOP : 2635 WC Nursery WCs Ø15 mm DHWSR

WH
Ø15 mm BCWS Ø42 mm BCWS BOP : 2835
BOP : 3095 0.27d

B
Ø15 mm DHWSR BOP : 2630 C01 Ø15 mm DHWSF
Ø15 mm DHWSF Ø15 mm DHWSR

WH
BOP : 2835
DROP TO L/L BOP : 2910 Hygiene room UP
Cloaks

B
Ø15 mm BCWS
Ø15 mm BCWS BOP : 2910
Ø15 mm DHWSF
Plant 1 0.26
REFER TO Ø15 mm DHWSF 0.27e
Circulation Ø15 mm DHWSR PLANTROOM 0.24 Ø42 mm MCWS BOP : 2910
TA LAYOUT Ø15 mm BCWS
0.55 BOP : 3245
Ø15 mm DHWSR
Ø15 mm DHWSF
UP Ø15 mm BCWS BOP : 2985 Ø15 mm DHWSF
Ø15 mm DHWSR SINK Ø15 mm DHWSR DROP TO L/L IN BOXING
Ø15 mm DHWSF
Kitchenette BOP : 2985 AND THEN RUNS AT LOW
IV DROP TO L/L Ø15 mm BCWS
LEVEL IN VANITY UNIT D
0.27c Ø15 mm BCWS
Therapy Reprographics Lift To Dishwasher
BOP : 2985
UP Ø15 mm BCWS
Gen. store Ø42 mm BCWS
0.20 0.25 0.E1 Riser Ø15 mm DHWSR
Ø15 mm BCWS A BOP : 2630
Ø15 mm BCWS Ø15 mm DHWSF
BOP : 3195 Ø15 mm BCWS Ø15 mm BCWS 0.25a Ø28 mm DHWSF
Ø15 mm DHWSF 0.R6 DROP TO L/L
Ø15 mm DHWSR Ø15 mm DHWSR Ø15 mm DHWSF BOP : 2635
Ø15 mm DHWSR Ø15 mm DHWSF Ø15 mm DHWSR
BOP : 3195 Ø15 mm DHWSR
TA DROP TO L/L BOP : 2645 Nursery
Ø15 mm DHWSF TA DN
Ø42 mm MCWS
BOP : 3195 Ø15 mm DHWSR Ø22 mm BCWS Ø15 mm BCWS Ø42 mm BCWS BOP : 2630 0.27
UP Ø15 mm BCWS BOP : 2885 TA BOP : 3055 BOP : 3095
C01 Ø15 mm DHWSF Ø22 mm BCWS Ø15 mm DHWSR Ø28 mm DHWSF
Ø15 mm DHWSF C01 Issued for Construction 20.10.23
BOP : 2885 BOP : 3100 BOP : 3100
Ø15 mm DHWSR BOP : 3055 Ø15 mm DHWSR
TA Ø15 mm BCWS
Ø42 mm BCWS Ø15 mm DHWSF IV BOP : 3110
P02 Updated in line with comments as 22.09.23
BOP : 2950 UP UP
BOP : 2885
UP UP BOP : 3050 DN
IV Ø42 mm MCWS
clouded, re-issued for Stage 5 Approval
IV
BOP : 3155 P01 Water Service Layout Issued for Stage 5 26.07.23
Ø42 mm BCWS Approval
UP DN
IV Ø42 mm BCWS DN Ø22 mm DHWSR Ø28 mm DHWSR
BOP : 3155
Rev Description Date
Ø15 mm DHWSF BOP : 2950 Circulation BOP : 2960 Ø42 mm MCWS Ø42 mm DHWSF
BOP : 3060 BOP : 2955
Ø35 mm DHWSF Ø42 mm DHWSF BOP : 2900 BOP : 3155
Ø15 mm DHWSR Ø35 mm DHWSF KEY PLAN:
BOP : 2955
0.52 BOP : 2955 BOP : 2950 Ø42 mm BCWS Ø28 mm DHWSR
BOP : 3060 Ø42 mm BCWS BOP : 2900 BOP : 3160
Ø22 mm BCWS Ø22 mm DHWSR
BOP : 2950
BOP : 3055 BOP : 2960 Ø42 mm MCWS
BOP : 2950
Ø42 mm BCWS
Ø15 mm DHWSF C
BOP : 2835 Ø42 mm BCWS
BOP : 2950 Server Ø15 mm DHWSF Ø15 mm DHWSR BOP : 2765
Ø35 mm DHWSF BOP : 3080 BOP : 2830 SHEET 2
BOP : 2955 0.34 WC Ø42 mm DHWSF Plant (Heating) SHEET 1
Ø15 mm DHWSR Ø15 mm BCWS Ø28 mm DHWSR
Ø22 mm DHWSR BOP : 3075 Sick bay BOP : 2830 BOP : 2910 BOP : 2765
Ø28 mm DHWSR
0.28
BOP : 2960 Ø15 mm BCWS Ø15 mm BCWS
BOP : 3075 0.32 WHB Ø15 mm DHWSR BOP : 2770 UP
IV UP Ø28 mm _DC_HWS-Hot Water R
Ø15 mm DHWSF
Ø15 mm BCWS AWC BOP : 2685
DROP TO L/L Ø42 mm BCWS
BOP : 3080 UP
0.30 BOP : 2680
Ø15 mm DHWSR
BOP : 3080 Ø15 mm DHWSF
UP DN
Ø42 mm DHWSF
BOP : 2680
Ba CLIENT:

BOP : 3270 DN Interview room


Ø42 mm MCWS
Ø15 mm DHWSF Ø15 mm BCWS Group room BOP : 3080
BOP : 3080 Ø15 mm DHWSR Ø15 mm DHWSF 0.29 Teaching store
BOP : 3270 Ø15 mm DHWSR Entrance/Reception 0.27b
Ø15 mm BCWS TA Ø15 mm DHWSR 0.27a CONSULTANT:
BOP : 3270 0.51 BOP : 3205 Ø42 mm MCWS
Staff room (prep & Ø15 mm DHWSF BOP : 2765
social) BOP : 3205
INCOMING Ø63 mm MDPE
Ø15 mm BCWS CONVERTS TO Ø42 mm COPPER
0.35 BOP : 3205 PROJECT:

EMMANUEL COMMUNITY
SCHOOL - STAGE 5
Ø15 mm DHWSR
BOP : 2995
Therapy General office
Lobby Ø15 mm DHWSF
0.33 0.31 BOP : 2995
0.50
Ø15 mm BCWS
SINK BOP : 2995
Ø15 mm BCWS
Ø15 mm DHWSF
Ø15 mm DHWSR
DROP TO L/L
A
STATUS CODE: STATUS:

S5 CONSTRUCTION
DRAWING TITLE:

Level 00
Water Services Layout

Sheet 2 of 2

DRAWN: DATE: SCALE:

ARK 26.07.23 1:50


CHECKED: APPROVED: DATE: SIZE:

DODD EMEC 26.07.23 A0


PURPOSE: Stage 5
PROJECT JOB NUMBER: J22140
PROJECT DRAWING NUMBER: REV

FS0654-DOD-XX-00-DR-P-4002 C01

You might also like