This non-conformance report register tracks issues with a construction project between a contractor and client. It includes fields to identify the contract and project details, categorize the non-conformance as incidental, minor, or major, provide details of the issue, and track whether the issue was accepted as is, accepted with a reduced level of service, or rejected, along with any corrective actions taken.
This non-conformance report register tracks issues with a construction project between a contractor and client. It includes fields to identify the contract and project details, categorize the non-conformance as incidental, minor, or major, provide details of the issue, and track whether the issue was accepted as is, accepted with a reduced level of service, or rejected, along with any corrective actions taken.
This non-conformance report register tracks issues with a construction project between a contractor and client. It includes fields to identify the contract and project details, categorize the non-conformance as incidental, minor, or major, provide details of the issue, and track whether the issue was accepted as is, accepted with a reduced level of service, or rejected, along with any corrective actions taken.
() (record date in relevant column) Request (CAR) No. (Principal must Date Details of approve if a reduced NCR # Accepted – Reduced received Non-Conformance Accepted level of service is to Incidental Minor Major Level of Service (update Rejected be accepted. Include – As Is Variation Register) evidence of agreement)
Contract Administration System, Transport and Main Roads, January 2023 1 of 1