Water Gantry
Water Gantry
i Earth work
Excavation Lsum
Base
Provide insitu concrete to a
well laid reinforcement for the
base thickness not exceeding
500mm with concrete mix
ratio of 1:2:4
35 cum
Column
Reinforcement
a 12mm 3 tons 550,000.00 1,650,000.00
b 16mm 1 ton 550,000.00 550,000.00
c 10mm 1 ton 470,000.00 470,000.00
d Binding wire 2 Bundle 150,000.00 300,000.00
Formwork
To collection 6,144,400.00
To collection 23,325,200.00
Summary