COMPOUND WALL QUANTITY SHEET

S.NO Discription Unit NO's. Length Width Depth

1 Earth work Excavation for


Footings
HWALL CUM 41 1.3 1.3 1.2
HWALL CUM 4 1.8 1.3 1.2
CWALL CUM 14 1.3 1.3 1.2
CWALL CUM 1 1.8 1.3 1.2
TOTAL QTY CUM

2
Earth work Excavation for CRS:-
CUM 1 144.24 0.6 2.45
CUM 1 52.63 0.6 1.96
TOTAL QTY CUM

3 Refilling with Excavated soil for Footings


Footings earth work total Qty CUM
Deduction
PCC Bed for Footings
HWALL CUM 41 1.3 1.3 0.1
HWALL CUM 4 1.8 1.3 0.1
CWALL CUM 14 1.3 1.3 0.1
CWALL CUM 1 1.8 1.3 0.1
FOOTING
HWALL CUM 41 1 1 0.3
HWALL CUM 4 1.5 1 0.3
CWALL CUM 14 1 1 0.3
CWALL CUM 1 1.5 1 0.3
COLUMN
HWALL CUM 45 0.3 0.23 4.62
CWALL CUM 16 0.3 0.23 4.793
TOTAL QTY CUM

4 P.C.C. Bed FOR FOOTINGS


HWALL CUM 41 1.3 1.3 0.1
HWALL CUM 4 1.8 1.3 0.1
CWALL CUM 14 1.3 1.3 0.1
CWALL CUM 1 1.8 1.3 0.1
TOTAL QTY CUM

5 PCC BED FOR CRS WALL


CUM 1 144.24 0.6 0.1
CUM 1 52.63 0.6 0.1
TOTAL QTY CUM

6 P.C.C. Bed below Plinth Beam


CUM 1 133.89 0.38 0.1
CUM 1 48.72 0.38 0.1
TOTAL QTY CUM

8 FOOTING
HWALL CUM 41 1 1 0.3
HWALL CUM 4 1.5 1 0.3
CWALL CUM 14 1 1 0.3
CWALL CUM 1 1.5 1 0.3
TOTAL QTY CUM

9 COLUMN
HWALL CUM 45 0.3 0.23 7.67
CWALL CUM 16 0.3 0.23 7.843
TOTAL QTY CUM

10 PLINTH BEAM
HWALL CUM 1 133.89 0.23 0.3
CWALL CUM 1 48.72 0.23 0.3
TOTAL QTY CUM

11 BEAM
HWALL CUM 1 144.24 0.23 0.3
CWALL CUM 1 52.63 0.23 0.3
TOTAL QTY CUM

12 CRS WALL CUM 1 144.24 0.6 2.45


CUM 1 52.63 0.6 1.96
TOTAL QTY CUM

13 9" Brick work


HWALL CUM 1 133.89 1.93 0.23
CWALL CUM 1 48.72 1.76 0.23
TOTAL QTY CUM

14 External Walls Plastering


HWALL SQM 1 144.24 1.93
CWALL SQM 1 52.63 1.76
TOTAL QTY SQM
15 External Walls Painting
HWALL SQM 1 144.24 1.93
CWALL SQM 1 52.63 1.76
TOTAL QTY SQM

16 Centring Work
A BED CONCRETE
HWALL SQM 41 5.2 0.3
HWALL SQM 4 5.6 0.3
CWALL SQM 14 5.2 0.3
CWALL SQM 1 5.6 0.3
TOTAL QTY SQM
B FOOTING MAT
HWALL SQM 41 5.2 0.3
HWALL SQM 4 5.6 0.3
CWALL SQM 14 5.2 0.3
CWALL SQM 1 5.6 0.3
TOTAL QTY SQM

FT mat
HWALL SQM 41 4 0.3
HWALL SQM 4 5 0.3
CWALL SQM 14 4 0.3
CWALL SQM 1 5 0.3
TOTAL QTY SQM
COLUMNS
HWALL SQM 41 4 0.3
HWALL SQM 4 5 0.3
CWALL SQM 14 4 0.3
CWALL SQM 1 5 0.3
TOTAL QTY SQM

C Columns SQM 45 1.06 7.67


SQM 16 1.06 7.843
TOTAL QTY SQM

D Plinth Beams
HWALL SQM 1 133.89 1.06
CWALL SQM 1 48.72 1.06
TOTAL QTY SQM
E Floor Beams
HWALL SQM 1 144.24 1.06
CWALL SQM 1 52.63 1.06
TOTAL QTY SQM
TOTAL QTY

Providing High Yield Strength


Deformed (HYSD) Steel bars (Fe 500
grade as per IS 1786-1985) of 8mm to
40mm diameters, cutting, bending, to
required sizes and shapes placing in
position with cover blocks of approved
size and binding wire of 20SWG,
forming grills for reinforcement work
as per approved designs and
drawings including cost and
conveyance of bars from approved
sources to site of work, including cost
18 and conveyance of binding wire, cover
blocks, chairs, overlaps, spacers,
dowels, wastage etc., and all
operational, incidental, and labour
charges such as cutting, bending,
placing in position tying etc., and sales
& other taxes,on cost of all materials
complete for finished item of work
(APSS No. 126)

TONS
Quantity Remarks

83.15
11.23
28.39
2.81
125.58

212.0328
61.89288
273.93

125.58

6.93
0.94
2.37
0.23

12.30
1.80
4.20
0.45

14.35
5.29
76.73

6.93
0.94
2.37
0.23
10.47
8.65
3.16
11.81

13.39
4.87
18.26

12.3
1.8
4.2
0.45
18.75

23.81535
8.658672
32.47

9.23841
3.36168
12.60

9.95256
3.63147
13.58

212.0328
61.89288
273.93

59.433771
19.721856
79.16

278.3832
92.6288
371.01
278.3832
92.6288
371.01

63.96
6.72
21.84
1.68
94.20

63.96
6.72
21.84
1.68
94.20

49.2
6
16.8
1.5
73.50

49.2
6
16.8
1.5
73.50

365.859
133.01728
498.88

141.9234
51.6432
193.57

152.8944
55.7878
208.68
1236.53

10
COMPOUND WALL

S.No Description of Work UNIT QUANTITY RATE


Earth work Excavation for
1 CUM 125.58 300
Footings

Earth work Excavation for CUM


2 273.93 300.00
CRS:-

Refilling with Excavated soil


3 CUM 76.73 200.00
for Footings

5 P.C.C. Bed FOR FOOTINGS CUM 10.47 5,500.00

6 P.C.C. Bed below Plinth Beam CUM 18.261 5500

7 P.C.C Below CRS Wall CUM 11.8122 5500

8 FOOTING CUM 18.75 8650

9 COLUMNS CUM 32.47 9,250.00

10 PLINTH BEAM CUM 12.60 8,650.00

11 BEAMS CUM 13.58 9,000.00

12 CRS WALL CUM 273.93 6,500.00

13 9" Brick work CUM 79.16 8,000.00

14 External Walls Plastering SQM 371.01 600.00

15 External Walls Painting SQM 371.01 175.00

16 Centring Work SQM 1,236.53 600.00

17 Reinforcement tons 10.00 95,000.00

TOTAL

1 Architectural Drawings, Elevations, Structural Drawings, Estimates

TOTAL - A
1 Add GST @ 18 %
GRAND TOTAL (A+B)
Amount
37674

82177.704

15345.6856

57557.5

100435.5
0
64967.1

162187.5

300384.7035

108990.7785

122256.27

1780516.92

633245.016

222607.2

64927.1

741915.048

950000

5445188.03

168800.83

5613988.85
1010517.99
6624506.85