Equipment List - 14-10-2017 Updated Till 23-11-2023

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 118

LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT

Remaining
PROCESS Last
Life Equipment /
Criticality Design Design Operating Operating Design Internal Length Year Of Inspecti
Equipment Equipment Criticality Component Component Component Contents/ Last Inspection Remaining Life
S No. Corporation Field Process Area Train No. Equipment Description (High Pressure Temperature Pressure Temperature Thickness Dia (mm) manufactu on
Tag No. Type (High Tag No. Description Material Fluids Year (Years)
Medium (psig) ( F)
0
(psig) (0F) (mm) (mm) re (Yes/
Medium Specification
Low) No)
Low)
Permeate /
Primary AISI-1026 A513
1 OGDCL Qadirpur Membrane
Train 1 A-2603 A Permeate Membrane Skid skid M M A-2603 A Pipe- SCH.80 950 180 700 75 Type5 12.7 Residual/Feed 203.2 9144 1995 Yes Oct-14 48.7
Gas
Permeate /
Primary AISI-1026 A513
2 OGDCL Qadirpur Membrane
Train 1 A-2603 B Permeate Membrane Skid skid M M A-2603 A Pipe- SCH.80 950 180 700 75
Type5 12.7 Residual/Feed 203.2 9144 1995 Yes Oct-14 48.7
Gas
Permeate /
Primary AISI-1026 A513
3 OGDCL Qadirpur Membrane
Train 1 A-2603 C Permeate Membrane Skid skid M M A-2603 A Pipe- SCH.80 950 180 700 75
Type5 12.7 Residual/Feed 203.2 9144 1995 Yes Oct-14 48.7
Gas
Permeate /
Primary AISI-1026 A513
4 OGDCL Qadirpur Membrane
Train 1 A-2603 D Permeate Membrane Skid skid M M A-2603 A Pipe- SCH.80 950 180 700 75
Type5 12.7 Residual/Feed 203.2 9144 1995 Yes Oct-14 48.7
Gas
Permeate /
Primary AISI-1026 A513
5 OGDCL Qadirpur Membrane
Train 2 A-2613 A Permeate Membrane Skid skid M M A-2613 A Pipe- SCH.80 950 180 700 75
Type5 12.7 Residual/Feed 203.2 9144 1995 Yes Oct-14 48.7
Gas
Permeate /
Primary AISI-1026 A513
6 OGDCL Qadirpur Membrane
Train 2 A-2613 B Permeate Membrane Skid skid M M A-2613 B Pipe- SCH.80 950 180 700 75
Type5 12.7 Residual/Feed 203.2 9144 1995 Yes Oct-14 48.7
Gas
Permeate /
Primary AISI-1026 A513
7 OGDCL Qadirpur Membrane
Train 2 A-2613 C Permeate Membrane Skid skid M M A-2613 C Pipe- SCH.80 950 180 700 75
Type5 12.7 Residual/Feed 203.2 9144 1995 Yes Oct-14 48.7
Gas
Permeate /
Primary AISI-1026 A513
8 OGDCL Qadirpur Membrane
Train 2 A-2613 D Permeate Membrane Skid skid M M A-2613 D Pipe- SCH.80 950 180 700 75
Type5 12.7 Residual/Feed 203.2 9144 1995 Yes Oct-14 48.7
Gas
Permeate /
Primary AISI-1026 A513
9 OGDCL Qadirpur Membrane
Train 2 A-2613 E Permeate Membrane Skid skid M M A-2613 D Pipe- SCH.80 950 180 700 75
Type5 12.7 Residual/Feed 203.2 9144 1995 Yes Oct-14 48.7
Gas
Permeate /
Primary AISI-1026 A513
10 OGDCL Qadirpur Membrane
Train 3 A-2623 A Permeate Membrane Skid skid M M A-2623 A Pipe- SCH.80 950 180 700 75
Type5 12.7 Residual/Feed 203.2 9144 1995 Yes Oct-14 48.7
Gas
Permeate /
Primary AISI-1026 A513
11 OGDCL Qadirpur Membrane
Train 3 A-2623 B Permeate Membrane Skid skid M M A-2623B Pipe- SCH.80 950 180 700 75
Type5 12.7 Residual/Feed 203.2 9144 1995 Yes Oct-14 48.7
Gas
Permeate /
Primary AISI-1026 A513
12 OGDCL Qadirpur Membrane
Train 3 A-2623 C Permeate Membrane Skid skid M M A-2623 C Pipe- SCH.80 950 180 700 75
Type5 12.7 Residual/Feed 203.2 9144 1995 Yes Oct-14 48.7
Gas

Front end
13 OGDCL Qadirpur compression Utility D-0501A Plant Air receiver Vessel Vessel L M D-0501A Shell & Heads 149 154 105 100 SA-516 Gr. 70 12.954 Plat Air 2150 3400 1998 Yes Nov-18 42

Front end
14 OGDCL Qadirpur compression Train C F-0301A Fuel Gas Filter Vessel M L F-0301A Shell & Heads 1100 180 665 Not in the list SA-516 Gr. 70 21.336 Fuel Gas 325 1066.8 1998 Yes Apr-17 138

Front end
15 OGDCL Qadirpur compression Train C F-0301B Fuel Gas Filter Vessel M L F-0301B Shell & Heads 1100 180 665 Not in the list SA-516 Gr. 70 21.336 Fuel Gas 325 1066.8 1998 Yes Apr-17 248

Recycle Regeneration
16 OGDCL Qadirpur membrane Train 01 FC-2651 Recycle Filter Coalescer Vessel M L V-2651 Filter Vessel 950 180 650 110 SA-516 Gr. 70 40 Gas 1220 3922 1994 Yes Jan-17 119

Recycle Regeneration
17 OGDCL Qadirpur membrane Train 01 FC-2651 Recycle Filter Coalescer Vessel M L G-6119 B Filter Housing 950 180 690 68 SA-516 Gr. 70 25 Gas 661 3385 2007 Yes Jan-17 83

Recycle Regeneration
18 OGDCL Qadirpur membrane Train 02 FC-2661 Recycle Filter Coalescer Vessel M L V-2661 Filter Vessel 950 180 650 110 SA-516 Gr. 70 40 Gas 1220 3922 1994 Yes Jan-17 129

Recycle Regeneration
19 OGDCL Qadirpur membrane Train 02 FC-2661 Recycle Filter Coalescer Vessel M L G-6119 A Filter Housing 950 180 690 68 SA-516 Gr. 70 25 Gas 661 3385 2007 Yes Jan-17 77

20 OGDCL Qadirpur Cooling Train 01 FC-9004 Feed Gas Separator/Filter Coalescer Vessel M L FC-9004 Shell & Heads 950 180 715 60 SA-516 Gr 70 83 Raw Gas 3220 8366 2002 Yes Aug-21 52

21 OGDCL Qadirpur Cooling Train 02 FC-9704 Feed Gas Separator/Filter Coalescer Vessel M L FC-9704 Shell & Heads 950 180 715 59 SA-516 Gr 70 83 Raw Gas 3220 8366 2006 Yes Sep-23 4

22 OGDCL Qadirpur Metering No Train V-2023 Condensate Flash Separator Vessel M MH V-2023 Shell & Heads 150 180 50 75 SA-516 Gr.70 14 Condensate 1803.4 4006 2002 Yes Oct-22 45

Recycle
23 OGDCL Qadirpur membrane Train 01 V-2709 Permeate Compressor Suction Scrubber Vessel M L V-2709 Shell & Heads 925 180 319 100 SA-516 Gr.70 34 Permeate Gas 1100 2400 1995 Yes Jan-23 1344

Recycle
24 OGDCL Qadirpur membrane Train 01 V-2719 Permeate Compressor Suction Scrubber Vessel M L V-2719 Shell & Heads 925 180 319 100 SA-516 Gr.70 34 Permeate Gas 1100 2400 1995 Yes Apr-17 107

Front end
25 OGDCL Qadirpur compression Utility V-4001 Fuel Gas Knock Out Drum Vessel H L V-4001 Shell & Heads 190 180 185 59 SA-516 Gr.70 10 Residue Gas 610 Not available 2010 Yes Apr-17 325

Raw /
26 OGDCL Qadirpur Utility No Train V-5300 Hp Fuel Gas Knock Out Drum Vessel H L V-5300 Shell & Heads 460 330 410 42 SA-516 Gr.70 25 Residual/Rec 1100 3000 1994 Yes Apr-17 55
ycle Residue

Raw /
27 OGDCL Qadirpur Utility No Train V-6300 Hp Fuel Gas Knock Out Drum Vessel H L V-6300 Shell & Heads 460 330 410 43 SA-516 Gr.70 15 Residual/Rec 480 1780 2002 Yes Apr-17 97
ycle Residue

28 OGDCL Qadirpur Cooling Train 01 V-9000A Inlet Separator Vessel M L V-9000A Shell & Heads 950 180 717 96 SA 516 Gr 70 72 Raw Gas 2750 5030 2002 Yes Sep-23 197

29 OGDCL Qadirpur Cooling Train 01 V-9000B Inlet Separator Vessel M M V-9000B Shell & Heads 950 180 717 96 SA 516 Gr 70 72 Raw Gas 2750 5030 2002 Yes Sep-23 44

30 OGDCL Qadirpur Refrigeration No Train V-9104 Oil Seprator Vessel H L V-9104 Shell & Heads 362.6 200 276 150 SA 516 Gr 70 20 Propane 1600 3800 2002 Yes Apr-17 87
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Remaining
PROCESS Last
Life Equipment /
Criticality Design Design Operating Operating Design Internal Length Year Of Inspecti
Equipment Equipment Criticality Component Component Component Contents/ Last Inspection Remaining Life
S No. Corporation Field Process Area Train No. Equipment Description (High Pressure Temperature Pressure Temperature Thickness Dia (mm) manufactu on
Tag No. Type (High Tag No. Description Material Fluids Year (Years)
Medium (psig) ( F)
0
(psig) (0F) (mm) (mm) re (Yes/
Medium Specification
Low) No)
Low)

31 OGDCL Qadirpur Cooling Train 02 V-9700A Inlet Separator Vessel M MH V-9700A Shell & Heads 950 180 719 96 SA-516 Gr.70 70 Raw Gas 2750 5030 2007 Yes Sep-23 33

32 OGDCL Qadirpur Cooling Train 02 V-9700B Inlet Separator Vessel M L V-9700B Shell & Heads 950 180 719 96 SA-516 Gr.70 70 Raw Gas 2750 5030 2007 Yes Sep-23 34

Raw Gas/
33 OGDCL Qadirpur Metering No Train V-9710 Degasser Vessel M L V-9710 Shell & Heads 150 180 100 90 SA-516 Gr.70N 16 Condensate 2438.4 3660 2007 Yes Dec-21 -

34 OGDCL Qadirpur Cooling Train 02 V-9801 Memguard Vessel Vessel M L V-9801 Shell & Heads 950 640 717 69 SA-516 Gr.70N 75 Raw Gas 2745 3350 2006 Yes Jul-15 194

35 OGDCL Qadirpur Cooling Train 02 V-9802 Memguard Vessel Vessel M L V-9802 Shell & Heads 950 640 717 69 SA-516 Gr.70N 75 Raw Gas 2745 3350 2006 Yes Jul-15 194

36 OGDCL Qadirpur Cooling Train 02 V-9803 Memguard Vessel Vessel M L V-9803 Shell & Heads 950 640 717 69 SA-516 Gr.70N 75 Raw Gas 2745 3350 2006 Yes Jul-15 213

37 OGDCL Qadirpur Cooling Train 02 V-9804 Memguard Vessel Vessel M L V-9804 Shell & Heads 950 640 717 69 SA-516 Gr.70N 75 Raw Gas 2745 3350 2006 Yes Jul-15 176

38 OGDCL Qadirpur Cooling Train 02 V-9809 Regeneration Gas Scrubber Vessel M MH V-9809 Shell & Heads 950 640.4 734 85 SA-516 Gr.70 22 Region. Gas 700 2938 2006 Yes Sep-23 8

Raw /
39 OGDCL Qadirpur Utility No Train S-5303A Hp Fuel Gas Filter Vessel L L S-5303A Shell & Heads 460 330 410 43 SA-516 Gr.70 10 Residual/Rec 324 914.4 1994 Yes Apr-17 53
ycle Residue

Raw /
40 OGDCL Qadirpur Utility No Train S-5303B Hp Fuel Gas Filter Vessel L L S-5303B Shell & Heads 460 330 410 43 SA-516 Gr.70 10 Residual/Rec 324 914.4 1994 Yes Apr-17 55
ycle Residue

NOT Header & Tubes


Fin Fan CALCULATE (156 Nos of Not Not
41 OGDCL Qadirpur Cooling Train 01 E-9208 Regeneration Gas Cooler Cooler M E-9208 available Not available 710 450 SS TP 304 (SML) 2.11 Reg. Gas 25.4 Not available
available Yes Aug-11 Not calculated
D Tubes)
NOT Header & Tubes
Fin Fan CALCULATE (156 Nos of Not
42 OGDCL Qadirpur Cooling Train 02 E-9808 Regeneration Gas Cooler Cooler M E-9808 available Not available 711 240 SS TP 304 (SML) 2.11 Reg. Gas 25.4 Not available 2015 No No Not calculated
D Tubes)

Roof=6mm Water +
Roof, Shell & Shell=8 mm Condensate/
43 OGDCL Qadirpur Utility Train 01 T-2801 Condensate Tank Tank H M T-2801 Bottom 0.5 max.180 ATM 95 A-283 Gr. C Bottom=12 Blanketing 8229.6 7250 1994 Yes Nov-21 47
mm gas

Roof=6mm Water +
Roof, Shell & Shell=6~8 Condensate/
44 OGDCL Qadirpur Utility No Train T-2821 New Condensate Tank Tank H MH T-2821 Bottom 0.5 180 ATM 95 A-283 Gr. C mm Blanketing 13716 8998 2004 Yes Nov-21 28
Bottom=9m gas
m

Roof=6mm
Roof, Shell & Shell=6~8 Produced
45 OGDCL Qadirpur Utility No Train T-4405A Produce Water Tank Tank H M T-4405A Bottom 0.36 180 ATM 121 A-283 Gr. C mm Water 4572 4600 1995 Yes Sep-17 Not Calculated
Bottom=9m
m

Raw /
46 OGDCL Qadirpur Utility No Train E-5301 Coil Heater Heater L L E-5301 shell/Pipe 460 330 410 Not in the list A-106 Gr.B 14.27 Residual/Rec 125.5 1800 1994 Yes Apr-17 Not in Report
ycle Residue

Convection
Section Coils
Radiant Section Raw Gas(MG See As Built
47 OGDCL Qadirpur Cooling Train 01 E-9301 Regeneration Gas Heater Heater L MH E-9301 Coils 950 868 698 422 A-106 Gr.B 7.62 out) 88.8 Darwing of AJC Nov.2016 Yes Sep-23 Not Calculated
Inlet Manifold &
Outlet Manifold

Permeate /
Recycle NOT Not AISI-1026 A513
48 OGDCL Qadirpur Membrane
Train 1 A-2653 Recycle Permeate Membrane Skid skid M
CALCULATED A-2653 Pipe- SCH.80 available Not available 680 68
Type5 12.7 Recycle 203.2 9144 1995 No No Not calculated
Residual/Vent

Permeate
Recycle NOT Not AISI-1026 A513
49 OGDCL Qadirpur Membrane
Train 2 A-2663 Recycle Permeate Membrane Skid skid M
CALCULATED A-2663 Pipe- SCH.80 available Not available 680 68
Type5 12.7 Gas/ 203.2 9144 1995 No No Not calculated
Residual/Vent

NOT
CALCULATE Not Not
50 OGDCL Qadirpur Refrigeration No Train F-9109A Suction Filter Vessel M F-9109A Pipe 362.6 38/180 80 65 A-106 Gr.B available Propane available Not available 2002 No No Not calculated
D
NOT
CALCULATE Not Not
51 OGDCL Qadirpur Refrigeration No Train F-9109B Suction Filter Vessel M F-9109B Pipe 362.6 38/180 81 64 A-106 Gr.B available Propane available Not available 2002 No No Not calculated
D
NOT
CALCULATE Not Not
52 OGDCL Qadirpur Refrigeration No Train F-9109C Suction Filter Vessel M F-9109C Pipe 362.6 38/180 80 66 A-106 Gr.B available Propane available Not available 2002 No No Not calculated
D
NOT
CALCULATE Not Not
53 OGDCL Qadirpur Refrigeration No Train F-9109D Suction Filter Vessel L F-9109D Pipe 362.6 38/180 80 65 A-106 Gr.B available Propane available Not available 2002 No No Not calculated
D
NOT
54 OGDCL Qadirpur Pre treatment Train 01 F-9206A Particle Filter Vessel L CALCULATE F-9206A Shell & Heads 950 78 700 72 SA-516 Gr. 70 41 Raw Gas 1500 4275 2002 Yes Sep-17 Not in Report
D
NOT
55 OGDCL Qadirpur Pre treatment Train 01 F-9206B Particle Filter Vessel L CALCULATE F-9206B Shell & Heads 950 78 708 70 SA-516 Gr. 70 41 Raw Gas 1500 4275 2003 Yes Sep-17 Not in Report
D
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Remaining
PROCESS Last
Life Equipment /
Criticality Design Design Operating Operating Design Internal Length Year Of Inspecti
Equipment Equipment Criticality Component Component Component Contents/ Last Inspection Remaining Life
S No. Corporation Field Process Area Train No. Equipment Description (High Pressure Temperature Pressure Temperature Thickness Dia (mm) manufactu on
Tag No. Type (High Tag No. Description Material Fluids Year (Years)
Medium (psig) ( F)
0
(psig) (0F) (mm) (mm) re (Yes/
Medium Specification
Low) No)
Low)
NOT
56 OGDCL Qadirpur Pre treatment Train 02 F-9806A Particle Filter Vessel L CALCULATE F-9806A Shell & Heads 950 78 715 78 SA-516 Gr. 70 41 Raw Gas 1500 4275 2006 Yes Sep-23 44
D
NOT
57 OGDCL Qadirpur Pre treatment Train 02 F-9806B Particle Filter Vessel L CALCULATE F-9806B Shell & Heads 950 78 715 78 SA-516 Gr. 70 41 Raw Gas 1500 4275 2006 Yes Sep-23 59
D
NOT
CALCULATE Not Regeneration Not Not
58 OGDCL Qadirpur No Train FC-2611 Filter Coalescer Vessel M FC-2611 Shell & Heads 950 150 250-300 94 SA-516 Gr. 70 available Gas available Not available available Yes Aug-21 24
D

NOT Raw
CALCULATE Finger Type Not Gas/Condens Not
59 OGDCL Qadirpur Slug Catcher No Train M-2001 Slug Catcher Vessel H M-2001 (Shell & Heads) 1100 180 275 100 SA-106 available available Not available 1995 Yes Nov-18 Not in Report
D ate

NOT Raw
CALCULATE Not Gas/Condens
60 OGDCL Qadirpur Slug Catcher No Train M-2002 Slug Catcher Vessel H M-2002 Shell & Heads 1100 180 275 100 SA-516 Gr 70 available 2439 7317 2006 Yes Nov-18 Not in Report
D ate

NOT
CALCULATE Not Not
61 OGDCL Qadirpur FECP No Train V-1400 Degasser Vessel Vessel L V-1400 Shell & Heads 125 120 100 95 SA-516 Gr.70 available Not available available Not available 2000 No No Not calculated
D

Recycle NOT Not


62 OGDCL Qadirpur membrane Train 01 V-2706 Permeate Compressor Suction Scrubber Vessel M
CALCULATED V-2706 Shell & Heads 95 180 4 71 SA-516 Gr.70 available Permeate Gas 2250 3300 1995 Yes Jan-23 See Remarks

Recycle Not
63 OGDCL Qadirpur membrane Train 01 V-2707 Permeate Compressor Suction Scrubber Vessel M L V-2707 Shell & Heads 170 180 25 101 SA-516 Gr.70 available Permeate Gas 1700 2840 1995 Yes Jan-23 532

Recycle NOT Not


64 OGDCL Qadirpur membrane Train 01 V-2708 Permeate Compressor Suction Scrubber Vessel M
CALCULATED V-2708 Shell & Heads 390 180 100 100 SA-516 Gr.70 available Permeate Gas 1400 2600 1995 Yes Jan-23 See Remarks

Recycle NOT Not


65 OGDCL Qadirpur membrane Train 01 V-2710 Nitrogen Vessel Vessel M
CALCULATED V-2710 Shell & Heads 145 212 60 Not in the list SA-516 Gr.70 10 Nitrogen available Not available 1995 No No Not calculated

Recycle NOT Not


66 OGDCL Qadirpur membrane Train 01 V-2716 Permeate Compressor Suction Scrubber Vessel M
CALCULATED V-2716 Shell & Heads 95 180 4 70 SA-516 Gr.70 available Permeate Gas 2250 3300 1995 No No Not calculated

Recycle NOT Not


67 OGDCL Qadirpur membrane Train 01 V-2717 Permeate Compressor Suction Scrubber Vessel M
CALCULATED V-2717 Shell & Heads 170 180 25 101 SA-516 Gr.70 available Permeate Gas 1700 2840 1995 No No Not calculated

Recycle NOT Not


68 OGDCL Qadirpur membrane Train 01 V-2718 Permeate Compressor Suction Scrubber Vessel M
CALCULATED V-2718 Shell & Heads 390 180 100 100 SA-516 Gr.70 available Permeate Gas 1400 2600 1995 No No Not calculated

Recycle NOT Not


69 OGDCL Qadirpur membrane Train 01 V-2720 Nitrogen Vessel Vessel M
CALCULATED V-2720 Shell & Heads 145 212 60 Not in the list SA-516 Gr.70 10 Permeate Gas available Not available 1995 No No Not calculated

Recycle NOT Not


70 OGDCL Qadirpur membrane Train 02 V-2726 Permeate Compressor Suction Scrubber Vessel M
CALCULATED V-2726 Shell & Heads 95 180 4 75 SA-516 Gr.70 available Permeate Gas 2250 3300 2009 No No Not calculated

Recycle NOT Not


71 OGDCL Qadirpur membrane Train 02 V-2727 Permeate Compressor Suction Scrubber Vessel M
CALCULATED V-2727 Shell & Heads 170 180 35 111 SA-516 Gr.70 available Permeate Gas 1700 2840 2009 No No Not calculated

Recycle NOT Not


72 OGDCL Qadirpur membrane Train 02 V-2728 Permeate Compressor Suction Scrubber Vessel M
CALCULATED V-2728 Shell & Heads 390 180 105 118 SA-516 Gr.70 available Permeate Gas 1400 2600 2009 No No Not calculated

Recycle NOT Not


73 OGDCL Qadirpur membrane Train 02 V-2729 Permeate Compressor Suction Scrubber Vessel M
CALCULATED V-2729 Shell & Heads 925 180 280 112 SA-516 Gr.70 available Permeate Gas 1100 2400 2009 Yes Aug-21 17

Recycle NOT Not Not


74 OGDCL Qadirpur membrane Train 02 V-2730 Nitrogen Vessel Vessel M
CALCULATED V-2730 Shell & Heads 150 212 60 60 SA-516 Gr.70 available Permeate Gas available Not available 2009 No No Not calculated

Recycle NOT Not


75 OGDCL Qadirpur membrane Train 02 V-2736 Permeate Compressor Suction Scrubber Vessel L
CALCULATED V-2736 Shell & Heads 95 180 4 75 SA-516 Gr.70 available Permeate Gas 2250 3300 2009 No No Not calculated

Recycle NOT Not


76 OGDCL Qadirpur membrane Train 02 V-2737 Permeate Compressor Suction Scrubber Vessel M
CALCULATED V-2737 Shell & Heads 170 180 35 111 SA-516 Gr.70 available Permeate Gas 1700 2840 2009 No No Not calculated

Recycle NOT Not


77 OGDCL Qadirpur membrane Train 02 V-2738 Permeate Compressor Suction Scrubber Vessel M
CALCULATED V-2738 Shell & Heads 390 180 105 118 SA-516 Gr.70 available Permeate Gas 1400 2600 2009 No No Not calculated

Recycle NOT Not


78 OGDCL Qadirpur membrane Train 02 V-2739 Permeate Compressor Suction Scrubber Vessel L
CALCULATED V-2739 Shell & Heads 925 180 280 112 SA-516 Gr.70 available Permeate Gas 1100 2400 2009 No No Not calculated

Recycle NOT Not Not


79 OGDCL Qadirpur membrane Train 02 V-2740 Nitrogen Vessel Vessel M
CALCULATED V-2740 Shell & Heads 150 212 60 60 SA-516 Gr.70 available Permeate Gas available Not available 2009 No No Not calculated

NOT Raw /
CALCULATE Residual/Per Not
80 OGDCL Qadirpur Metering No Train V-4101 Flare Gas Knock Out Drum Vessel H V-4101 Shell & Heads 50 180 0.8 60 SA-516 Gr.70 14 available Not available 2010 Yes Nov-18 Not in Report
D meate

NOT Not Not


81 OGDCL Qadirpur FECP No Train V-4701 Plant Air receiver Vessel Vessel L
CALCULATED
V-4701 Shell & Heads 147 Not available 100 87 SA-516 Gr.70 available Plant Air available Not available 2010 No Not available Not calculated

NOT Not Instrument Not


82 OGDCL Qadirpur FECP No Train V-4701A Plant Air receiver Vessel Vessel L
CALCULATED
V-4701A Shell & Heads 147 Not available 100 87 SA-516 Gr.70 available Air available Not available 2010 No Not available Not calculated
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Remaining
PROCESS Last
Life Equipment /
Criticality Design Design Operating Operating Design Internal Length Year Of Inspecti
Equipment Equipment Criticality Component Component Component Contents/ Last Inspection Remaining Life
S No. Corporation Field Process Area Train No. Equipment Description (High Pressure Temperature Pressure Temperature Thickness Dia (mm) manufactu on
Tag No. Type (High Tag No. Description Material Fluids Year (Years)
Medium (psig) ( F)
0
(psig) (0F) (mm) (mm) re (Yes/
Medium Specification
Low) No)
Low)

NOT Not Instrument Not


83 OGDCL Qadirpur FECP No Train V-4701B Plant Air receiver Vessel Vessel L
CALCULATED V-4701B Shell & Heads 147 Not available 100 87 SA-516 Gr.70 available Air available Not available 2010 No Not available Not calculated

NOT Not Instrument Not


84 OGDCL Qadirpur FECP No Train V-4701C Plant Air receiver Vessel Vessel L
CALCULATED V-4701C Shell & Heads 147 Not available 100 87 SA-516 Gr.70 available Air available Not available 2010 No Not available Not calculated

NOT Not Instrument Not


85 OGDCL Qadirpur FECP No Train V-4701D Plant Air receiver Vessel Vessel L
CALCULATED V-4701D Shell & Heads 147 Not available 100 87 SA-516 Gr.70 available Air available Not available 2010 No Not available Not calculated

NOT Not Instrument Not


86 OGDCL Qadirpur FECP Utility No Train D-4701 A1 Dryer Instrument Air 4701 A/B Vessel L
CALCULATED D-4701 A Shell & Heads 176.4 100 87 SA-516 Gr.70 available Air available Not available 2010 No Not available Not calculated
122

NOT Not Instrument Not


87 OGDCL Qadirpur FECP Utility No Train D-4701 A2 Dryer Instrument Air 4701 A/B Vessel L
CALCULATED D-4701 A Shell & Heads 176.4 100 87 SA-516 Gr.70 available Air available Not available 2010 No Not available Not calculated
122

NOT Not Instrument Not


88 OGDCL Qadirpur FECP Utility No Train D-4701 B1 Dryer Instrument Air 4701 A/B Vessel L
CALCULATED D-4701 B Shell & Heads 176.4 100 87 SA-516 Gr.70 available Air available Not available 2010 No Not available Not calculated
122

NOT Not Instrument Not


89 OGDCL Qadirpur FECP Utility No Train D-4701 B2 Dryer Instrument Air 4701 A/B Vessel L
CALCULATED D-4701 B Shell & Heads 176.4 100 87 SA-516 Gr.70 available Air available Not available 2010 No Not available Not calculated
122
NOT
90 OGDCL Qadirpur Cooling Train 01 V-9201 Memguard Vessel Vessel M CALCULATE V-9201 Shell & Heads 950 600 712 70 SA 516 Gr 70 75 Raw Gas 2745 3350 2002 Yes Oct-23 584
D
NOT
91 OGDCL Qadirpur Cooling Train 01 V-9202 Memguard Vessel Vessel M CALCULATE V-9202 Shell & Heads 950 600 712 70 SA 516 Gr 70 75 Raw Gas 2745 3350 2002 Yes Oct-23 175
D
NOT
92 OGDCL Qadirpur Cooling Train 01 V-9203 Memguard Vessel Vessel M CALCULATE V-9203 Shell & Heads 950 600 712 70 SA 516 Gr 70 75 Raw Gas 2745 3350 2002 Yes Oct-23 33
D

Remaining life is
NOT negative because the
93 OGDCL Qadirpur Cooling Train 01 V-9204 Memguard Vessel Vessel M CALCULATE V-9204 Shell & Heads 950 600 712 70 SA 516 Gr 70 75 Raw Gas 2745 3350 2002 Yes Oct-23 current thickness is
D higher than the initial
thickness

Remaining life is
NOT negative because the
94 OGDCL Qadirpur Cooling Train 01 V-9205 Memguard Vessel Vessel M CALCULATE V-9205 Shell & Heads 950 600 712 70 SA 516 Gr 70 75 Raw Gas 2745 3350 2002 Yes Oct-23 current thickness is
D higher than the initial
thickness

NOT
95 OGDCL Qadirpur FECP No Train A-1301 Valerus Package skid Vessel M CALCULATE 1-MBF-2010- Raw Gas 844.4 1676.4 2009 Yes Sep-17 Not in Report
D 1
Suction Scrubber 1000 150 270 92 SA 516 Gr 70 35
NOT
96 OGDCL Qadirpur FECP No Train A-1301 Valerus Package skid Vessel M CALCULATE 1-MBF-2030- Interstage Raw Gas 692 1676.4 2009 Yes Sep-17 Not in Report
D 1
Scrubber 1270 150 470 95 SA 516 Gr 70 35
NOT
97 OGDCL Qadirpur FECP No Train A-1301 Valerus Package skid Vessel M CALCULATE 1-MBL-2010- Suction Bottle 1st Raw Gas 572 1879.6 2009 Yes Sep-17 Not in Report
D 1
Stage 1000 150 259 180 SA 516 Gr 70 19
NOT
98 OGDCL Qadirpur FECP No Train A-1301 Valerus Package skid Vessel M CALCULATE 1-MBL-2020- Discharge Bottle Raw Gas 410 3657.6 2009 Yes Sep-17 Not in Report
D 1 SA-106C Shell / SA
1st Stage 1270 350 475 165 516Gr 70 Heads 23
NOT
99 OGDCL Qadirpur FECP No Train A-1301 Valerus Package skid Vessel M CALCULATE 1-MBL-2030- Suction Bottle 2nd Raw Gas 456 1676.4 2009 Yes Sep-17 Not in Report
D 1 SA-106C Shell / SA
Stage 1270 150 470 165 516Gr 70 Heads 26
NOT
100 OGDCL Qadirpur FECP No Train A-1301 Valerus Package skid Vessel M CALCULATE 1-MBL-2040- Discharge Bottle Raw Gas 364 3733.8 2009 Yes Sep-17 Not in Report
D 1 SA-106C Shell / SA
2nd Stage 1270 350 745 180 516Gr 70 Heads 21
NOT
101 OGDCL Qadirpur FECP No Train A-1303 Valerus Package skid Vessel M CALCULATE 3-MBF-2010- Raw Gas 844.4 1676.4 2009 No No Not available
D 3
Suction Scrubber 1000 150 270 92 SA 516 Gr 70 35
NOT
102 OGDCL Qadirpur FECP No Train A-1303 Valerus Package skid Vessel M CALCULATE 3-MBF-2030- Interstage Raw Gas 692 1676.4 2009 No No Not available
D 3
Scrubber 1270 150 470 95 SA 516 Gr 70 35
NOT
103 OGDCL Qadirpur FECP No Train A-1303 Valerus Package skid Vessel M CALCULATE 3-MBL-2010- Suction Bottle 1st Raw Gas 572 1879.6 2009 No No Not available
D 3
Stage 1000 150 259 180 SA 516 Gr 70 19
NOT
104 OGDCL Qadirpur FECP No Train A-1303 Valerus Package skid Vessel M CALCULATE 3-MBL-2020- Discharge Bottle Raw Gas 410 3657.6 2009 No No Not available
D 3 SA-106C Shell / SA
1st Stage 1270 350 475 165 516Gr 70 Heads 23
NOT
105 OGDCL Qadirpur FECP No Train A-1303 Valerus Package skid Vessel M CALCULATE 3-MBL-2030- Suction Bottle 2nd Raw Gas 456 1676.4 2009 No No Not available
D 3 SA-106C Shell / SA
Stage 1270 150 470 165 516Gr 70 Heads 26
NOT
106 OGDCL Qadirpur FECP No Train A-1303 Valerus Package skid Vessel M CALCULATE 3-MBL-2040- Discharge Bottle Raw Gas 364 3733.8 2009 No No Not available
D 3 SA-106C Shell / SA
2nd Stage 1270 350 745 180 516Gr 70 Heads 21
NOT
107 OGDCL Qadirpur FECP No Train A-1304 Valerus Package skid Vessel M CALCULATE 4-MBF-2010- Raw Gas 844.4 1676.4 2009 No No Not available
D 4
Suction Scrubber 1000 150 270 92 SA 516 Gr 70 35
NOT
108 OGDCL Qadirpur FECP No Train A-1304 Valerus Package skid Vessel M CALCULATE 4-MBF-2030- Interstage Raw Gas 692 1676.4 2009 No No Not available
D 4
Scrubber 1270 150 470 95 SA 516 Gr 70 35
NOT
109 OGDCL Qadirpur FECP No Train A-1304 Valerus Package skid Vessel M CALCULATE 4-MBL-2010- Suction Bottle 1st Raw Gas 572 1879.6 2009 No No Not available
D 4
Stage 1000 150 259 180 SA 516 Gr 70 19
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Remaining
PROCESS Last
Life Equipment /
Criticality Design Design Operating Operating Design Internal Length Year Of Inspecti
Equipment Equipment Criticality Component Component Component Contents/ Last Inspection Remaining Life
S No. Corporation Field Process Area Train No. Equipment Description (High Pressure Temperature Pressure Temperature Thickness Dia (mm) manufactu on
Tag No. Type (High Tag No. Description Material Fluids Year (Years)
Medium (psig) ( F)
0
(psig) (0F) (mm) (mm) re (Yes/
Medium Specification
Low) No)
Low)
NOT
110 OGDCL Qadirpur FECP No Train A-1304 Valerus Package skid Vessel M CALCULATE 4-MBL-2020- Discharge Bottle Raw Gas 410 3657.6 2009 No No Not available
D 4 SA-106C Shell / SA
1st Stage 1270 350 475 165 516Gr 70 Heads 23
NOT
111 OGDCL Qadirpur FECP No Train A-1304 Valerus Package skid Vessel M CALCULATE 4-MBL-2030- Suction Bottle 2nd Raw Gas 456 1676.4 2009 No No Not available
D 4 SA-106C Shell / SA
Stage 1270 150 470 165 516Gr 70 Heads 26
NOT
112 OGDCL Qadirpur FECP No Train A-1304 Valerus Package skid Vessel M CALCULATE 4-MBL-2040- Discharge Bottle Raw Gas 364 3733.8 2009 No No Not available
D 4 SA-106C Shell / SA
2nd Stage 1270 350 745 180 516Gr 70 Heads 21
NOT
113 OGDCL Qadirpur FECP No Train A-1305 Valerus Package skid Vessel M CALCULATE 5-MBF-2010- Raw Gas 844.4 1676.4 2009 No No Not available
D 5
Suction Scrubber 1000 150 270 92 SA 516 Gr 70 35
NOT
114 OGDCL Qadirpur FECP No Train A-1305 Valerus Package skid Vessel M CALCULATE 5-MBF-2030- Interstage Raw Gas 692 1676.4 2009 No No Not available
D 5
Scrubber 1270 150 470 95 SA 516 Gr 70 35
NOT
115 OGDCL Qadirpur FECP No Train A-1305 Valerus Package skid Vessel M CALCULATE 5-MBL-2010- Suction Bottle 1st Raw Gas 572 1879.6 2009 No No Not available
D 5
Stage 1000 150 259 180 SA 516 Gr 70 19
NOT
116 OGDCL Qadirpur FECP No Train A-1305 Valerus Package skid Vessel M CALCULATE 5-MBL-2020- Discharge Bottle Raw Gas 410 3657.6 2009 No No Not available
D 5 SA-106C Shell / SA
1st Stage 1270 350 475 165 516Gr 70 Heads 23
NOT
117 OGDCL Qadirpur FECP No Train A-1305 Valerus Package skid Vessel M CALCULATE 5-MBL-2030- Suction Bottle 2nd Raw Gas 456 1676.4 2009 No No Not available
D 5 SA-106C Shell / SA
Stage 1270 150 470 165 516Gr 70 Heads 26
NOT
118 OGDCL Qadirpur FECP No Train A-1305 Valerus Package skid Vessel M CALCULATE 5-MBL-2040- Discharge Bottle Raw Gas 364 3733.8 2009 No No Not available
D 5 SA-106C Shell / SA
2nd Stage 1270 350 745 180 516Gr 70 Heads 21
NOT
119 OGDCL Qadirpur FECP No Train A-1306 Valerus Package skid Vessel M CALCULATE 6-MBF-2010- Raw Gas 844.4 1676.4 2009 No No Not available
D 6
Suction Scrubber 1000 150 270 92 SA 516 Gr 70 35
NOT
120 OGDCL Qadirpur FECP No Train A-1306 Valerus Package skid Vessel M CALCULATE 6-MBF-2030- Interstage Raw Gas 692 1676.4 2009 No No Not available
D 6
Scrubber 1270 150 470 95 SA 516 Gr 70 35
NOT
121 OGDCL Qadirpur FECP No Train A-1306 Valerus Package skid Vessel M CALCULATE 6-MBL-2010- Suction Bottle 1st Raw Gas 572 1879.6 2009 No No Not available
D 6
Stage 1000 150 259 180 SA 516 Gr 70 19
NOT
122 OGDCL Qadirpur FECP No Train A-1306 Valerus Package skid Vessel M CALCULATE 6-MBL-2020- Discharge Bottle Raw Gas 410 3657.6 2009 No No Not available
D 6 SA-106C Shell / SA
1st Stage 1270 350 475 165 516Gr 70 Heads 23
NOT
123 OGDCL Qadirpur FECP No Train A-1306 Valerus Package skid Vessel M CALCULATE 6-MBL-2030- Suction Bottle 2nd Raw Gas 456 1676.4 2009 No No Not available
D 6 SA-106C Shell / SA
Stage 1270 150 470 165 516Gr 70 Heads 26
NOT
124 OGDCL Qadirpur FECP No Train A-1306 Valerus Package skid Vessel M CALCULATE 6-MBL-2040- Discharge Bottle Raw Gas 364 3733.8 2009 No No Not available
D 6 SA-106C Shell / SA
2nd Stage 1270 350 745 180 516Gr 70 Heads 21
NOT
125 OGDCL Qadirpur FECP No Train A-1307 Valerus Package skid Vessel M CALCULATE 7-MBF-2010- Raw Gas 844.4 1676.4 2009 No No Not available
D 7
Suction Scrubber 1000 150 270 92 SA 516 Gr 70 35
NOT
126 OGDCL Qadirpur FECP No Train A-1307 Valerus Package skid Vessel M CALCULATE 7-MBF-2030- Interstage Raw Gas 692 1676.4 2009 No No Not available
D 7
Scrubber 1270 150 470 95 SA 516 Gr 70 35
NOT
127 OGDCL Qadirpur FECP No Train A-1307 Valerus Package skid Vessel M CALCULATE 7-MBL-2010- Suction Bottle 1st Raw Gas 572 1879.6 2009 No No Not available
D 7
Stage 1000 150 259 180 SA 516 Gr 70 19
NOT
128 OGDCL Qadirpur FECP No Train A-1307 Valerus Package skid Vessel M CALCULATE 7-MBL-2020- Discharge Bottle Raw Gas 410 3657.6 2009 No No Not available
D 7 SA-106C Shell / SA
1st Stage 1270 350 475 165 516Gr 70 Heads 23
NOT
129 OGDCL Qadirpur FECP No Train A-1307 Valerus Package skid Vessel M CALCULATE 7-MBL-2030- Suction Bottle 2nd Raw Gas 456 1676.4 2009 No No Not available
D 7 SA-106C Shell / SA
Stage 1270 150 470 165 516Gr 70 Heads 26
NOT
130 OGDCL Qadirpur FECP No Train A-1307 Valerus Package skid Vessel M CALCULATE 7-MBL-2040- Discharge Bottle Raw Gas 364 3733.8 2009 No No Not available
D 7 SA-106C Shell / SA
2nd Stage 1270 350 745 180 516Gr 70 Heads 21
NOT
131 OGDCL Qadirpur FECP No Train A-1308 Valerus Package skid Vessel M CALCULATE 8-MBF-2010- Raw Gas 844.4 1676.4 2009 No No Not available
D 8
Suction Scrubber 1000 150 270 92 SA 516 Gr 70 35
NOT
132 OGDCL Qadirpur FECP No Train A-1308 Valerus Package skid Vessel M CALCULATE 8-MBF-2030- Interstage Raw Gas 692 1676.4 2009 No No Not available
D 8
Scrubber 1270 150 470 95 SA 516 Gr 70 35
NOT
133 OGDCL Qadirpur FECP No Train A-1308 Valerus Package skid Vessel M CALCULATE 8-MBL-2010- Suction Bottle 1st Raw Gas 572 1879.6 2009 No No Not available
D 8
Stage 1000 150 259 180 SA 516 Gr 70 19
NOT
134 OGDCL Qadirpur FECP No Train A-1308 Valerus Package skid Vessel M CALCULATE 8-MBL-2020- Discharge Bottle Raw Gas 410 3657.6 2009 No No Not available
D 8 SA-106C Shell / SA
1st Stage 1270 350 475 165 516Gr 70 Heads 23
NOT
135 OGDCL Qadirpur FECP No Train A-1308 Valerus Package skid Vessel M CALCULATE 8-MBL-2030- Suction Bottle 2nd Raw Gas 456 1676.4 2009 No No Not available
D 8 SA-106C Shell / SA
Stage 1270 150 470 165 516Gr 70 Heads 26
NOT
136 OGDCL Qadirpur FECP No Train A-1308 Valerus Package skid Vessel M CALCULATE 8-MBL-2040- Discharge Bottle Raw Gas 364 3733.8 2009 No No Not available
D 8 SA-106C Shell / SA
2nd Stage 1270 350 745 180 516Gr 70 Heads 21
NOT
137 OGDCL Qadirpur FECP No Train A-1309 Valerus Package skid Vessel M CALCULATE 9-MBF-2010- Raw Gas 844.4 1676.4 2009 No No Not available
D 9
Suction Scrubber 1000 150 270 92 SA 516 Gr 70 35
NOT
138 OGDCL Qadirpur FECP No Train A-1309 Valerus Package skid Vessel M CALCULATE 9-MBF-2030- Interstage Raw Gas 692 1676.4 2009 No No Not available
D 9
Scrubber 1270 150 470 95 SA 516 Gr 70 35
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Remaining
PROCESS Last
Life Equipment /
Criticality Design Design Operating Operating Design Internal Length Year Of Inspecti
Equipment Equipment Criticality Component Component Component Contents/ Last Inspection Remaining Life
S No. Corporation Field Process Area Train No. Equipment Description (High Pressure Temperature Pressure Temperature Thickness Dia (mm) manufactu on
Tag No. Type (High Tag No. Description Material Fluids Year (Years)
Medium (psig) ( F)
0
(psig) (0F) (mm) (mm) re (Yes/
Medium Specification
Low) No)
Low)
NOT
139 OGDCL Qadirpur FECP No Train A-1309 Valerus Package skid Vessel M CALCULATE 9-MBL-2010- Suction Bottle 1st Raw Gas 572 1879.6 2009 No No Not available
D 9
Stage 1000 150 259 180 SA 516 Gr 70 19
NOT
140 OGDCL Qadirpur FECP No Train A-1309 Valerus Package skid Vessel M CALCULATE 9-MBL-2020- Discharge Bottle Raw Gas 410 3657.6 2009 No No Not available
D 9 SA-106C Shell / SA
1st Stage 1270 350 475 165 516Gr 70 Heads 23
NOT
141 OGDCL Qadirpur FECP No Train A-1309 Valerus Package skid Vessel M CALCULATE 9-MBL-2030- Suction Bottle 2nd Raw Gas 456 1676.4 2009 No No Not available
D 9 SA-106C Shell / SA
Stage 1270 150 470 165 516Gr 70 Heads 26
NOT
142 OGDCL Qadirpur FECP No Train A-1309 Valerus Package skid Vessel M CALCULATE 9-MBL-2040- Discharge Bottle Raw Gas 364 3733.8 2009 No No Not available
D 9 SA-106C Shell / SA
2nd Stage 1270 350 745 180 516Gr 70 Heads 21
NOT
CALCULATE 10-MBF-
143 OGDCL Qadirpur FECP No Train A-1310 Valerus Package skid Vessel M 2010-10 Raw Gas 844.4 1676.4 2009 No No Not available
D Suction Scrubber 1000 150 270 92 SA 516 Gr 70 35
NOT
CALCULATE 10-MBF-
144 OGDCL Qadirpur FECP No Train A-1310 Valerus Package skid Vessel M 2030-10 Interstage Raw Gas 692 1676.4 2009 No No Not available
D Scrubber 1270 150 470 95 SA 516 Gr 70 35
NOT
CALCULATE 10-MBL-
145 OGDCL Qadirpur FECP No Train A-1310 Valerus Package skid Vessel M 2010-10 Suction Bottle 1st Raw Gas 572 1879.6 2009 No No Not available
D Stage 1000 150 259 180 SA 516 Gr 70 19
NOT
CALCULATE 10-MBL-
146 OGDCL Qadirpur FECP No Train A-1310 Valerus Package skid Vessel M 2020-10 Discharge Bottle SA-106C Shell / SA Raw Gas 410 3657.6 2009 No No Not available
D 1st Stage 1270 350 475 165 516Gr 70 Heads 23
NOT
CALCULATE 10-MBL-
147 OGDCL Qadirpur FECP No Train A-1310 Valerus Package skid Vessel M 2030-10 Suction Bottle 2nd SA-106C Shell / SA Raw Gas 456 1676.4 2009 No No Not available
D Stage 1270 150 470 165 516Gr 70 Heads 26
NOT
CALCULATE 10-MBL-
148 OGDCL Qadirpur FECP No Train A-1310 Valerus Package skid Vessel M 2040-10 Discharge Bottle SA-106C Shell / SA Raw Gas 364 3733.8 2009 No No Not available
D 2nd Stage 1270 350 745 180 516Gr 70 Heads 21
NOT
CALCULATE 11-MBF-
149 OGDCL Qadirpur FECP No Train A-1311 Valerus Package skid Vessel M 2010-11 Raw Gas 844.4 1676.4 2009 No No Not available
D Suction Scrubber 1000 150 270 92 SA 516 Gr 70 35
NOT
CALCULATE 11-MBF-
150 OGDCL Qadirpur FECP No Train A-1311 Valerus Package skid Vessel M 2030-11 Interstage Raw Gas 692 1676.4 2009 No No Not available
D Scrubber 1270 150 470 95 SA 516 Gr 70 35
NOT
CALCULATE 11-MBL-
151 OGDCL Qadirpur FECP No Train A-1311 Valerus Package skid Vessel M 2010-11 Suction Bottle 1st Raw Gas 572 1879.6 2009 No No Not available
D Stage 1000 150 259 180 SA 516 Gr 70 19
NOT
CALCULATE 11-MBL-
152 OGDCL Qadirpur FECP No Train A-1311 Valerus Package skid Vessel M 2020-11 Discharge Bottle SA-106C Shell / SA Raw Gas 410 3657.6 2009 No No Not available
D 1st Stage 1270 350 475 165 516Gr 70 Heads 23
NOT
CALCULATE 11-MBL-
153 OGDCL Qadirpur FECP No Train A-1311 Valerus Package skid Vessel M 2030-11 Suction Bottle 2nd SA-106C Shell / SA Raw Gas 456 1676.4 2009 No No Not available
D Stage 1270 150 470 165 516Gr 70 Heads 26
NOT
CALCULATE 11-MBL-
154 OGDCL Qadirpur FECP No Train A-1311 Valerus Package skid Vessel M 2040-11 Discharge Bottle SA-106C Shell / SA Raw Gas 364 3733.8 2009 No No Not available
D 2nd Stage 1270 350 745 180 516Gr 70 Heads 21
NOT
CALCULATE 14-MBF-
155 OGDCL Qadirpur FECP No Train A-1314 Valerus Package skid Vessel M 2010-14 Raw Gas 844.4 1676.4 2009 No No Not available
D Suction Scrubber 1000 150 270 92 SA 516 Gr 70 35
NOT
CALCULATE 14-MBF-
156 OGDCL Qadirpur FECP No Train A-1314 Valerus Package skid Vessel M 2030-14 Interstage Raw Gas 692 1676.4 2009 No No Not available
D Scrubber 1270 150 470 95 SA 516 Gr 70 35
NOT
CALCULATE 14-MBL-
157 OGDCL Qadirpur FECP No Train A-1314 Valerus Package skid Vessel M 2010-14 Suction Bottle 1st Raw Gas 572 1879.6 2009 No No Not available
D Stage 1000 150 259 180 SA 516 Gr 70 19
NOT
CALCULATE 14-MBL-
158 OGDCL Qadirpur FECP No Train A-1314 Valerus Package skid Vessel M 2020-14 Discharge Bottle SA-106C Shell / SA Raw Gas 410 3657.6 2009 No No Not available
D 1st Stage 1270 350 475 165 516Gr 70 Heads 23
NOT
CALCULATE 14-MBL-
159 OGDCL Qadirpur FECP No Train A-1314 Valerus Package skid Vessel M 2030-14 Suction Bottle 2nd SA-106C Shell / SA Raw Gas 456 1676.4 2009 No No Not available
D Stage 1270 150 470 165 516Gr 70 Heads 26
NOT
CALCULATE 14-MBL-
160 OGDCL Qadirpur FECP No Train A-1314 Valerus Package skid Vessel M 2040-14 Discharge Bottle SA-106C Shell / SA Raw Gas 364 3733.8 2009 No No Not available
D 2nd Stage 1270 350 745 180 516Gr 70 Heads 21

NOT
161 OGDCL Qadirpur Refrigeration No Train V-9107 Propane Receiver Vessel Vessel H CALCULATE Shell & Heads Propane 2000 8000 2002 Sep-17 Not in Report
D
362.6 at Full
V-9107 Volume 160 392.6 180 LTCS Not available Yes
NOT
CALCULATE Not
162 OGDCL Qadirpur Refrigeration No Train F-9102 A Duplex Filter KRAL Pump Vessel H Shell & Heads OIL+10 % available Not available 2002 No Not calculated
D F-9102 A 421 200 362.5 158 A105GrN/A106GrB Not available PROPANE No
NOT
CALCULATE Not
163 OGDCL Qadirpur Refrigeration No Train F-9102 B Duplex Filter KRAL Pump Vessel H Shell & Heads OIL+10 % available Not available 2002 No Not calculated
D F-9102 B 421 200 362.5 158 A105GrN/A106GrB Not available PROPANE No
NOT
Diesel Storage Duplex Filter near Diesel Storage CALCULATE
164 OGDCL Qadirpur Tank No Train S-6702 A Tank Vessel M S-6702 A Shell & Heads 40 ambient Not available Diesel 1661.06 Not available 1994 No Not calculated
D 75 140 10.97 No
NOT
Diesel Storage Duplex Filter near Diesel Storage CALCULATE
165 OGDCL Qadirpur Tank No Train S-6702 B Tank Vessel M S-6702 B Shell & Heads 40 ambient Not available Diesel 1661.06 Not available 1994 No Not calculated
D 75 140 10.97 No
Corrosion NOT
Inhibition CALCULATE Not
166 OGDCL Qadirpur No Train Corrosion Inhibitor Vessel Vessel L Shell & Heads Not available available
2440 3660 1995 No Not calculated
Area V-4001 A D V-4001 A 0.5 180 atmospheric 95 CRW-9110 No
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Remaining
PROCESS Last
Life Equipment /
Criticality Design Design Operating Operating Design Internal Length Year Of Inspecti
Equipment Equipment Criticality Component Component Component Contents/ Last Inspection Remaining Life
S No. Corporation Field Process Area Train No. Equipment Description (High Pressure Temperature Pressure Temperature Thickness Dia (mm) manufactu on
Tag No. Type (High Tag No. Description Material Fluids Year (Years)
Medium (psig) ( F)
0
(psig) (0F) (mm) (mm) re (Yes/
Medium Specification
Low) No)
Low)
Corrosion NOT
Inhibition CALCULATE Not
167 OGDCL Qadirpur No Train Corrosion Inhibitor Vessel Vessel L Shell & Heads Not available available
2440 3660 1995 No Not calculated
Area V-4001 B D V-4001 B 0.5 180 atmospheric 95 CRW-9110 No
Instrument NOT
Air CALCULATE Not Instrument Not
168 OGDCL Qadirpur No Train Dryer Instrument Air A-5801D/E Vessel M Shell & Heads 95 91 Not available available Air available Not available 2007 No Not calculated
Compressor A-5807 C D S.No.572565 165 500 No
Instrument NOT
Air CALCULATE Not Instrument Not
169 OGDCL Qadirpur No Train Dryer Instrument Air A-5801D/E Vessel M Shell & Heads 95 91 Not available available Air available Not available 2007 No Not calculated
Compressor A-5807 C D S.No.572566 165 500 No
Instrument NOT
Air CALCULATE Not Instrument Not
170 OGDCL Qadirpur No Train Dryer Instrument Air A-5801D/E Vessel M Shell & Heads 95 91 Not available available Air available Not available 2007 No Not calculated
Compressor A-5807 D D S.No.567930 165 500 No
Instrument NOT
Air CALCULATE Not Instrument Not
171 OGDCL Qadirpur No Train Dryer Instrument Air A-5801D/E Vessel M Shell & Heads 95 91 Not available available Air available Not available 2007 No Not calculated
Compressor A-5807 D D S.No.567942 165 500 No
NOT
CALCULATE Not Not
172 OGDCL Qadirpur FECP No Train Nitrogen Holder Vessel M Shell & Heads 54 Not in the list Not available available Nitrogen available Not available 1998 No Not calculated
X-0509 D X-0509 140.778 154.4 No
NOT
CALCULATE Not Not
173 OGDCL Qadirpur FECP Not in the list Buffer Tank Vessel M Shell & Heads 54 Not in the list Not available available Nitrogen available Not available 1998 No Not calculated
X-0509 D X-0509 140.778 154.4 No
NOT
CALCULATE Not Not
174 OGDCL Qadirpur FECP Not in the list Adsorber Vessel M Shell & Heads 85 Not in the list Not available available Nitrogen available Not available 1998 No Not calculated
X-0509 A D X-0509 A 140.778 154.4 No
NOT
CALCULATE Not Not
175 OGDCL Qadirpur FECP Not in the list Adsorber Vessel M Shell & Heads 85 Not in the list Not available available Nitrogen available Not available 1998 No Not calculated
X-0509 B D X-0509 B 140.778 154.4 No
NOT
CALCULATE Not Not
176 OGDCL Qadirpur FECP Not in the list Adsorption Air Dryer Vessel L Shell & Heads Not available available Not available available Not available 1998 No Not calculated
X-0504 A D X-0504 A 140.778 212 118.026 104 No
NOT
CALCULATE Not Not
177 OGDCL Qadirpur FECP Not in the list Adsorption Air Dryer Vessel L Shell & Heads Not available available Not available available Not available 1998 No Not calculated
X-0504 B D X-0504 B 140.778 212 118.026 104 No
NOT
CALCULATE Not Not
178 OGDCL Qadirpur FECP Not in the list Adsorption Air Dryer Vessel L Shell & Heads Not available available Not available available Not available 1998 No Not calculated
X-0504 C D X-0504 C 140.778 212 118.026 104 No

Not Not
179 OGDCL Qadirpur N/A Not in the list Propane Storage Vessel Vessel H L Shell & Heads Not in the list Not in the list Not available available Propane OD 2896 11583
available Sep-17 Not in Report
V-3201(911-
FA-110) 911-FA-10 350 200 Yes

NOT
180 OGDCL Qadirpur V-4102 Vessel H CALCULATE Shell & Heads 5 80 SA-516 Gr.70 3200 9900 1994 Yes Nov-18 Not in Report
D
Mother Plant
Flare System No Train Flare KO Vessel V-4102 75 300 13 Not available
NOT
181 OGDCL Qadirpur Instrument
Compressor
Air
V-5805 Vessel M CALCULATE Shell & Heads OD 1000 3000 1994 No Not calculated
Area No Train Inert Gas Receiver D V-5805 150 350 98 105 Not available Not available Not available No

Instrument Air
182 OGDCL Qadirpur Compressor V-5803 NOT Shell & Heads Not available OD 1300 3800 1994 No Not calculated
Area No Train Plant Air Receiver Vessel M CALCULATED V-5803 150 350 110 105 Not available Instrument Air No

Instrument Air
183 OGDCL Qadirpur Compressor V-5802 NOT Shell & Heads Not available OD1900 5500 1994 No Not calculated
Area No Train Instrument Air Receiver Vessel M CALCULATED V-5802 150 350 100 105 Not available Instrument Air No

Instrument Air Not


184 OGDCL Qadirpur Compressor V-5815 NOT Shell & Heads 70 105 Not available available
Not available 2002 No Not calculated
Area No Train Nitrogen Vessel Vessel M CALCULATED V-5815 150 350 10 Instrument Air No

185 OGDCL Qadirpur Liquid Handling S-4402 A NOT Shell & Heads 30 8 OD 1200 2000 No Not calculated
Area No Train Sand Filter Near T-4403 A Vessel L CALCULATED S-4402 A Not available Not available Carbon Steel Not available Instrument Air Not available No

Not
186 OGDCL Qadirpur V-5302 Shell & Heads 80 88 Not available available
Not available 1994 Yes Nov-18 Not in Report
NOT
Not in the list No Train LP Fuel Gas KO Drum Vessel H CALCULATED V-5302 150 330 Not available Instrument Air

187 OGDCL Qadirpur F-9210 NOT Shell & Heads Not available Not available OD 610 Not available 1981 No Not calculated
Microscrubber Near V-9209 Vessel M CALCULATED F-9210 150 680 90 38.89 Not available No
NOT
Recycle Fin Fan CALCULATE Not Not Not
188 OGDCL Qadirpur Membrane Train 1 E-2702 K-2701 First Stage After Cooler Cooler M E-2702 Header & Tubes available Not available 30 226 Permeate Gas available Not available
available No Not calculated
D Not available Not available No
NOT
Recycle Fin Fan CALCULATE Not Not Not
189 OGDCL Qadirpur Membrane Train 1 E-2703 K-2701 Second Stage After Cooler Cooler M E-2703 Header & Tubes available Not available 109 322 Permeate Gas available Not available
available No Not calculated
D Not available Not available No
NOT
Recycle Fin Fan CALCULATE
Not Not
190 OGDCL Qadirpur Membrane Train 1 E-2704 K-2701 Third Stage After Cooler Cooler M E-2704 Header & Tubes 322 Permeate Gas available Not available
available No Not calculated
D Not available Not available Not available Not available Not available No
NOT
Recycle Fin Fan CALCULATE
Not Not
191 OGDCL Qadirpur Membrane Train 1 E-2705 K-2701 Fourth Stage After Cooler Cooler M E-2705 Header & Tubes 590 Permeate Gas available Not available
available No Not calculated
D Not available Not available Not available Not available Not available No
NOT
Recycle Fin Fan CALCULATE Not Not Not
192 OGDCL Qadirpur Membrane Train 1 E-2712 K-2711 First Stage After Cooler Cooler M E-2712 Header & Tubes available Not available 30 225 Permeate Gas available Not available
available No Not calculated
D Not available Not available No
NOT
Recycle Fin Fan CALCULATE Not Not Not
193 OGDCL Qadirpur Membrane Train 1 E-2713 K-2711 Second Stage After Cooler Cooler M E-2713 Header & Tubes available Not available 109 322 Permeate Gas available Not available
available No Not calculated
D Not available Not available No
NOT
Recycle Fin Fan CALCULATE Not Not Not
194 OGDCL Qadirpur Membrane Train 1 E-2714 K-2711 Third Stage After Cooler Cooler M E-2714 Header & Tubes available Not available 332 Permeate Gas available Not available
available No Not calculated
D Not available Not available Not available No
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Remaining
PROCESS Last
Life Equipment /
Criticality Design Design Operating Operating Design Internal Length Year Of Inspecti
Equipment Equipment Criticality Component Component Component Contents/ Last Inspection Remaining Life
S No. Corporation Field Process Area Train No. Equipment Description (High Pressure Temperature Pressure Temperature Thickness Dia (mm) manufactu on
Tag No. Type (High Tag No. Description Material Fluids Year (Years)
Medium (psig) ( F)
0
(psig) (0F) (mm) (mm) re (Yes/
Medium Specification
Low) No)
Low)
NOT
Recycle Fin Fan CALCULATE Not Not Not
195 OGDCL Qadirpur Membrane Train 1 E-2715 K-2711 Fourth Stage After Cooler Cooler M E-2715 Header & Tubes available Not available 590 Permeate Gas available Not available
available No Not calculated
D Not available Not available Not available No
NOT
Recycle Fin Fan CALCULATE Not Not Not
196 OGDCL Qadirpur Membrane Train 2 E-2722 K-2721 First Stage After Cooler Cooler M E-2722 Header & Tubes available Not available 40 268 Permeate Gas available Not available
available No Not calculated
D Not available Not available No
NOT
Recycle Fin Fan CALCULATE Not Not Not
197 OGDCL Qadirpur Membrane Train 2 E-2723 K-2721 Second Stage After Cooler Cooler M E-2723 Header & Tubes available Not available 110 276 Permeate Gas available Not available
available No Not calculated
D Not available Not available No
NOT
Recycle Fin Fan CALCULATE
Not
198 OGDCL Qadirpur Membrane Train 2 E-2724 K-2721 Third Stage After Cooler Cooler M E-2724 Header & Tubes 292 293 Permeate Gas available Not available No Not calculated
D Not available Not available Not available Not available Not available No
NOT
Recycle Fin Fan CALCULATE
Not
199 OGDCL Qadirpur Membrane Train 2 E-2725 K-2721 Fourth Stage After Cooler Cooler M E-2725 Header & Tubes 732 316 Permeate Gas available Not available No Not calculated
D Not available Not available Not available Not available Not available No
NOT
Recycle Fin Fan CALCULATE Not Not Not
200 OGDCL Qadirpur Membrane Train 2 E-2732 K-2731 First Stage After Cooler Cooler M E-2732 Header & Tubes available Not available 40 268 Permeate Gas available Not available
available No Not calculated
D Not available Not available No
NOT
Recycle Fin Fan CALCULATE Not Not Not
201 OGDCL Qadirpur Membrane Train 2 E-2733 K-2731 Second Stage After Cooler Cooler M E-2733 Header & Tubes available Not available 110 276 Permeate Gas available Not available
available No Not calculated
D Not available Not available No
NOT
Recycle Fin Fan CALCULATE Not Not Not
202 OGDCL Qadirpur Membrane Train 2 E-2734 K-2731 Third Stage After Cooler Cooler M E-2734 Header & Tubes available Not available 292 293 Not available available Permeate Gas available
Not available No Not calculated
D Not available No
NOT
Recycle Fin Fan CALCULATE Not Not Not
203 OGDCL Qadirpur Membrane Train 2 E-2735 K-2731 Fourth Stage After Cooler Cooler M E-2735 Header & Tubes available Not available 732 316 Not available available Permeate Gas available
Not available No Not calculated
D Not available No
NOT
Fin Fan CALCULATE Commercial Not
204 OGDCL Qadirpur Refrigeration No Train E-9106A Propane Condenser Cooler M E-9106A Header & Tubes 362.6 176 202 150 456 Propane+Oil available
Not available 2004 No Not calculated
D Not available No
NOT
Fin Fan CALCULATE Commercial Not
205 OGDCL Qadirpur Refrigeration No Train E-9106B Propane Condenser Cooler M E-9106B Header & Tubes 362.6 176 202 150 456
Propane+Oil available
Not available 2004 No Not calculated
D Not available No
NOT
Fin Fan CALCULATE Commercial Not
206 OGDCL Qadirpur Refrigeration No Train E-9106C Propane Condenser Cooler M E-9106C Header & Tubes 362.6 176 202 150 456
Propane+Oil available
Not available 2004 No Not calculated
D Not available No
NOT
Fin Fan CALCULATE Commercial Not
207 OGDCL Qadirpur Refrigeration No Train E-9106D Propane Condenser Cooler M E-9106D Header & Tubes 362.6 176 202 150 456 Propane+Oil available
Not available 2004 No Not calculated
D Not available No
NOT
Fin Fan CALCULATE Not Not
208 OGDCL Qadirpur Refrigeration No Train E-9191A Gas Motor Water Cooler Cooler M E-9191A Header & Tubes 57 Not available Not available Not available Not available available
Water
available
Not available No Not calculated
D Not available No
NOT
Fin Fan CALCULATE Not Not
209 OGDCL Qadirpur Refrigeration No Train E-9191B Gas Motor Water Cooler Cooler M E-9191B Header & Tubes 57 Not available Not available Not available Not available available
Water
available
Not available No Not calculated
D Not available No
NOT
Fin Fan CALCULATE Not Not
210 OGDCL Qadirpur Refrigeration No Train E-9191C Gas Motor Water Cooler Cooler M E-9191C Header & Tubes 57 Not available Not available Not available Not available available
Water
available
Not available No Not calculated
D Not available No
NOT
Fin Fan CALCULATE Not Not
211 OGDCL Qadirpur Refrigeration No Train E-9191D Gas Motor Water Cooler Cooler M E-9191D Header & Tubes 57 Not available Not available Not available Not available available
Water
available
Not available No Not calculated
D Not available No
NOT
Fin Fan CALCULATE Jacket Water Not
212 OGDCL Qadirpur FECP No Train V-3550 Valerus Package Cooler M EJW Cooler 150 300 Not available Not available SA 214 0.87 25.4 10972.8 available No No Not calculated
D Not available
NOT
Fin Fan CALCULATE Not
213 OGDCL Qadirpur FECP No Train V-3550 Valerus Package Cooler M IC InterCooler 1287 350 Not available Not available A249TP304SS 0.652 19.05 10972.8 available No No Not calculated
D Not available
NOT
Fin Fan CALCULATE Jacket Water Not
214 OGDCL Qadirpur FECP No Train V-3873 Valerus Package Cooler M EJW Cooler 150 300 Not available Not available SA 214 0.87 25.4 10972.8 available No No Not calculated
D Not available
NOT
Fin Fan CALCULATE Not
215 OGDCL Qadirpur FECP No Train V-3873 Valerus Package Cooler M AC Aftercooler 1440 350 Not available Not available A249TP304SS 0.652 19.05 10972.8 available No No Not calculated
D Not available
NOT
Fin Fan CALCULATE Jacket Water Not
216 OGDCL Qadirpur FECP No Train V-3973 Valerus Package Cooler M EJW Cooler 150 300 Not available Not available SA 214 0.87 25.4 10972.8 available No No Not calculated
D Not available
NOT
Fin Fan CALCULATE Jacket Water Not
217 OGDCL Qadirpur FECP No Train V-3849 Valerus Package Cooler M EJW Cooler 150 300 Not available Not available SA 214 0.87 25.4 10972.8 available No No Not calculated
D Not available
NOT
Fin Fan CALCULATE Jacket Water Not
218 OGDCL Qadirpur FECP No Train V-3946 Valerus Package Cooler M EJW Cooler 150 300 Not available Not available SA 214 0.87 25.4 10972.8 available No No Not calculated
D Not available
NOT
Fin Fan CALCULATE Jacket Water Not
219 OGDCL Qadirpur FECP No Train V-3905 Valerus Package Cooler M EJW Cooler 150 300 Not available Not available SA 214 0.87 25.4 10972.8 available No No Not calculated
D Not available
NOT
Fin Fan CALCULATE Jacket Water Not
220 OGDCL Qadirpur FECP No Train V-3855 Valerus Package Cooler M EJW Cooler 150 300 Not available Not available SA 214 0.87 25.4 10972.8 available No No Not calculated
D Not available
NOT
Fin Fan CALCULATE Jacket Water Not
221 OGDCL Qadirpur FECP No Train V-3918 Valerus Package Cooler M EJW Cooler 150 300 Not available Not available SA 214 0.87 25.4 10972.8 available No No Not calculated
D Not available
NOT
Fin Fan CALCULATE Jacket Water Not
222 OGDCL Qadirpur FECP No Train V-3850 Valerus Package Cooler M EJW Cooler 150 300 Not available Not available SA 214 0.87 25.4 10972.8 available No No Not calculated
D Not available
NOT
Fin Fan CALCULATE Jacket Water Not
223 OGDCL Qadirpur FECP No Train V-3898 Valerus Package Cooler M EJW Cooler 150 300 Not available Not available SA 214 0.87 25.4 10972.8 available No No Not calculated
D Not available
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Remaining
PROCESS Last
Life Equipment /
Criticality Design Design Operating Operating Design Internal Length Year Of Inspecti
Equipment Equipment Criticality Component Component Component Contents/ Last Inspection Remaining Life
S No. Corporation Field Process Area Train No. Equipment Description (High Pressure Temperature Pressure Temperature Thickness Dia (mm) manufactu on
Tag No. Type (High Tag No. Description Material Fluids Year (Years)
Medium (psig) ( F)
0
(psig) (0F) (mm) (mm) re (Yes/
Medium Specification
Low) No)
Low)
NOT
Fin Fan CALCULATE Auxiliary Water Not
224 OGDCL Qadirpur FECP No Train V-3898 Valerus Package Cooler M TAW Cooler 150 300 Not available Not available SA 214 0.87 25.4 10972.8 available No No Not calculated
D Not available
NOT
Fin Fan CALCULATE Jacket Water Not
225 OGDCL Qadirpur FECP No Train V-3939 Valerus Package Cooler M EJW Cooler 150 300 Not available Not available SA 214 0.87 25.4 10972.8 available No No Not calculated
D Not available
NOT
Fin Fan CALCULATE Jacket Water Not
226 OGDCL Qadirpur FECP No Train V-3965 Valerus Package Cooler M EJW Cooler 150 300 Not available Not available SA 214 0.87 25.4 10972.8 available No No Not calculated
D Not available
NOT Header & Tubes
Permeate Fin Fan CALCULATE (172 Nos of
227 OGDCL Qadirpur Compressor No Train E-2706 Lube Oil Cooler K-2701 Cooler L E-2706 Not available Not available 19.864 Not available 1994 No No Not calculated
D Tubes) 174 203 Not available 2.768 Shell Turbo-32
NOT Header & Tubes
Permeate Fin Fan CALCULATE (387 Nos of
Not
228 OGDCL Qadirpur Compressor No Train No Tag Lube Oil Cooler K-2721 Cooler M No Tag Not available Not available 387 No. ASTM- available
Not available 2008 No No Not calculated
D Tubes) 170.4 212 B111C12200 Tubes Not available ISO VG 46
NOT Header & Tubes
Permeate Fin Fan CALCULATE (387 Nos of
Not
229 OGDCL Qadirpur Compressor No Train No Tag Lube Oil Cooler K-2731 Cooler M No Tag Not available Not available 387 No. ASTM- available
Not available 2008 No No Not calculated
D Tubes) 170.4 212 B111C12200 Tubes Not available ISO VG 46
NOT
Heat CALCULATE
Not
230 OGDCL Qadirpur Cooling Train 01 E-9001A Feed Gas Precooler Exchanger M E-9001A Shell 950 180/108 715 96 Not available 0.125 Raw Gas available
Not available Yes Sep-18 Not calculated
D Not available
NOT
Heat CALCULATE
Not
231 OGDCL Qadirpur Cooling Train 01 E-9001B Feed Gas Precooler Exchanger M E-9001B Shell 950 180/108 715 96 Not available 0.125 Raw Gas available
Not available Yes Sep-18 Not calculated
D Not available
NOT
Heat CALCULATE
Not
232 OGDCL Qadirpur Cooling Train 01 E-9002A Chillar Economizer Exchanger M E-9002A Shell 950 180/73 714 76 Not available 0.125 Raw Gas available
Not available Yes Sep-18 Not calculated
D Not available
NOT
Heat CALCULATE
Not
233 OGDCL Qadirpur Cooling Train 01 E-9002B Chillar Economizer Exchanger M E-9002B Shell 950 180/73 714 76 Not available 0.125 Raw Gas available
Not available Yes Sep-18 Not calculated
D Not available
NOT
Heat CALCULATE
Not Not
234 OGDCL Qadirpur Cooling Train 01 E-9003 Feed Gas Chiller Exchanger M E-9105 Shell 731 180/50 713 65 Raw Gas available Not available available Yes Sep-18 Not calculated
D Not available Not available
NOT
Heat CALCULATE Tube Not
235 OGDCL Qadirpur Refrigeration No Train E-9105 Sub Cooler Exchanger H E-9105 Shell 362.6 -44°F/180°F 217 100 Tube SA-179 1.65 Propane 12.575 Tube 5996 available Yes Sep-18 Not calculated
D
NOT
Recycle Heat CALCULATE Not
236 OGDCL Qadirpur membrane Train 01 E-9401 Recycle Gas Cooler Exchanger L E-9401 Shell 950 38 690 65 Tubes SA-179 Tube 2.11 14.83 Tube 6096 available Yes Aug-18 Not in Report
D Not available
NOT
Recycle Heat CALCULATE Not
237 OGDCL Qadirpur membrane Train 01 E-9402 Recycle Gas Chiller Exchanger L E-9402 Shell 731 690 65 Tubes SA-334 Tube 2.11 14.83 Tube 2438.4 available Yes Aug-18 Not in Report
D -51°F/180°F Not available
NOT
Recycle Heat CALCULATE Not
238 OGDCL Qadirpur membrane Train 02 E-9501 Recycle Feed Gas Cooler Exchanger L E-9501 Shell 950 38 680 68 Tubes SA-179 Tube 2.11 14.83 Tube 6096 available Yes Aug-18 Not in Report
D Not available

Recycle Heat NOT Not


239 OGDCL Qadirpur membrane Train 03 E-9502 Recycle Feed Gas Cooler Exchanger L CALCULATE E-9502 Shell 731 180/50 73 47/50 Tubes SA-334 Tube 2.11 14.83 Tube 2438.4 available Yes Aug-18 Not in Report
D Not available
NOT
Heat CALCULATE Tube SA-213/TP- Not
240 OGDCL Qadirpur Cooling Train 02 E-9701 Feed Gas Precooler Exchanger M E-9701 Shell 950 180/108 717 95 304 Tube 1.65 Raw Gas 12.575 Tube 7620 available Yes Aug-18 Not in Report
D
NOT
Heat CALCULATE Tube SA-213/TP- Not
241 OGDCL Qadirpur Cooling Train 02 E-9702 Chiller Economizer Exchanger M E-9702 Shell 950 180/73 716 72 304 Tube 1.65 Raw Gas 12.575 Tube 7620 available Yes Aug-18 Not in Report
D
NOT
Heat CALCULATE Tube SA-213/TP- Not
242 OGDCL Qadirpur Cooling Train 02 E-9703 Feed Gas Chiller Exchanger M E-9703 Shell 731 180/50 715 65.6 304 Tube 1.65 Raw Gas 15.75 Tube 6096 available Yes Aug-18 Not in Report
D
NOT
CALCULATE Roof, Shell & Not Not
243 OGDCL Qadirpur Utility No Train T-6701 Diesel Storage Tank Tank H E-2652 Bottom 0.37 180 ATM 100 A-283 Gr. C available Diesel 3600 3600 available Yes Sep-17 Not in Report
D
NOT
CALCULATE Not
244 OGDCL Qadirpur T-4403 A Tank L T-4403 A ATM 121 Not available available Not available 1800 2700 1994 No No Not calculated
No Train Filter Backwash Tank D Shell 180 ATM
NOT
CALCULATE Not Not
245 OGDCL Qadirpur A-4401A Tank M A-4401A 0.5 117 Not available available Not available available Not available 1995 No No Not calculated
No Train CPI Tank D Shell 180 ATM
NOT
CALCULATE Not Not
246 OGDCL Qadirpur A-4401B Tank M A-4401B 0.5 117 Not available available Not available available Not available 2008 Yes Nov-20 Not calculated
No Train CPI Tank D Shell 180 ATM

Recycle NOT Not Not Not Not


247 OGDCL Qadirpur Membrane
Train 1 E-2652 Recycle Feed Gas Heater Heater L
CALCULATED E-2652 available Not available 800 350 Not available available
Permeate Gas
available Not available available No No Not calculated
Shell

Recycle NOT Not Not Not Not


248 OGDCL Qadirpur Membrane
Train 2 E-2662 Recycle Feed Gas Heater Heater L
CALCULATED
E-2662 Tube available Not available 800 350 Not available available
Permeate Gas
available Not available available No No Not calculated

NOT
CALCULATE Not Not Not Not
249 OGDCL Qadirpur Utility No Train E-4001 Coil Heater Heater L E-4001 shell, Heads available Not available Not available Not available Not available available Not available available Not available available No No Not calculated
D
NOT
CALCULATE Not Not Not Not
250 OGDCL Qadirpur Refrigeration No Train H-9101 Oil Separator Heater Heater M H-9101 Tubes available Not available 275 150 Not available available C.P Oil available Not available available No No Not calculated
D
NOT Produced
251 OGDCL Qadirpur Metering Train 01 V-2003 Condensate/Water Separator Vessel H CALCULATE V-2003 Shell & Heads 150 180 100 77 SA-516 Gr.70 16 water/conde 1800 4900 1994 Yes Aug-22 See Remarks
D nsate
NOT Produced
252 OGDCL Qadirpur Metering No Train V-2013 Condensate Water Separator Vessel H CALCULATE V-2013 Shell & Heads 150 180 100 78 SA-516 Gr.70 14 water/conde 2136 5450 2002 Yes Aug-21 See Remarks
D nsate
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Remaining
PROCESS Last
Life Equipment /
Criticality Design Design Operating Operating Design Internal Length Year Of Inspecti
Equipment Equipment Criticality Component Component Component Contents/ Last Inspection Remaining Life
S No. Corporation Field Process Area Train No. Equipment Description (High Pressure Temperature Pressure Temperature Thickness Dia (mm) manufactu on
Tag No. Type (High Tag No. Description Material Fluids Year (Years)
Medium (psig) ( F)
0
(psig) (0F) (mm) (mm) re (Yes/
Medium Specification
Low) No)
Low)

NOT SA-516 Gr. 70 +


NACE MR01075 20 Shell Shell=57
253 OGDCL Qadirpur Cooling Train 01 V-9209 Regeneration Gas Scrubber Vessel M CALCULAT V-9209 Shell & Heads 950 600 700 84 3mm SS 316L Weld 22 Head Region. Gas 694 2488 2019 Yes Aug-21 Bottom Head=06
ED Overlay

Roof=8mm Water +
Roof, Shell & Shell=6~8 Condensate/
254 OGDCL Qadirpur Utility Train 01 T-2811 Condensate Tank Tank H H T-2811 Bottom 0.5 max. 180 ATM 95 A-283 Gr. C mm Blanketing 9144 7315 2022 - - -
Bottom=10 gas
mm

Roof=7mm Water +
Roof, Shell & Shell=6~8 Condensate/ Shell= 13
255 OGDCL Qadirpur Metering Train 01 T-9700 Produce Water Storage Tank Tank H H T-9700 Bottom 0.5 150 0.0169 82 A-283 Gr.C mm Blanketing 13716 8500 2008 Yes Jul-22 Roof= 22
Bottom=8m gas
m

Radiant section Raw Gas(MG See As Built


256 OGDCL Qadirpur Cooling Train 02 E-9901 Regeneration Gas Heater Heater H H E-9901 Coils 950 868 705 388 ASTM A 106 Gr B 7.62 out) 88.9 Darwing of OEM 2005 Yes Sep-23 Not Calculated

NOT
257 OGDCL Qadirpur FECP No Train V-1501A 1st Satge Scrubber (LP) Vessel M CALCULATE V-1501A Shell & Heads 420.03 200 70-200 41-122 SA-516 Gr.70N 26 Raw Gas 1800 4450 2021 - - -
D
NOT
258 OGDCL Qadirpur FECP No Train V-1502A 2nd Satge Scrubber (HP) Vessel M CALCULATE V-1502A Shell & Heads 505 200 174.05-319.08 125.6-140 SA-516 Gr.70N 26 Raw Gas 1500 4070 2021 - - -
D
NOT
259 OGDCL Qadirpur FECP No Train V-1501B 1st Satge Scrubber (LP) Vessel M CALCULATE V-1501B Shell & Heads 420.03 200 70-200 41-122 SA-516 Gr.70N 26 Raw Gas 1800 4450 2021 - - -
D
NOT
260 OGDCL Qadirpur FECP No Train V-1502B 2nd Satge Scrubber (HP) Vessel M CALCULATE V-1502B Shell & Heads 505 200 174.05-319.08 125.6-140 SA-516 Gr.70N 26 Raw Gas 1500 4070 2021 - - -
D
NOT
261 OGDCL Qadirpur FECP No Train V-1501C 1st Satge Scrubber (LP) Vessel M CALCULATE V-1501C Shell & Heads 420.03 200 70-200 41-122 SA-516 Gr.70N 26 Raw Gas 1800 4450 2021 - - -
D
NOT
262 OGDCL Qadirpur FECP No Train V-1502C 2nd Satge Scrubber (HP) Vessel M CALCULATE V-1502C Shell & Heads 505 200 174.05-319.08 125.6-140 SA-516 Gr.70N 26 Raw Gas 1500 4070 2021 - - -
D
NOT
Fin Fan CALCULATE 1st Satge Gas
263 OGDCL Qadirpur FECP Train A E-1501A LPC Discharge Gas Cooler #01 Cooler M E-1501A Cooler
609 400 549 5 SA-213 TP316L 2.108 Raw Gas 27.534 12500 2021 - - -
D
NOT
Fin Fan CALCULATE 2nd Satge Gas
264 OGDCL Qadirpur FECP Train A E-1502A HPC Discharge Gas Cooler #01 Cooler M E-1502A Cooler
609 400 549 5 SA-213 TP316L 1.651 Raw Gas 22.1 12500 2021 - - -
D
NOT
Fin Fan CALCULATE 1st Satge Gas
265 OGDCL Qadirpur FECP Train B E-1501B LPC Discharge Gas Cooler #01 Cooler M E-1501B Cooler
609 400 549 5 SA-213 TP316L 2.108 Raw Gas 27.534 12500 2021 - - -
D
NOT
Fin Fan CALCULATE 2nd Satge Gas
266 OGDCL Qadirpur FECP Train B E-1502B HPC Discharge Gas Cooler #01 Cooler M E-1502B Cooler
609 400 549 5 SA-213 TP316L 1.651 Raw Gas 22.1 12500 2021 - - -
D
NOT
Fin Fan CALCULATE 1st Satge Gas
267 OGDCL Qadirpur FECP Train C E-1501C LPC Discharge Gas Cooler #01 Cooler M E-1501C Cooler
609 400 549 5 SA-213 TP316L 2.108 Raw Gas 27.534 12500 2021 - - -
D
NOT
Fin Fan CALCULATE 2nd Satge Gas
268 OGDCL Qadirpur FECP Train C E-1502C HPC Discharge Gas Cooler #01 Cooler M E-1502C Cooler
609 400 549 5 SA-213 TP316L 1.651 Raw Gas 22.1 12500 2021 - - -
D
NOT
Lube Oil CALCULATE
269 OGDCL Qadirpur FECP No Train HX-901-1 Lube Oil Cooler Solar Cooler M HX-901-1 Lube Oil Cooler 150 200 39 141 SA-214 1.651 ISO VG 46 22.1 4877 2020 - - -
D
NOT
Lube Oil CALCULATE
270 OGDCL Qadirpur FECP No Train HX-901-2 Lube Oil Cooler Solar Cooler M HX-901-2 Lube Oil Cooler 150 200 39 141 SA-214 1.651 ISO VG 46 22.1 4877 2020 - - -
D
NOT
Lube Oil CALCULATE
271 OGDCL Qadirpur FECP No Train HX-901-3 Lube Oil Cooler Solar Cooler M HX-901-3 Lube Oil Cooler 150 200 39 141 SA-214 1.651 ISO VG 46 22.1 4877 2020 - - -
D
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Next Inspection Next Inspection
Remarks
External Internal

FFS as per Last inspection


Oct-19 Oct-24 Report.

FFS as per Last inspection


Oct-19 Oct-24 Report.

FFS as per Last inspection


Oct-19 Oct-24 Report.

FFS as per Last inspection


Oct-19 Oct-24 Report.

FFS as per Last inspection


Oct-19 Oct-24 Report.

FFS as per Last inspection


Oct-19 Oct-24 Report.

FFS as per Last inspection


Oct-19 Oct-24 Report.

FFS as per Last inspection


Oct-19 Oct-24 Report.

FFS as per Last inspection


Oct-19 Oct-24 Report.

FFS as per Last inspection


Oct-19 Oct-24 Report.

FFS as per Last inspection


Oct-19 Oct-24 Report.

FFS as per Last inspection


Oct-19 Oct-24 Report.

FFS as per Last inspection


Nov-23 Nov-26 Report.

FFS as per Last inspection


Apr-22 Apr-27 Report.

FFS as per Last inspection


Apr-22 Apr-27 Report.

FFS as per Last inspection


Jan-22 Jan-22 Report.
FFS as per Last inspection
Jan-22 Jan-22 Report.
FFS as per Last inspection
Jan-22 Jan-22 Report.
FFS as per Last inspection
Jan-22 Jan-22 Report.

Aug-26 Aug-31 FFS as per report

FFS as per Last inspection


Sep-27 Sep-27 Report.
FFS as per Last inspection
Oct-27 Oct-32 Report.

Jan-28 Jan-33 FFS as per Report

FFS as per Last inspection


Apr-22 Apr-27 Report.

FFS as per Last inspection


Apr-22 Apr-27 Report.

FFS as per Last inspection


Apr-22 Apr-27 Report.

FFS as per Last inspection


Apr-22 Apr-27 Report.

FFS as per Last inspection


Sep-28 Sep-33 Report.
FFS as per Last inspection
Sep-28 Sep-33 Report.
FFS as per Last inspection
Apr-22 Apr-27 Report.
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Next Inspection Next Inspection
Remarks
External Internal

FFS as per Last inspection


Sep-28 Sep-33 Report.
FFS as per Last inspection
Sep-28 Sep-33 Report.

Vessel Permanent Repair Done


- - by M/S Ravigreen in 2023

FFS as per Last inspection


Jul-20 Jul-25 Report.
FFS as per Last inspection
Jul-20 Jul-25 Report.
FFS as per Last inspection
Jul-20 Jul-25 Report.
FFS as per Last inspection
Jul-20 Jul-25 Report.
FFS as per Last inspection
Sep-27 Sep-27 Reports.

FFS as per Last inspection


Apr-22 Apr-27 Report.

FFS as per Last inspection


Apr-22 Apr-27 Report.

As per API-510. FFS Inspection


Inspection Over Due Inspection Over Due of Equipment over Due

As per API-510 Inspection of


2020 2025 Equipment over Due

Tank FFS as per Last inspection


Nov-26 Nov-36 Report.

Tank FFS as per Last inspection


Nov-26 Nov-36 Report.

No defect as per report.FFS as


Sep-22 Sep-30 per report

FFS as per Last inspection


Apr-22 Apr-27 Report.

Replaced All Coils Inlet & Outlet


manifold also in
Nov.2016.Required RARForm
Sep-28 Sep-28 as per Last inspection report.
FFS as per Last inspection
Report.

As per API-510/570 Inspection


Inspection Over Due Inspection Over Due of Equipment over Due

As per API-510/570 Inspection


Inspection Over Due Inspection Over Due of Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

No defect as per report.FFS as


Sep-18 Sep-22 per report

No defect as per report.FFS as


Sep-18 Sep-22 per report
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Next Inspection Next Inspection
Remarks
External Internal

No defect as per report.FFS as


Sep-27 Sep-33 per report

No defect as per report.FFS as


Sep-27 Sep-33 per report

FFS after reducing Operating


Aug-26 Aug-31 Pressure of Vessel 250-300
psig

Not possible because of


high LEL and it cannot FFS as per Last Inspection
Nov-23 be isolated due to Report
operational limitations

Not possible because of


high LEL and it cannot FFS as per Last Inspection
Nov-23 be isolated due to Report
operational limitations

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

UTG after Six months for


See Remarks See Remarks Remaining Life Calculation

Jan-28 Jan-33 FFS as per Report

UTG after Six months for


See Remarks See Remarks Remaining Life Calculation

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 External


Inspection Over Due 2019 Inspection of Equipment over
Due
As per API-510 External
Inspection Over Due 2019 Inspection of Equipment over
Due
As per API-510 External
Inspection Over Due 2019 Inspection of Equipment over
Due
As per API-510 External
Inspection Over Due 2019 Inspection of Equipment over
Due

Aug-26 Aug-36 FFS as per last inspection report

As per API-510 External


Inspection Over Due 2019 Inspection of Equipment over
Due
As per API-510 External
Inspection Over Due 2019 Inspection of Equipment over
Due
As per API-510 External
Inspection Over Due 2019 Inspection of Equipment over
Due
As per API-510 External
Inspection Over Due 2019 Inspection of Equipment over
Due
As per API-510 External
Inspection Over Due 2019 Inspection of Equipment over
Due
As per API-510 External
Inspection Over Due 2019 Inspection of Equipment over
Due

Not possible because of


high LEL and it cannot FFS as per Last Inspection
Nov-23 be isolated due to Report
operational limitations

As per API-510 Inspection of


Inspection Over Due 2020 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2020 Equipment over Due
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Next Inspection Next Inspection
Remarks
External Internal

As per API-510 Inspection of


Inspection Over Due 2020 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2020 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2020 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2020 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2020 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2020 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2020 Equipment over Due

FFS as per Last inspection


Oct-27 Oct-33 Reports.

FFS as per Last inspection


Oct-27 Oct-33 Reports.

FFS as per Last inspection


Oct-27 Oct-33 Reports.

FFS as per Last inspection


Oct-27 Oct-33 Reports.

FFS as per Last inspection


Oct-27 Oct-33 Reports.

No defect as per report.FFS as


Not in Report Not in Report per report

No defect as per report.FFS as


Not in Report Not in Report per report

No defect as per report.FFS as


Not in Report Not in Report per report

No defect as per report.FFS as


Not in Report Not in Report per report

No defect as per report.FFS as


Not in Report Not in Report per report

No defect as per report.FFS as


Not in Report Not in Report per report

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Next Inspection Next Inspection
Remarks
External Internal

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Next Inspection Next Inspection
Remarks
External Internal

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

As per API-510 Inspection of


Inspection Over Due 2019 Equipment over Due

Not possible because


propane vessel cannot FFS as per Last Inspection
19-Sep-18 be isolated due to Report
operational limitations

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Next Inspection Next Inspection
Remarks
External Internal

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

Not possible because


propane vessel cannot FFS as per Last Inspection
be isolated due to Report
operational limitations
18-Sep

Not possible because of


high LEL and it cannot FFS as per Last Inspection
Nov-23 be isolated due to Report
operational limitations

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

Not possible because it


cannot be isolated due to FFS as per Last Inspection
Nov-23 Report
operational limitations

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Next Inspection Next Inspection
Remarks
External Internal

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Next Inspection Next Inspection
Remarks
External Internal

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Equipment over Due
2018

As per API-510 Inspection of


Inspection Over Due Equipment over Due
2018

No defect as per report.FFS as


Inspection Over Due Not in Report per report

No defect as per report.FFS as


Inspection Over Due Not in Report per report

No defect as per report.FFS as


Inspection Over Due Not in Report per report

No defect as per report.FFS as


Inspection Over Due Not in Report per report

No defect as per report.FFS as


Inspection Over Due Not in Report per report

No defect as per report.FFS as


Inspection Over Due Not in Report per report

No defect as per report.FFS as


Not in Report Not in Report per report

No defect as per report.FFS as


Not in Report Not in Report per report

No defect as per report.FFS as


Not in Report Not in Report per report

No defect as per report.FFS as


Not in Report Not in Report per report

No defect as per report.FFS as


Not in Report Not in Report per report

No defect as per report.FFS as


Not in Report Not in Report per report

No defect as per report.FFS as


Not in Report Not in Report per report

No defect as per report.FFS as


Sep-22 Sep-30 per report

Inspection Over Due Inspection Over Due QP-10487 Tank Roof Repaired .

Design Data Not available so


Thickness Gauging to be Remaining Life cannot be
Inspection Over Due done calculated
Design Data Not available so
Thickness Gauging to Thickness Gauging to be Remaining Life cannot be
be done done calculated

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

As per API-510 Inspection of


Inspection Over Due Inspection Over Due Equipment over Due

Permanent Repair Done by M/S


See Remarks See Remarks Ravigreen with R-Stamp

Permanent Repair Done by M/S


See Remarks See Remarks Ravigreen with Repair Dossier
and Nameplate
LIFE ASSESMENT OF OGDCL QADIR PUR GAS PLANT
Next Inspection Next Inspection
Remarks
External Internal

Aug-26 Aug-36 New Vessel Installed

New Tank Erected with FRP


- - Coating Inside and CP system
Activated

Fit for service as per last


Jul-28 Sep-38 inspection report. FRP Coating
inside done by M/S SEAT.

Replaced Covection Section


Coils & Outlet manifold also in
Nov.2016.
FFS as per Last inspection
Sep-28 Sep-28 Report.
Radiant Coil replaced by M/S
AJC in July-2018

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -

- - -
Equipment
Sr .No Corporation Field Process Area Train No.
Tag No.

1 OGDCL Qadirpur Primary Membrane Train 1 A-2603 A

2 OGDCL Qadirpur Primary Membrane Train 1 A-2603 B

3 OGDCL Qadirpur Primary Membrane Train 1 A-2603 C

4 OGDCL Qadirpur Primary Membrane Train 1 A-2603 D

5 OGDCL Qadirpur Primary Membrane Train 2 A-2613 A


6 OGDCL Qadirpur Primary Membrane Train 2 A-2613 B

7 OGDCL Qadirpur Primary Membrane Train 2 A-2613 C

8 OGDCL Qadirpur Primary Membrane Train 2 A-2613 D

9 OGDCL Qadirpur Primary Membrane Train 2 A-2613 E

10 OGDCL Qadirpur Primary Membrane Train 3 A-2623 A

11 OGDCL Qadirpur Primary Membrane Train 3 A-2623 B


12 OGDCL Qadirpur Primary Membrane Train 3 A-2623 C

13 OGDCL Qadirpur Recycle Membrane Train 1 A-2653

14 OGDCL Qadirpur Recycle Membrane Train 2 A-2663


Equipment Component Component Component
Equipment Description
Type Tag No. Description Type

Permeate Membrane Skid skid

Permeate Membrane Skid skid

Permeate Membrane Skid skid

Permeate Membrane Skid skid

Permeate Membrane Skid skid


Permeate Membrane Skid skid

Permeate Membrane Skid skid

Permeate Membrane Skid skid

Permeate Membrane Skid skid

Permeate Membrane Skid skid

Permeate Membrane Skid skid


Permeate Membrane Skid skid

Recycle Permeate Membrane Skid skid

Recycle Permeate Membrane Skid skid


Design Operating Equipment /
Design Operating Design
Pressure Temperatu Component Contents/
Temperature Pressure Thickness
re Material Fluids
(0F) (psig) (mm)
(psig) ( F)
0
Specification

Permeate /
700 75 Residual/Fee
d Gas

Permeate /
700 75 Residual/Fee
d Gas

Permeate /
700 75 Residual/Fee
d Gas

Permeate /
700 75 Residual/Fee
d Gas

Permeate /
700 75 Residual/Fee
d Gas
Permeate /
700 75 Residual/Fee
d Gas

Permeate /
700 75 Residual/Fee
d Gas

Permeate /
700 75 Residual/Fee
d Gas

Permeate /
700 75 Residual/Fee
d Gas

Permeate /
700 75 Residual/Fee
d Gas

Permeate /
700 75 Residual/Fee
d Gas
Permeate /
700 75 Residual/Fee
d Gas

Permeate /
Recycle
680 68
Residual/Ven
t

Permeate
Gas/
680 68
Residual/Ven
t
Risk Ranking
Internal Overall Length Year Of
RBI Major Action
Dia (Low / (mm) manufactu Date Date
Status Finding Taken
(mm) Medium / re
High)
Major Major Action Major Action
Date Date External Internal Remarks
Finding Finding Taken Finding Taken
0
Next
Next
Inspecti
Inspecti
Reamin on
on Date
Require g Frequen
Inspecti Reamin on the
d Corrosi MAWP cy on
on Corrosi g Life MAWP Basis of Insulati
Thickne on (Dish Basis of
Thickne on Rate Assess (Shell) Next on
ss allowan Ends) Current
ss ment Inspecti
(mm) ce Corrosi
(mm) on
(mm) on
Frequen
Allowan
cy
ces
Duratio
DAMAG
n of CONTRI Final
Inspecti E MITIGA
Inspecti BUTING Remark
on type MECHA TION
on FACTOR s
NISM
Activity
Equipment Tag
Sr .No Corporation Field Process Area Train No.
No.

55 OGDCL Qadirpur FECP No Train V-4701

56 OGDCL Qadirpur FECP No Train V-4701A

57 OGDCL Qadirpur FECP No Train V-4701B

58 OGDCL Qadirpur FECP No Train V-4701C

59 OGDCL Qadirpur FECP No Train V-4701D

60 OGDCL Qadirpur FECP Utility No Train D-4701 A

61 OGDCL Qadirpur FECP Utility No Train D-4701 A

62 OGDCL Qadirpur FECP Utility No Train D-4701 B

63 OGDCL Qadirpur FECP Utility No Train D-4701 B


Equipment Description Equipment Type Component Tag No. Component Description Component Type

Plant Air receiver Vessel Vessel

Plant Air receiver Vessel Vessel

Plant Air receiver Vessel Vessel

Plant Air receiver Vessel Vessel

Plant Air receiver Vessel Vessel

Dryer Instrument Air 4701 A/B Vessel

Dryer Instrument Air 4701 A/B Vessel

Dryer Instrument Air 4701 A/B Vessel

Dryer Instrument Air 4701 A/B Vessel


Design Operating
Design Pressure Operating Temperature Equipment / Component Design Thickness
Temperature Pressure Contents/Fluids
(psig) (0F) Material Specification (mm)
(0F) (psig)

147 100 87 Plant Air

147 100 87 Instrument Air

147 100 87 Instrument Air

147 100 87 Instrument Air

147 100 87 Instrument Air

176.4 100 87 Instrument Air


122

176.4 100 87 Instrument Air


122

176.4 100 87 Instrument Air


122

176.4 100 87 Instrument Air


122
Length
Internal Dia Year Of Major Action
(mm) RBI Status Date Major Finding Action Taken Date Date Major Finding
(mm) manufacture Finding Taken

2010

2010

2010

2010

2010
Inspecti Reaming
Required
Major Action on Corrosion Corrosion
Date External Internal Remarks Thickness
Finding Taken Thicknes allowance Rate
(mm)
s (mm)
(mm)
Next Inspection
MAWP MAWP Frequency on Basis of Next Inspection Date on the Basis of Next
Reaming Life Assessment
(Shell) (Dish Ends) Current Corrosion Inspection Frequency
Allowances
Insulation Inspection type Duration of Inspection Activity DAMAGE MECHANISM CONTRIBUTING FACTOR MITIGATION
Final Remarks
Corpora Equipment
Sr .No Field Process Area Train No.
tion Tag No.

1 OGDCL Qadirpur FECP Train A E-0101A


2 OGDCL Qadirpur FECP Train A E-0102A
3 OGDCL Qadirpur FECP Train B E-0101B
4 OGDCL Qadirpur FECP Train B E-0102B
5 OGDCL Qadirpur FECP Train C E-0101C
6 OGDCL Qadirpur FECP Train C E-0102C
7 OGDCL Qadirpur FECP Train A HX-901-1
8 OGDCL Qadirpur FECP Train B HX-901-2
9 OGDCL Qadirpur FECP Train C HX-901-3
10 OGDCL Qadirpur Recycle Membrane Train 1 E-2702
11 OGDCL Qadirpur Recycle Membrane Train 1 E-2703
12 OGDCL Qadirpur Recycle Membrane Train 1 E-2704
13 OGDCL Qadirpur Recycle Membrane Train 1 E-2705
14 OGDCL Qadirpur Recycle Membrane Train 1 E-2712
15 OGDCL Qadirpur Recycle Membrane Train 1 E-2713
16 OGDCL Qadirpur Recycle Membrane Train 1 E-2714
17 OGDCL Qadirpur Recycle Membrane Train 1 E-2715
18 OGDCL Qadirpur Recycle Membrane Train 2 E-2722
19 OGDCL Qadirpur Recycle Membrane Train 2 E-2723
20 OGDCL Qadirpur Recycle Membrane Train 2 E-2724
21 OGDCL Qadirpur Recycle Membrane Train 2 E-2725
22 OGDCL Qadirpur Recycle Membrane Train 2 E-2732
23 OGDCL Qadirpur Recycle Membrane Train 2 E-2733
24 OGDCL Qadirpur Recycle Membrane Train 2 E-2734
25 OGDCL Qadirpur Recycle Membrane Train 2 E-2735
26 OGDCL Qadirpur Refrigeration No Train E-9106A
27 OGDCL Qadirpur Refrigeration No Train E-9106B
28 OGDCL Qadirpur Refrigeration No Train E-9106C
29 OGDCL Qadirpur Refrigeration No Train E-9106D
30 OGDCL Qadirpur Refrigeration No Train E-9191A
31 OGDCL Qadirpur Refrigeration No Train E-9191B
32 OGDCL Qadirpur Refrigeration No Train E-9191C
33 OGDCL Qadirpur Refrigeration No Train E-9191D
34 OGDCL Qadirpur Cooling Train 01 E-9208
35 OGDCL Qadirpur Cooling Train 02 E-9808
36 OGDCL Qadirpur FECP No Train V-3550
37 OGDCL Qadirpur FECP No Train V-3550
38 OGDCL Qadirpur FECP No Train V-3550
39 OGDCL Qadirpur FECP No Train V-3550
40 OGDCL Qadirpur FECP No Train V-3873
41 OGDCL Qadirpur FECP No Train V-3873
42 OGDCL Qadirpur FECP No Train V-3873
43 OGDCL Qadirpur FECP No Train V-3873
44 OGDCL Qadirpur FECP No Train V-3973
45 OGDCL Qadirpur FECP No Train V-3973
46 OGDCL Qadirpur FECP No Train V-3973
47 OGDCL Qadirpur FECP No Train V-3973
48 OGDCL Qadirpur FECP No Train V-3849
49 OGDCL Qadirpur FECP No Train V-3849
50 OGDCL Qadirpur FECP No Train V-3849
51 OGDCL Qadirpur FECP No Train V-3849
52 OGDCL Qadirpur FECP No Train V-3946
53 OGDCL Qadirpur FECP No Train V-3946
54 OGDCL Qadirpur FECP No Train V-3946
55 OGDCL Qadirpur FECP No Train V-3946
56 OGDCL Qadirpur FECP No Train V-3943
57 OGDCL Qadirpur FECP No Train V-3943
58 OGDCL Qadirpur FECP No Train V-3943
59 OGDCL Qadirpur FECP No Train V-3943
60 OGDCL Qadirpur FECP No Train V-3905
61 OGDCL Qadirpur FECP No Train V-3905
62 OGDCL Qadirpur FECP No Train V-3905
63 OGDCL Qadirpur FECP No Train V-3905
64 OGDCL Qadirpur FECP No Train V-3869
65 OGDCL Qadirpur FECP No Train V-3869
66 OGDCL Qadirpur FECP No Train V-3869
67 OGDCL Qadirpur FECP No Train V-3869
68 OGDCL Qadirpur FECP No Train V-3855
69 OGDCL Qadirpur FECP No Train V-3855
70 OGDCL Qadirpur FECP No Train V-3855
71 OGDCL Qadirpur FECP No Train V-3855
72 OGDCL Qadirpur FECP No Train V-3918
73 OGDCL Qadirpur FECP No Train V-3918
74 OGDCL Qadirpur FECP No Train V-3918
75 OGDCL Qadirpur FECP No Train V-3918
76 OGDCL Qadirpur FECP No Train V-3850
77 OGDCL Qadirpur FECP No Train V-3850
78 OGDCL Qadirpur FECP No Train V-3850
79 OGDCL Qadirpur FECP No Train V-3850
80 OGDCL Qadirpur FECP No Train V-3898
81 OGDCL Qadirpur FECP No Train V-3898
82 OGDCL Qadirpur FECP No Train V-3898
83 OGDCL Qadirpur FECP No Train V-3898
84 OGDCL Qadirpur FECP No Train V-3939
85 OGDCL Qadirpur FECP No Train V-3939
86 OGDCL Qadirpur FECP No Train V-3939
87 OGDCL Qadirpur FECP No Train V-3939
88 OGDCL Qadirpur FECP No Train V-3965
89 OGDCL Qadirpur FECP No Train V-3965
90 OGDCL Qadirpur FECP No Train V-3965
91 OGDCL Qadirpur FECP No Train V-3965
92 OGDCL Qadirpur Permeate Compressor E-2706
93 OGDCL Qadirpur Permeate Compressor E-2716
94 OGDCL Qadirpur Permeate Compressor No Tag
95 OGDCL Qadirpur Permeate Compressor No Tag
Component
Equipment Description Equipment Type
Tag No.

LPC Discharge gas cooler #01 Fin Fan Cooler


HPC Discharge Gas Cooler #01 Fin Fan Cooler
LPC Discharge Gas Cooler #01 Fin Fan Cooler
HPC Discharge Gas Cooler #01 Fin Fan Cooler
LPC Discharge Gas Cooler #01 Fin Fan Cooler
HPC Discharge Gas Cooler #01 Fin Fan Cooler
Lube Oil Cooler Solar Turbine A Fin Fan Cooler
Lube Oil Cooler Solar Turbine B Fin Fan Cooler
Lube Oil Cooler Solar Turbine C Fin Fan Cooler
K-2701 First Stage After Cooler Fin Fan Cooler
K-2701 Second Stage After Cooler Fin Fan Cooler
K-2701 Third Stage After Cooler Fin Fan Cooler
K-2701 Fourth Stage After Cooler Fin Fan Cooler
K-2711 First Stage After Cooler Fin Fan Cooler
K-2711 Second Stage After Cooler Fin Fan Cooler
K-2711 Third Stage After Cooler Fin Fan Cooler
K-2711 Fourth Stage After Cooler Fin Fan Cooler
K-2721 First Stage After Cooler Fin Fan Cooler
K-2721 Second Stage After Cooler Fin Fan Cooler
K-2721 Third Stage After Cooler Fin Fan Cooler
K-2721 Fourth Stage After Cooler Fin Fan Cooler
K-2731 First Stage After Cooler Fin Fan Cooler
K-2731 Second Stage After Cooler Fin Fan Cooler
K-2731 Third Stage After Cooler Fin Fan Cooler
K-2731 Fourth Stage After Cooler Fin Fan Cooler
Propane Condenser Fin Fan Cooler
Propane Condenser Fin Fan Cooler
Propane Condenser Fin Fan Cooler
Propane Condenser Fin Fan Cooler
Gas Motor Water Cooler Fin Fan Cooler
Gas Motor Water Cooler Fin Fan Cooler
Gas Motor Water Cooler Fin Fan Cooler
Gas Motor Water Cooler Fin Fan Cooler
Regeneration Gas Cooler Fin Fan Cooler
Regeneration Gas Cooler Fin Fan Cooler
Valerus Package Fin Fan Cooler EJW
Valerus Package Fin Fan Cooler TAW
Valerus Package Fin Fan Cooler IC
Valerus Package Fin Fan Cooler AC
Valerus Package Fin Fan Cooler EJW
Valerus Package Fin Fan Cooler TAW
Valerus Package Fin Fan Cooler IC
Valerus Package Fin Fan Cooler AC
Valerus Package Fin Fan Cooler EJW
Valerus Package Fin Fan Cooler TAW
Valerus Package Fin Fan Cooler IC
Valerus Package Fin Fan Cooler AC
Valerus Package Fin Fan Cooler EJW
Valerus Package Fin Fan Cooler TAW
Valerus Package Fin Fan Cooler IC
Valerus Package Fin Fan Cooler AC
Valerus Package Fin Fan Cooler EJW
Valerus Package Fin Fan Cooler TAW
Valerus Package Fin Fan Cooler IC
Valerus Package Fin Fan Cooler AC
Valerus Package Fin Fan Cooler EJW
Valerus Package Fin Fan Cooler TAW
Valerus Package Fin Fan Cooler IC
Valerus Package Fin Fan Cooler AC
Valerus Package Fin Fan Cooler EJW
Valerus Package Fin Fan Cooler TAW
Valerus Package Fin Fan Cooler IC
Valerus Package Fin Fan Cooler AC
Valerus Package Fin Fan Cooler EJW
Valerus Package Fin Fan Cooler TAW
Valerus Package Fin Fan Cooler IC
Valerus Package Fin Fan Cooler AC
Valerus Package Fin Fan Cooler EJW
Valerus Package Fin Fan Cooler TAW
Valerus Package Fin Fan Cooler IC
Valerus Package Fin Fan Cooler AC
Valerus Package Fin Fan Cooler EJW
Valerus Package Fin Fan Cooler TAW
Valerus Package Fin Fan Cooler IC
Valerus Package Fin Fan Cooler AC
Valerus Package Fin Fan Cooler EJW
Valerus Package Fin Fan Cooler TAW
Valerus Package Fin Fan Cooler IC
Valerus Package Fin Fan Cooler AC
Valerus Package Fin Fan Cooler EJW
Valerus Package Fin Fan Cooler TAW
Valerus Package Fin Fan Cooler IC
Valerus Package Fin Fan Cooler AC
Valerus Package Fin Fan Cooler EJW
Valerus Package Fin Fan Cooler TAW
Valerus Package Fin Fan Cooler IC
Valerus Package Fin Fan Cooler AC
Valerus Package Fin Fan Cooler EJW
Valerus Package Fin Fan Cooler TAW
Valerus Package Fin Fan Cooler IC
Valerus Package Fin Fan Cooler AC
Lube Oil Cooler K-2701 Fin Fan Cooler
Lube Oil Cooler K-2711 Fin Fan Cooler
Lube Oil Cooler K-2721 Fin Fan Cooler
Lube Oil Cooler K-2731 Fin Fan Cooler
Design Design Operating
Compon Operating
Pressure Temperat Temperat
Component Description ent Pressure
ure ure
Type (psig)
(psig) ( F)
0
(0F)

1100 390 550 275


1100 370 750 250
1100 390 550 275
1100 370 750 250
1100 390 550 275
1100 370 750 250
216 300
216 300
216 300
30 226
109 322
322
590
30 225
109 322
332
590
40 268
110 276
292 293
732 316
40 268
110 276
292 293
732 316
362.6 176 202 150

362.6 176 202 150

362.6 176 202 150

362.6 176 202 150

57

57
57

57

710 450
711 240
Jacket Water Cooler 150 300
Auxiliary Water Cooler 150 300
InterCooler 1287 350
Aftercooler 1440 350
Jacket Water Cooler 150 300
Auxiliary Water Cooler 150 300
InterCooler 1287 350
Aftercooler 1440 350
Jacket Water Cooler 150 300
Auxiliary Water Cooler 150 300
InterCooler 1287 350
Aftercooler 1440 350
Jacket Water Cooler 150 300
Auxiliary Water Cooler 150 300
InterCooler 1287 350
Aftercooler 1440 350
Jacket Water Cooler 150 300
Auxiliary Water Cooler 150 300
InterCooler 1287 350
Aftercooler 1440 350
Jacket Water Cooler 150 300
Auxiliary Water Cooler 150 300
InterCooler 1287 350
Aftercooler 1440 350
Jacket Water Cooler 150 300
Auxiliary Water Cooler 150 300
InterCooler 1287 350
Aftercooler 1440 350
Jacket Water Cooler 150 300
Auxiliary Water Cooler 150 300
InterCooler 1287 350
Aftercooler 1440 350
Jacket Water Cooler 150 300
Auxiliary Water Cooler 150 300
InterCooler 1287 350
Aftercooler 1440 350
Jacket Water Cooler 150 300
Auxiliary Water Cooler 150 300
InterCooler 1287 350
Aftercooler 1440 350
Jacket Water Cooler 150 300
Auxiliary Water Cooler 150 300
InterCooler 1287 350
Aftercooler 1440 350
Jacket Water Cooler 150 300
Auxiliary Water Cooler 150 300
InterCooler 1287 350
Aftercooler 1440 350
Jacket Water Cooler 150 300
Auxiliary Water Cooler 150 300
InterCooler 1287 350
Aftercooler 1440 350
Jacket Water Cooler 150 300
Auxiliary Water Cooler 150 300
InterCooler 1287 350
Aftercooler 1440 350
174 203
174 203
170.4 212
170.4 212
Risk
Equipment / Design Ranking
Length Year Of
Component Thickne Contents/ Internal Overall RBI
(mm) manufa
Material ss Fluids Dia (Low / Status
cture
Specification (mm) (mm) Medium
/ High)
193 No.Tubes Raw Gas 1998 Medium
148 No. Tubes Raw Gas 1998 Medium
193 No.Tubes Raw Gas 1998 Medium
148 No. Tubes Raw Gas 1998 Medium
193 No.Tubes Raw Gas 1998 Medium
148 No. Tubes Raw Gas 1998 Medium
ISO VG 46
ISO VG 46
ISO VG 46
Permeate Gas Medium
Permeate Gas Medium
Permeate Gas Medium
Permeate Gas Medium
Permeate Gas Medium
Permeate Gas Medium
Permeate Gas Medium
Permeate Gas Medium
Permeate Gas Medium
Permeate Gas Medium
Permeate Gas Medium
Permeate Gas Medium
Permeate Gas Medium
Permeate Gas Medium
Permeate Gas Medium
Permeate Gas Medium
456 Commercial 2004
Propane+Oil
456 Commercial 2004
Propane+Oil
456 Commercial 2004
Propane+Oil
456 Commercial 2004
Propane+Oil
Water

Water
Water Medium
Water

SS TP 304 (SML) Region. Gas Medium Medium


Region. Gas Medium
SA 214 0.87 25.4 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
SA 214 0.87 25.4 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
A249TP304SS 0.652 19.05 10972.8 2009
172 No.Tubes 2.768 Shell Turbo-32 19.864 1994
172 No.Tubes 2.768 Shell Turbo-32 19.864 1994
387 No. ASTM-B111C12200 TubeISO VG 46 2008
387 No. ASTM-B111C12200 TubeISO VG 46 2008
Major Action Major Major Action Major
Date Date Date Date
Finding Taken Finding Finding Taken Finding
1-Aug-11
Require
Reaming Reamin
d
Action Externa Inspection Corrosion Corrosi g Life
Internal Remarks Thickne
Taken l Thickness allowance on Rate Assess
ss
(mm) (mm) ment
(mm)
Satisfactory.
No of
Tubes=156,
OD=25.4 mm,
t=2.11 mm
Next
Next Inspection
Inspection
Frequency on
MAWP MAWP Date on the
Basis of Current Insulation
(Shell) (Dish Ends) Basis of Next
Corrosion
Inspection
Allowances
Frequency
Duration of
DAMAGE CONTRIBUTING
Inspection type Inspection MITIGATION
MECHANISM FACTOR
Activity
Final
Remarks
Sr .No Corporation Field Process Area Train No.

1 OGDCL Qadirpur Cooling Train 01

2 OGDCL Qadirpur Cooling Train 01

3 OGDCL Qadirpur Cooling Train 01

4 OGDCL Qadirpur Cooling Train 01

5 OGDCL Qadirpur Cooling Train 01

4 OGDCL Qadirpur Cooling Train 01

5 OGDCL Qadirpur Cooling Train 01

6 OGDCL Qadirpur Cooling Train 01

7 OGDCL Qadirpur Cooling Train 01

8 OGDCL Qadirpur Cooling Train 01

9 OGDCL Qadirpur Refrigeration No Train

10 OGDCL Qadirpur Refrigeration No Train

11 OGDCL Qadirpur Recycle membrane Train 01

12 OGDCL Qadirpur Recycle membrane Train 01

13 OGDCL Qadirpur Recycle membrane Train 01

14 OGDCL Qadirpur Recycle membrane Train 01

15 OGDCL Qadirpur Train 02


16 OGDCL Qadirpur Train 02

17 OGDCL Qadirpur Cooling Train 02

18 OGDCL Qadirpur Cooling Train 02

19 OGDCL Qadirpur Cooling Train 02

20 OGDCL Qadirpur Cooling Train 02

21 OGDCL Qadirpur Cooling Train 02

22 OGDCL Qadirpur Cooling Train 02

23 OGDCL Qadirpur PEL No Train

24 OGDCL Qadirpur PEL No Train

25 OGDCL Qadirpur PEL No Train

26 OGDCL Qadirpur PEL No Train

27 OGDCL Qadirpur PEL No Train


Equipment Tag
Equipment Description Equipment Type Component Tag No.
No.

E-9001A Feed Gas Precooler Heat Exchanger

E-9001A Feed Gas Precooler Heat Exchanger

E-9001B Feed Gas Precooler Heat Exchanger

E-9001B Feed Gas Precooler Heat Exchanger

E-9002A Chillar Economizer Heat Exchanger

E-9002A Chillar Economizer Heat Exchanger

E-9002B Chillar Economizer Heat Exchanger

E-9002B Chillar Economizer Heat Exchanger

E-9003 Feed Gas Chiller Heat Exchanger

E-9003 Feed Gas Chiller Heat Exchanger

E-9105 Sub Cooler Heat Exchanger

E-9105 Sub Cooler Heat Exchanger

E-9401 Recycle Gas Cooler Heat Exchanger

E-9401 Recycle Gas Cooler Heat Exchanger

E-9402 Recycle Gas Chiller Heat Exchanger

E-9402 Recycle Gas Chiller Heat Exchanger

E-9501 Recycle Feed Gas Cooler Heat Exchanger


E-9501 Recycle Feed Gas Cooler Heat Exchanger

E-9701 Feed Gas Precooler Heat Exchanger

E-9701 Feed Gas Precooler Heat Exchanger

E-9702 Chiller Economizer Heat Exchanger

E-9702 Chiller Economizer Heat Exchanger

E-9703 Feed Gas Chiller Heat Exchanger

E-9703 Feed Gas Chiller Heat Exchanger

- Glycol to Glycol Exchanger Heat Exchanger

Glycol to gas exchanger Heat Exchanger Shell

Glycol to gas exchanger Heat Exchanger Tube

Reflux Column Heat Exchanger

H-500 Glycol Reboiler Heat Exchanger


Operati Operati
Equipment /
Design Design ng ng
Component
Component Description Pressure Temperatur Pressur Temper
Material
(psig) e (0F) e ature
Specification
(psig) (0F)

Shell 950 180/108 715 96 SA 516-70N

Tube 950 180/108 715 96 SA 213-TP 304L

Shell 950 180/108 715 96 SA 516-70N

Tube 950 180/108 715 96 SA 213-TP 304L

Shell 950 180/73 714 76 SA 516-70N

Tube 950 180/92 714 76 SA 213-TP 304L

Shell 950 180/73 714 76 SA 516-70N

Tube 950 180/92 714 76 SA 213-TP 304L

Shell 731 180/50 713 65 SA 516-70N

Tube 950 180/81 713 65 SA 213-TP 304L

Shell 362.6 -44°F/180°F 217 100

Tube 304.6 -44°F/180°F 217 100

Shell 950 38 690 65 SA 516-70

Tube 950 180 690 65 SA 179

Shell 731 690 65 SA 516-70


-51°F/180°F
Tube 950 690 65 SA 334-6
38°F/180°F
Shell 950 38 680 68 SA 516-70
Tube 950 180 680 68 SA 179

Shell 950 180/108 717 95 SA 516-70

Tube 950 180/108 717 95 SA 213-TP 304L

Shell 950 180/73 716 72 SA 516-70

Tube 950 180/92 716 72 SA 213-TP 304L

Shell 731 180/50 715 65.6

Tube 950 180/81 715 65.6

700 200

TEMA Class C Type BEM Single Pass 935 300 700 180 SA-53B

TEMA Class C Type BEM Single Pass 935 300 700 110 SA-179

atmospheric 310

atmospheric 310
Risk
Ranking
Design Internal Length
No Of Overall
Thickness CA (in) Contents/Fluids Dia (mm)
Tubes (Low /
(mm) (mm)
Medium
/ High)

42 0.125 Raw Gas 1524 N/A 10807

1.651 0.0625 Raw Gas 15.875 OD 3289 7620

42 0.125 Raw Gas 1524 N/A 10807

1.651 0.0625 Raw Gas 15.875 OD 3289 7620

37 0.125 Raw Gas 1346.2 N/A 4482.8

1.65 0.0625 Raw Gas 15.875 OD 2329 4876.8

37 0.125 Raw Gas 1346.2 N/A 4482.8

1.65 0.0625 Raw Gas 15.875 OD 2329 4876.8

47 0.125 Raw Gas 2311.4 N/A 6080

1.65 0.0625 Raw Gas 19.05 OD 2588 6096

Propane

Propane

12.846 0.125 Permeate/Recycle 533.4 N/A 5940


Residue Gas

2.11 0.125 Permeate/Recycle 19.05 OD 266 6096


Residue Gas

12.846 0.125 Permeate Gas 914.4 N/A 2300

2.11 0.125 Permeate Gas 19.05 OD 266 6096

12.846 0.125 Permeate/Recycle 533.4 N/A 5940


Residue Gas
2.11 0.125 Permeate/Recycle 19.05 OD 266 6096
Residue Gas

0.125 Raw Gas

0.0625 Raw Gas 15.875 OD 3338 7620

0.125 Raw Gas

0.0625 Raw Gas 15.875 OD 2368 7620

0.125 Raw Gas

0.0625 Raw Gas

TEG

TEG 273 3658

Gas 19 3658

TEG

TEG
915 3353
Year Of
manufa External Internal Remarks
cture

2002

2002

2002

2002

2002

2002

2002

2002

2002

2002

2004

2004

2002

2002

2004

2004

2004
2004

2008

2008

2008

2008

2008

2008
Inspection Thickness Required Thickness
(mm) (mm)
Reaming Corrosion
allowance Corrosion Rate Reaming Life Assessment
(mm)
Next Inspection
Next Inspection Date
MAWP MAWP Frequency on Basis of
on the Basis of Next
(Shell) (Dish Ends) Current Corrosion
Inspection Frequency
Allowances
Insulation Inspection type Duration of Inspection Activity
Final
CONTRIBUTING
DAMAGE MECHANISM MITIGATION Remark
FACTOR
s
Equipm
Corpora Process Train
Sr .No Field ent Tag Equipment Description
tion Area No.
No.

1 OGDCL Qadirpur PEL No Train T-600 Surge Tank

2 OGDCL Qadirpur Utility Train 01 T-2801 Condensate Tank

3 OGDCL Qadirpur Utility Train 01 T-2811 Condensate Tank

4 OGDCL Qadirpur Utility No Train T-2821 New Condensate Tank

5 OGDCL Qadirpur Utility No Train T-4405A Produce Water Tank

6 OGDCL Qadirpur Utility No Train T-6701 Diesel Storage Tank

7 OGDCL Qadirpur Metering Train 01 T-9700 Produce Water Storage Tank

8 OGDCL Qadirpur
No Train T-4403 A Filter Backwash Tank

9 OGDCL Qadirpur A-4401A


No Train CPI Tank

10 OGDCL Qadirpur A-4401B


No Train CPI Tank
Operati Operati
Compon Design Design Equipment /
Equipm Compon Compon ng ng
ent Pressur Temper Component
ent ent Tag ent Pressur Temper
Descript e ature Material
Type No. Type e ature
ion (psig) (0F) Specification
(psig) (0F)

Tank 900 ATM 280

Tank 0.5 max.180 ATM 95 A-283 Gr. C

Tank 0.5 max. 180 ATM 95

Tank 0.5 180 ATM 95 A-283 Gr. C

Tank 0.36 180 ATM 121 A-283 Gr. C

Tank 0.37 180 ATM 100

Tank 0.5 150 0.0169 82 A-283 Gr.C

Tank ATM 121


180 ATM

Tank 0.5 117


180 ATM

Tank 0.5 117


180 ATM
Risk
Design Ranking
Length Year Of
Thickne Internal Overall RBI Major
Contents/Fluids (mm) manufa Date
ss Dia (Low / Status Finding
cture Current
(mm) (mm) Medium
thicknes
Was
/ High) s is less
observe
thand onthe
Raw Gas 915 3048 ### required
product
Thickne
thicknes
side as
ss loss
s. Not
well as
Water + safeon for
on soil
Condensate/ 8229.6 7300 Medium High ### bottom
operatio
side.NilAll
Blanketing gas plates,
n
37
pitting
bottom
Water + on shell
plates
Condensate/ 9144 7300 High ### plates,
were
Blanketing gas uniform
inspecte
pitting
d
Deep
Water + on
Condensate/ 13716 9000 High ### through
pitting
bottom
MFL
on
Blanketing gas plates
inside
bottom
up
42 to
platesft
Produced Water 4572 4600 Medium ### 2.5mm
Diamete
on 05
r tank.
location
Total
s. Patch04
Nos
work
Diesel 3600 3600 plate
recomm
were
ended.
Water + found
Condensate/ 13000 ### pitted
Blanketing gas from
product
side (top
side)
1800 2700 1994 having
pit
depth
range of
1995 1~6
mm and
03 nos
plates
2008 found
with
through
holes.
(For
further
details
refer
individu
al plate
sketches
given in
this
report).
Through
hole -
Tank
Action observe
T-2801:
Major Major Action Major Action Externa
Date 3dto
on7 Date Date
Taken Finding Finding Taken Finding Taken l
tank
mm
shell
pitting
plate
observe no
P7/C1
d on
just
bottom
above
plate
Severe
shell
no2/1,
pittingto
bottom
3/1, 4/1,
on first Patch
### joint
4/2. and
5/1.
shell work 5
5/2also
and
course. done.
deep
6/1
Deep
pittingof
Detail
pitting &
### 5~6mm
patch Repair
leakage
recorde
plate
on HAZ work
d.near
andof
area done.
### by
buildlapofup Shell to 5
through
area see
welds on bottom
hole.
attached
bottom seal
Cluster
Annexur
plates weld
of
e done.
pitting
recorde
Defects d
repaired 1.5~2m
through m
patch recorde
work. d on
FRP different
cotaing location
done on s on all
shell, shell
bottom plates.
& roof. Through
hole on
bottom
plate.
Reamin
Require g
Inspecti Reamin
d Corrosi
on Corrosi g Life MAWP
Internal Remarks Thickne on
Thickne on Rate Assess (Shell)
ss allowan
ss ment
(mm) ce
(mm)
(mm)

12 Satisfactory

Entire bottom plates shall be


replaced. Roof needs
complete replacement.

13 Satisfactory
Next
Next
Inspecti
Inspecti
on
on Date
Frequen Duratio
on the DAMAG
MAWP cy on n of CONTRI Final
Basis of Insulati Inspecti E MITIGA
(Dish Basis of Inspecti BUTING Remark
Next on on type MECHA TION
Ends) Current on FACTOR s
Inspecti NISM
Corrosi Activity
on
on
Frequen
Allowan
cy
ces
Corpora Train Equipment
Sr .No Field Process Area
tion No. Tag No.

1 OGDCL Qadirpur Recycle Membrane Train 1 E-2652

2 OGDCL Qadirpur Recycle Membrane Train 2 E-2662

3 OGDCL Qadirpur Utility No Train E-4001

4 OGDCL Qadirpur Utility No Train E-5301

5 OGDCL Qadirpur Cooling Train 01 E-9301

6 OGDCL Qadirpur Cooling Train 02 E-9901

7 OGDCL Qadirpur Refrigeration No Train H-9101


Design Design
Equipm Compon
Component Component Pressur Temper
Equipment Description ent ent
Tag No. Description e ature
Type Type
(psig) (0F)

Recycle Feed Gas Heater Heater

Recycle Feed Gas Heater Heater

Coil Heater Heater

Coil Heater Heater

Regeneration Gas Heater Heater Heater Tubes Tubes 950 868

Regeneration Gas Heater Heater Heater Tubes 950 868

Oil Separator Heater Heater


Risk
Operati Operati
Equipment / Design Ranking
ng ng Interna Length
Component Thickne Overall
Pressur Temper Contents/Fluids l Dia (mm)
Material ss (Low /
e ature
Specification (mm) Medium
(psig) (0F) (mm)
/ High)

800 350 Permeate Gas

800 350 Permeate Gas

Raw /
410 Residual/Recycle
Residue

698 422 A-106 Gr.B Raw Gas(MG out) 88.8

705 388 ASTM A 106 Gr B Raw Gas(MG out) 88.9

275 150 C.P Oil


Year Of
Major Action
manufa RBI Status Date Date Major Finding
Finding Taken
cture

Medium

Medium

Medium High

Medium High

Medium High 12-Sep-10 26-Jul-15 Severe thickness loss

Remaining life
Medium High 20-Oct-14 calculated 1.3 N/A 26-Jul-15
yrs.

Medium High
Major Action Major Action Externa
Date Date Internal Remarks
Finding Taken Finding Taken l

Not safe to operate


above 300 psi

UT gauging
recommended by
Applus Velosi after
01 yr.
Reaming
Inspection
Required Thickness Corrosion Corrosion
Thickness
(mm) allowance Rate
(mm)
(mm)
Next Inspection
Reaming Life MAWP MAWP Frequency on Basis of
Assessment (Shell) (Dish Ends) Current Corrosion
Allowances
Next Inspection
DAMAG
Date on the Duration of
E CONTRIBUTIN
Basis of Next Insulation Inspection type Inspection
MECHA G FACTOR
Inspection Activity
NISM
Frequency
MITIGA Final
TION Remarks
Corpora Process Train Equipment Tag
Sr .No Field Equipment Description
tion Area No. No.

1 OGDCL Qadirpur PEL No Train V-400 Glycol Absorber Tower


Operati Operati
Compon Design Design
Equipm Compon Compon ng ng Equipment /
ent Pressur Temper
ent ent Tag ent Pressur Temper Component
Descript e ature
Type No. Type e ature Material Specification
ion (psig) (0F)
(psig) (0F)

Tower 935 200 665 150 SA-516 Gr.70


Risk
Design Ranking
Length Year Of
Thickne Internal Dia Overall RBI
Contents/Fluids (mm) manufa Date
ss (mm) (Low / Status
cture
(mm) Medium
/ High)

Raw Gas (Glycol) OD 915 7315 11-May-14


Major Action Major Major Action Major Action
Date Date Date
Finding Taken Finding Finding Taken Finding Taken

Nil
Reamin
Require g
Inspecti Reamin
d Corrosi MAWP
Externa Remark on Corrosi g Life MAWP
Internal Thickne on (Dish
l s Thickne on Rate Assess (Shell)
ss allowan Ends)
ss ment
(mm) ce
(mm)
(mm)

5 10
Next
Next
Inspecti
Inspecti
on
on Date
Frequen Duratio
on the DAMAG
cy on n of CONTRI Final
Basis of Insulati Inspecti E MITIGA
Basis of Inspecti BUTING Remark
Next on on type MECHA TION
Current on FACTOR s
Inspecti NISM
Corrosi Activity
on
on
Frequen
Allowan
cy
ces