Report Scrubber
Report Scrubber
SCRUBBER AT MANIFOLD-58
2. Refurbish Vesel
2.1 Repair Skirt
2.2 Clean Up Coating Vessel
2.3 Cut & Weld Fitting
2.4 Instal Level Gauge
3. Fabrikasi Of Piping
3.1 Fit Up & Welding Pipe 8" Joint Of Elbow Joint
4. Hydrotest
4.1 Filling Water
4.2 Dewatering
4.3 Hydrotest
5. Painting
6. NDT
6.1 Penetran Pipa 8" Joint Of Joint Elbow
6.2 Radiography Pipa 8" Joint Of Joint Elbow