PROCESS DATA SHEET FOR SOUR WATER SUMP DRUM

(61-V3302, 71-V3302)

0 Issued for Information (IFI) B. Artero J. Guerrero O. Roosenschoon 2 Jul 2021


REV DESCRIPTION BY CHKD APVD DATE
REVISIONS
CLIENT : Qatargas Operating Company Limited
PROJECT : North Field East Project Onshore LNG Facilities
INTERNAL JV
DOC NO. : K-61-33-PR-DTS-20009
Operation Center Document No.: 202048C-6133-PDS-0800-3302
All contents of this document are subject to the use and disclosure restrictions under the Agreement and shall not be used or
disclosed in any way without the permission of both Parties
COLUMN / DRUM SPECIFICATION SHEET

Client : Qatargas Operating Company Limited


Project Title : North Field East Project Onshore LNG Facilities
Contract : LTC/C/NFE/3945/18
Doc. No. : K-61-33-PR-DTS-20009 ( 2 of 6 ) Rev. 0
Rev.
1 Item No. 61/71-V3302
0 2 Service Sour Water Sump Drum
0 3 No. Required. One (1) for Unit, Two (2) for Total Train (Note P4)
0 4 P&ID No. 61-33-PR-PID-01260
0 5 Manufacturer (To be informed Later)
6 Operating Condition
7 Fluid Sour Water
8 Pressure bar.a 1.1
9 Temperature °C 50
3
0 10 Fluid Density kg/m 988
0 11 Total Volume m3 29.4 (Note P6)
3
12 Normal Liquid Hold-up m
13 Control Range Required ( N/A ) min. / ( ) min.
14 ( ) min. / ( ) min.
15 Design Condition
0 16 Code / Stamp (Yes, No) / Specification ASME Section VIII, Div. 1 (Latest) / Yes / 60-00-ME-SPC-00001
0 17 Special Service No Yes Sour Service (Note P3), Toxic Service
18 Cyclic Service No Yes
19 Inside Diameter mm 2 100
20 TL-TL Length mm 6 300
21 Design Pressure & Temperature 3.5 bar.g at 100 °C
22 Vacuum Condition (Full, Half, No) & Temperature Full Vacuum at 149 °C
23 Minimum Design Metal Temperature (MDMT) 4 °C at 3.5 bar.g
24 Test Pressure (Hydrostatic/Pneumatic) bar.g Per Code / —
25 Corrosion Allowance (Internal/External) mm 4.5 / 0.0
26 Postweld Heat Treatment Yes No Code
27 Radiography Full Min. Spot ( % ) Code
28 Head Type 2:1 Elliptical Hemispherical Dished
29 Wind Design ASCE7-05, (Basic Wind Speed V = 41m/s (3-sec gust), Exposure Category=C, Importance factor 1.00)
30 Seismic Design ASCE7-10, (Ss = 0.147g, S1 = 0.065g, Importance Factor = 1.25, Site Class=B)
0 31 Materials of Construction (Note P3)
32 Shell : SA-516 Gr. 70N (Note M5) Internal (Removable) : 316 SS
33 Head : SA-516 Gr. 70N (Note M5) Internal (Non-removable) : SA-516 Gr. 70N / SA-106 Gr. B
34 Body Flange / Cover : N/A External (Removable) : N/A
35 Support : SA-516 Gr. 70N / SA-283 Gr. C External (Non-removable) : SA-516 Gr. 70N / SA-283 Gr. C
36 Nozzle Neck : SA-106 Gr.B / SA-105N / SA-516 Gr. 70N Bolts & Nuts (Internal) : SA-193 Gr. B8,CI. 2 / SA-194 Gr. 8A
37 SA-105N Bolts & Nuts (External) : SA-193 Gr.B7M / SA-194 Gr.2HM
38 Nozzle Flange : SA-234 Gr. WPB Demister : N/A
39 Fittings : (Note M4) Gaskets : (Note M4)
0 40 Painting : (as per 60-00-CE-SPC-00001)
41 Insulation : No Hot Cold PP / ( Thk. : ) mm
42 Fireproofing : No Yes / In ( Thk. : ) mm / Out ( Thk. : ) mm
43 Accessories Supplied by Manufacturer
44 Platform and Ladder Clips Internal Ladder (Shell, Saddle) Template
45 Pipe Support Clips Name Plate Sliding Plate
46 Lifting Lug Vortex Breaker Non-Lubricant Sliding Plate
47 Tailing Lug Corrosion Point Setting Bolt / Nuts / Washer
48 Insulation Support Internal Pipe for N3AB Cover Flange Nozzle for E1A, N2A (Note M5)
49 Fireproof Clip Top Davit Cover Flange Nozzle for E1B, N2B (Note M5)
50 Earth Piece Manhole Hinge Stiffiner Ring
51 Weight
52 Empty — kN Erection — kN Operation — kN Full Water — kN
53

54 Remarks :
55

56

57

58

59

All contents of this document are subject to the use and disclosure restrictions under the Agreement and shall not be used or
disclosed in any way without the permission of both Parties
COLUMN / DRUM SPECIFICATION SHEET

Client : Qatargas Operating Company Limited


Project Title : North Field East Project Onshore LNG Facilities
Contract : LTC/C/NFE/3945/18
Doc. No. : K-61-33-PR-DTS-20009 ( 3 of 6 ) Rev. 0
Rev.
1 Item No. : 61/71-V3302 Service : Sour Water Sump Drum
2 Notes
3

4 PROCESS NOTES:
5 ( P1 ) Liquid level abbreviation:
0 6 Level Abbreviation for
0 7 LIL Low Interface Level
0 8 LLLL Low Low Liquid Level
0 9 LLL Low Liquid Level
0 10 NLL Normal Liquid Level
0 11 HLL/HIL High Liquid Level/High Interface Level
0 12 HHLL High High Liquid Level
13 ( P2 ) The drum is equipped with two motor driven pump (61-P3303 A/B) one duty pump and one stand-by. The duty pump
14 starts automatically at a high level in the drum (61LAH-330010) and stand-by at high high level. Both the pump will
15 stop at low low drum level (61LALL-330009).
0 16 ( P3 ) Sour Service - Requirements of Project Specification 60-00-ME-SPC-00001, Appendix-B and
0 17 NFE1-CTJV-QM-PRC-00010 shall be applied.
18 ( P4 ) 61-V3302 is provided as a common equipment for Trains 8 and 9.
0 19 71-V3302 is provided as a common equipment for Trains 10 and 11.
20 ( P5 ) Equipment shall also be designed for Pressure exerted on Vessel due to Sand in the Pit.
0 21 ( P6 ) Total volume includes volume in boots. Volume in horizontal section in 24.4 m3.
22

23

24

25

26 MECHANICAL NOTES:
27 ( M1 ) All dimensions are in millimeters (mm) unless otherwise specified.
28 ( M2 ) All bolt holes shall straddle vessel centerline.
29 ( M3 ) Spiral Wound Gaskets (t4.5) as per ASME B16.20 :
30 Filler : Grafoil
31 Winding : 316 SS
32 Inner Ring : 316 SS
33 Outer Ring : CS
34 ( M4 ) Cover Flange for Nozzle E1A, Nozzle N2A will be supplied by the Pump Vendor. Cover Flange for Nozzles E1B, Nozzle
35 N2B will be supplied by Pump Vendor.
36 ( M5 ) The alternative material can be proposed which is subject to Contractor/Company approval.
37 ( M6 ) Vendor to provide lifting lugs for erection, and design the equipment for induced local stresses on shell during lifting.
38 ( M7 ) Nozzle orientations/elevations/arrangement shall be provided by Contractor separately.
39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

All contents of this document are subject to the use and disclosure restrictions under the Agreement and shall not be used or
disclosed in any way without the permission of both Parties
COLUMN / DRUM SPECIFICATION SHEET

Client : Qatargas Operating Company Limited


Project Title : North Field East Project Onshore LNG Facilities
Contract : LTC/C/NFE/3945/18
Doc. No. : K-61-33-PR-DTS-20009 ( 4 of 6 ) Rev. 0
Rev.
1 Item No. : 61/71-V3302 Service : Sour Water Sump Drum
2 Nozzle Schedule
3 Flange Rating Projection
Mark Size Service Qty. Remarks
4 Std. Class Type Facing to C.L.
0 5 N1 3" Liquid Inlet 1 ASME 300 WN RF See Dwg.
0 6 N2A/B 2" Liquid Outlet 2 ASME 150 WN RF 3250 (Note M4)
7 N3A/B 2" Liquid Outlet (Vacuum Car Unloading) 2 ASME 150 WN RF 3250 w/ Internal Pipe
8 N4 2" N2 Blanketting 1 ASME 150 WN RF 3250
9 N5 3" Vapor Outlet 1 ASME 150 WN RF 3250 to LP Sour Flare
10 N6 2" Vent 1 ASME 150 WN RF 3250
11 N7 2" Vent 1 ASME 150 WN RF 3250
12 N8 2" PRV Connection 1 ASME 150 WN RF 3250
13 E1A/B (Note M4) Pump Erection 2 ASME 150 WN RF 3250 for P-3303A/B (Remarks No. 1)
14

15 L1 4" LT (LI) Connection 1 ASME 300 WN RF 3250 for Oil interface


16 L2 4" LT (LI) Connection 1 ASME 300 WN RF 3250
17 L3 4" LT (UZ) Connection 1 ASME 300 WN RF 3250 for Pump start
18 P1 2" PG Connection 1 ASME 300 WN RF 3250
19

20 M1 24" Manhole 1 ASME 150 WN RF 1370 w/ Blind, Hinge & Handle


21

22 Remarks:
23 ( 1 ) Size and rating of nozzle E1A and E1B to be confirmed by pump vendor (See Note M4)
24 ( 2 ) Nozzle projections are on HOLD.
25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

All contents of this document are subject to the use and disclosure restrictions under the Agreement and shall not be used or
disclosed in any way without the permission of both Parties
COLUMN / DRUM SPECIFICATION SHEET

Client : Qatargas Operating Company Limited


Project Title : North Field East Project Onshore LNG Facilities
Contract : LTC/C/NFE/3945/18
Doc. No. : K-61-33-PR-DTS-20009 ( 5 of 6 ) Rev. 0
Rev.
1 Item No. : 61/71-V3302 Service : Sour Water Sump Drum
2 Drawing (1 of 2)
3

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

All contents of this document are subject to the use and disclosure restrictions under the Agreement and shall not be used or
disclosed in any way without the permission of both Parties
COLUMN / DRUM SPECIFICATION SHEET

Client : Qatargas Operating Company Limited


Project Title : North Field East Project Onshore LNG Facilities
Contract : LTC/C/NFE/3945/18
Doc. No. : K-61-33-PR-DTS-20009 ( 6 of 6 ) Rev. 0
Rev.
0 1 Item No. : 61/71-V3302 Service : Sour Water Sump Drum
2 Drawing (2 of 2)
3

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

All contents of this document are subject to the use and disclosure restrictions under the Agreement and shall not be used or
disclosed in any way without the permission of both Parties