Professional Documents
Culture Documents
K 61 33 PR DTS 20009 - 0001 - 0
K 61 33 PR DTS 20009 - 0001 - 0
K 61 33 PR DTS 20009 - 0001 - 0
(61-V3302, 71-V3302)
54 Remarks :
55
56
57
58
59
All contents of this document are subject to the use and disclosure restrictions under the Agreement and shall not be used or
disclosed in any way without the permission of both Parties
COLUMN / DRUM SPECIFICATION SHEET
4 PROCESS NOTES:
5 ( P1 ) Liquid level abbreviation:
0 6 Level Abbreviation for
0 7 LIL Low Interface Level
0 8 LLLL Low Low Liquid Level
0 9 LLL Low Liquid Level
0 10 NLL Normal Liquid Level
0 11 HLL/HIL High Liquid Level/High Interface Level
0 12 HHLL High High Liquid Level
13 ( P2 ) The drum is equipped with two motor driven pump (61-P3303 A/B) one duty pump and one stand-by. The duty pump
14 starts automatically at a high level in the drum (61LAH-330010) and stand-by at high high level. Both the pump will
15 stop at low low drum level (61LALL-330009).
0 16 ( P3 ) Sour Service - Requirements of Project Specification 60-00-ME-SPC-00001, Appendix-B and
0 17 NFE1-CTJV-QM-PRC-00010 shall be applied.
18 ( P4 ) 61-V3302 is provided as a common equipment for Trains 8 and 9.
0 19 71-V3302 is provided as a common equipment for Trains 10 and 11.
20 ( P5 ) Equipment shall also be designed for Pressure exerted on Vessel due to Sand in the Pit.
0 21 ( P6 ) Total volume includes volume in boots. Volume in horizontal section in 24.4 m3.
22
23
24
25
26 MECHANICAL NOTES:
27 ( M1 ) All dimensions are in millimeters (mm) unless otherwise specified.
28 ( M2 ) All bolt holes shall straddle vessel centerline.
29 ( M3 ) Spiral Wound Gaskets (t4.5) as per ASME B16.20 :
30 Filler : Grafoil
31 Winding : 316 SS
32 Inner Ring : 316 SS
33 Outer Ring : CS
34 ( M4 ) Cover Flange for Nozzle E1A, Nozzle N2A will be supplied by the Pump Vendor. Cover Flange for Nozzles E1B, Nozzle
35 N2B will be supplied by Pump Vendor.
36 ( M5 ) The alternative material can be proposed which is subject to Contractor/Company approval.
37 ( M6 ) Vendor to provide lifting lugs for erection, and design the equipment for induced local stresses on shell during lifting.
38 ( M7 ) Nozzle orientations/elevations/arrangement shall be provided by Contractor separately.
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
All contents of this document are subject to the use and disclosure restrictions under the Agreement and shall not be used or
disclosed in any way without the permission of both Parties
COLUMN / DRUM SPECIFICATION SHEET
22 Remarks:
23 ( 1 ) Size and rating of nozzle E1A and E1B to be confirmed by pump vendor (See Note M4)
24 ( 2 ) Nozzle projections are on HOLD.
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
All contents of this document are subject to the use and disclosure restrictions under the Agreement and shall not be used or
disclosed in any way without the permission of both Parties
COLUMN / DRUM SPECIFICATION SHEET
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
All contents of this document are subject to the use and disclosure restrictions under the Agreement and shall not be used or
disclosed in any way without the permission of both Parties
COLUMN / DRUM SPECIFICATION SHEET
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
All contents of this document are subject to the use and disclosure restrictions under the Agreement and shall not be used or
disclosed in any way without the permission of both Parties