F0 33:SAFETY ORGANIZATION

JOB SAFE PRACTICE (5.19.2)

DEPARTMENT SAFETY EMPLOYEE JOB TITLE SAFETY ENGINEER


JOB/TASK TITLE FOC Splicing/Cable Termination works inside Hajar/Nujha S/S
STEPS HAZARDS CONTROLS REQUIRED TO OBSERVATION
STEP# LIST ALL STEPS IN PERFORMING THIS TASK IN EACH STEP , WHAT MINIMIZE /ELEMINATE HAZARD
COULD CAUSE INJURY,LOSS
DAMAGE
INTERUPTION,OR
POLUTION?
2. FOC splicing/ Termination 1. Dropping 1. Permit to work(PTW),
materials or tools. should be obtained
2. Sharp edges on 2. Tool box talk must be
hardware or pinch conducted before
points starting the activities
3. Sharp fibers hairs 3. Ensure that suitable
can penetrate the and correct PPE are being
skin provided and used by the
4. Electrical fire, workers, Ex(Safety
burn & shock due to gloves, safety glasses
faulty electrically etc.)
powered tools and 4. Regular maintenance
faulty electrical and inspection on all
connection. electrically powered
tools & electrical
connection.
5. Provision of adequate
& suitable firefighting
equipment’s nearby hot

Prepared by: Approved by: Element 5.19 Page No: Page 1 of 2 Revision No: 00
Reference No:
F0 33:SAFETY ORGANIZATION
JOB SAFE PRACTICE (5.19.2)

working area.
6. Power generator must
be keep outside open
area & earthed.
7. Fire warden must be
provided

COMPILED BY Mr Shariq, Mr.Emad DATE 02- July-2020


MANAGER MANAGER

Prepared by: Approved by: Element 5.19 Page No: Page 2 of 2 Revision No: 00