Professional Documents
Culture Documents
Mobile Communication Technology - Udemy
Mobile Communication Technology - Udemy
Mobile Communication Technology - Udemy
By : Abdelrahman M. Osama
Mobile Communication
Part 1 - Site Design
Abdelrahman M. Osama
Agenda
• Site Design
• Access Network KPIs & Data Analytics
• RF Planning Process & Capacity Aspects
• Career Path.
Mobile Communication Players
• Operators
• Vendors
• Sub Contractors
• End User
Site Types
Site Types
Site Types
• Macro – Green field
– To provide wide coverage indoor / outdoor rural areas &
roads
Site Types
• Macro – Roof top
– To provide wide Coverage & Capacity for indoor / outdoor
urban areas & cities
Site Types
• Macro – Cell on Wheels (COW)
– Used as a Temporary solution to provide coverage and
capacity for a certain duration (events)
Site Types
Site Types
Site Types
Site Equipment's
Site Equipment
Antenna
Air Interface
Radio Unit
Feeder
Jumper Cable
– Radio Unit
Site Equipment
Antenna types
➢ Omni-Directional Antennas
o Omni-directional antennas have a uniform radiation
pattern with respect to horizontal directions.
o Used in the indoor solutions
➢ Uni-Directional Antennas
o A uni-directional antenna has a non-uniform horizontal
and vertical radiation pattern
o Used in sectored cells.
o The radiated power is concentrated in one direction.
Site Equipment
• Radiation Pattern
o Vertical Beam-width
Site Equipment
➢ Main Antenna Parameters (Cont’d)
o Tilting
Site Equipment
Site Equipment
Site Equipment
Site Equipment
• Antenna Parameters:
– Freq Band
– Ports
– Patterns
– Vertical Beam Width
– Horizontal Beam Width
– Tilting
• Electrical Tilt
• Mechanical Tilt
Site Equipment
• Antenna Vendors:
– Commscope
– Comba
– Andrew
– Huawei
– PowerWave
– Kathrin
– Cellmax
– Jaybeam
Site Equipment
• Radio Unit Characteristics :
– Frequency Band
– Power Amplifier
Site Equipment
• Radio Unit HW:
Site Equipment
• Radio Unit HW:
Site Equipment
Site Equipment
Site Equipment
Site Equipment
Site Equipment
• Site Equipment Subsystems:
– RF Subsystem
– Baseband Subsystem
– Transmission Subsystem
– Power & Alarm Subsystem
Site Equipment
• Baseband Subsystem
Site Equipment
Site Equipment
Site Equipment
Site Equipment
Site Equipment
Site Equipment
Site Equipment
Site Equipment
Site Equipment
Site Equipment
Site Equipment
• Site Equipment Subsystems:
– RF Subsystem
– Baseband Subsystem
– Transmission Subsystem
– Power & Alarm Subsystem
Site Equipment
Site Equipment
Site Equipment
Key Performance Indicators
(KPIs)
KPIs
• Definition
“Key Performance Indicators” it is a general term used to
define the keys or observations through which you can
judge if the performance is good or not.
• Service Integrity
1.Rxqual
❑It is obtained by averaging the Bit Error Rate over a certain
period ~ 0.5 sec and it is measured in both the Downlink and Uplink
❑The algorithm used for calculation the SQI takes into account the BER, the
distribution of BER, the FER (Frame Erasure Rate) and the codec used (HR,
FR, EFR).
TCH Traffic
TCH Blocking
TCH Traffic
BQ Both Links
BQ Downlink
BQ Uplink
Low SS Both Links
Low SS Downlink
Low SS Uplink
Sudden Lost
KPIs Area Analytics
Agenda
• Area 1 Analysis
• Area 2 Analysis
• Area 3 Analysis
• Area 4 Analysis
Agenda
• Area 1 Analysis
• Area 2 Analysis
• Area 3 Analysis
• Area 4 Analysis
2G Area 1
Speech Traffic Vs CFR CFR
20000 +0.06% CFR Enhanced 0.50
18000 0.40
17000 0.35
16000 0.30
15000 0.25
14000 0.20
13000 0.15
12000 0.10
11000 0.05
10000 0.00
13-Sep
18-Sep
23-Sep
28-Sep
4-Aug
9-Aug
14-Aug
19-Aug
24-Aug
29-Aug
3-Sep
8-Sep
13-Oct
18-Oct
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
30-Jul
3-Oct
8-Oct
25-Jul
13-Sep
18-Sep
23-Sep
28-Sep
4-Aug
9-Aug
14-Aug
19-Aug
24-Aug
29-Aug
3-Sep
8-Sep
13-Oct
18-Oct
20-Jun
25-Jun
30-Jun
5-Jul
3-Oct
8-Oct
10-Jul
15-Jul
20-Jul
30-Jul
25-Jul
0.00
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
20-Jun
24-Jun
28-Jun
2-Jul
6-Jul
10-Jul
14-Jul
18-Jul
22-Jul
26-Jul
30-Jul
= 0.98
3-Aug
7-Aug
11-Aug
Sum of CFR
15-Aug
19-Aug
23-Aug
AFR & CFR
27-Aug
31-Aug
2G Area 1
Sum of AFR
4-Sep
Correlation Coefficient
8-Sep
12-Sep
16-Sep
20-Sep
24-Sep
28-Sep
2-Oct
6-Oct
10-Oct
14-Oct
18-Oct
2G Area 1
4-Sep
9-Sep
14-Sep
19-Sep
24-Sep
29-Sep
10-Aug
15-Aug
20-Aug
25-Aug
30-Aug
14-Oct
21-Jun
26-Jun
1-Jul
6-Jul
11-Jul
16-Jul
21-Jul
26-Jul
31-Jul
4-Oct
9-Oct
Sum of SPEECH_TRAFFIC Sum of DCLR
2G Area 1 - Summary
• CFR , ARF & DCLR degraded since 17-Aug
2020.
UMTS-2100-C1
11-Aug
15-Aug
19-Aug
23-Aug
Speech Traffic
27-Aug
3G Area 1
31-Aug
UMTS-2100-C2 4-Sep
8-Sep
12-Sep
16-Sep
20-Sep
24-Sep
28-Sep
2-Oct
6-Oct
10-Oct
14-Oct
18-Oct
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0%
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
25-Jul
UMTS-2100-C1
30-Jul
4-Aug
9-Aug
14-Aug
19-Aug
24-Aug
by 50%
UMTS-2100-C2
29-Aug
Speech Traffic %
3-Sep
3G Area 1
8-Sep
13-Sep
U900-C1 offloaded
18-Sep
UMTS-900-C1
23-Sep
28-Sep
3-Oct
8-Oct
by 70 %
13-Oct
18-Oct
U900-C1 offloaded
0
800000
1000000
1200000
1400000
1600000
1800000
2000000
200000
400000
600000
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
UMTS-2100-C1
25-Jul
30-Jul
4-Aug
9-Aug
14-Aug
19-Aug
Data Traffic
24-Aug
UMTS-2100-C2
29-Aug
3G Area 1
3-Sep
8-Sep
13-Sep
18-Sep
UMTS-900-C1
23-Sep
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0%
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
25-Jul
30-Jul
4-Aug
9-Aug
offloaded by 47%
14-Aug
U2100-C1 & C2 are
UMTS-2100-C1
19-Aug
24-Aug
Data Traffic %
29-Aug
3G Area 1
3-Sep
8-Sep
UMTS-2100-C2
13-Sep
18-Sep
23-Sep
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
0
1
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.1
1.2
1.3
1.4
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
25-Jul
UMTS-2100-C1
30-Jul
4-Aug
9-Aug
14-Aug
19-Aug
CFR
24-Aug
UMTS-2100-C2
29-Aug
3-Sep
8-Sep
3G Area 1
13-Sep
18-Sep
23-Sep
UMTS-900-C1
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
0
0.3
0.6
0.9
1.2
1.5
1.8
2.1
2.4
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
25-Jul
UMTS-2100-C1
30-Jul
4-Aug
9-Aug
14-Aug
19-Aug
DCLR
24-Aug
UMTS-2100-C2
29-Aug
3-Sep
3G Area 1
8-Sep
13-Sep
18-Sep
23-Sep
UMTS-900-C1
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
2
3
4
5
6
7
8
9
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
25-Jul
UMTS-2100-C1
30-Jul
4-Aug
9-Aug
14-Aug
19-Aug
IRAT
24-Aug
29-Aug
UMTS-2100-C2
3-Sep
8-Sep
3G Area 1
13-Sep
18-Sep
23-Sep
UMTS-900-C1
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
40000
45000
50000
55000
60000
65000
70000
20-Jun
26-Jun
2-Jul
8-Jul
14-Jul
20-Jul
26-Jul
1-Aug
7-Aug
13-Aug
Total
19-Aug
25-Aug
31-Aug
3G Area 1
6-Sep
Total Speech Traffic
12-Sep
18-Sep
24-Sep
30-Sep
6-Oct
12-Oct
18-Oct
3700000
2500000
2700000
2900000
3100000
3300000
3500000
3900000
20-Jun
26-Jun
2-Jul
8-Jul
14-Jul
20-Jul
26-Jul
1-Aug
7-Aug
13-Aug
19-Aug
25-Aug
31-Aug
Total Data Traffic
3G Area 1
6-Sep
12-Sep
= 15%
18-Sep
24-Sep
30-Sep
6-Oct
12-Oct
Total Data Traffic loss
18-Oct
3G Area 1 - Summary
• Speech & Data Traffic Strategy changed on 2-
Sept 2020
– Pushing Voice over U2100
– Pushing Data over U900-C1 Impacting CFR &
DCLR.
Agenda
• Area 1 Analysis
• Area 2 Analysis
• Area 3 Analysis
• Area 4 Analysis
8000000
9000000
10000000
11000000
12000000
13000000
14000000
15000000
16000000
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
25-Jul
30-Jul
4-Aug
9-Aug
14-Aug
19-Aug
24-Aug
29-Aug
Total Data Traffic
3-Sep
4G Area 2
8-Sep
13-Sep
18-Sep
23-Sep
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
%
+20
0
2000000
4000000
6000000
8000000
10000000
12000000
14000000
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
25-Jul
LTE_L09
30-Jul
4-Aug
9-Aug
14-Aug
LTE_L18
19-Aug
24-Aug
29-Aug
3-Sep
4G Area 2
LTE_L21
8-Sep
Total Data Traffic Per Band
13-Sep
18-Sep
23-Sep
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
20%
30%
40%
50%
60%
70%
80%
90%
100%
0%
10%
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
25-Jul
30-Jul
LTE_L09
4-Aug
9-Aug
14-Aug
19-Aug
LTE_L18
24-Aug
Total Traffic %
29-Aug
3-Sep
LTE_L21
4G Area 2
8-Sep
13-Sep
18-Sep
23-Sep
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
10
12
13
14
15
16
11
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
25-Jul
30-Jul
4-Aug
9-Aug
14-Aug
19-Aug
24-Aug
29-Aug
3-Sep
Avg DL User Thrpt
4G Area 2
8-Sep
13-Sep
18-Sep
23-Sep
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
+
9%
5
7
9
11
13
15
19
21
23
25
27
29
17
20-Jun
25-Jun
30-Jun
+
5-Jul
10-Jul
35%
15-Jul
20-Jul
25-Jul
30-Jul
LTE_L09
4-Aug
9-Aug
14-Aug
19-Aug
LTE_L18
24-Aug
29-Aug
+ 25%
3-Sep
4G Area 2
8-Sep
LTE_L21
13-Sep
Avg DL User Thrpt Per Band
18-Sep
23-Sep
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
4G Area 2
3-Sep
8-Sep
13-Sep
18-Sep
23-Sep
28-Sep
14-Aug
19-Aug
24-Aug
29-Aug
13-Oct
18-Oct
5-Jul
20-Jun
25-Jun
30-Jun
10-Jul
15-Jul
20-Jul
25-Jul
30-Jul
3-Oct
8-Oct
LTE_L09 - Sum of DATA_TRAFFIC LTE_L09 - Average of AVG_DL_USER_Throughput
4G Area 2
13-Sep
23-Sep
28-Sep
4-Aug
9-Aug
3-Sep
8-Sep
18-Sep
14-Aug
19-Aug
24-Aug
29-Aug
13-Oct
18-Oct
20-Jun
25-Jun
30-Jun
5-Jul
3-Oct
8-Oct
10-Jul
15-Jul
20-Jul
25-Jul
30-Jul
0 0
13-Sep
18-Sep
23-Sep
28-Sep
4-Aug
9-Aug
14-Aug
19-Aug
24-Aug
29-Aug
3-Sep
8-Sep
13-Oct
18-Oct
20-Jun
25-Jun
30-Jun
5-Jul
3-Oct
8-Oct
10-Jul
15-Jul
20-Jul
25-Jul
30-Jul
8-Sep
13-Sep
18-Sep
23-Sep
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
5000000
5500000
6000000
6500000
4000000
4500000
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
25-Jul
30-Jul
4-Aug
9-Aug
14-Aug
19-Aug
24-Aug
29-Aug
Total Data Traffic
3-Sep
3G Area 2
8-Sep
13-Sep
18-Sep
23-Sep
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
20-Jun
24-Jun
28-Jun
2-Jul
6-Jul
10-Jul
14-Jul
18-Jul
22-Jul
26-Jul
UMTS-2100-C1
30-Jul
3-Aug
7-Aug
11-Aug
15-Aug
19-Aug
23-Aug
UMTS-2100-C2
27-Aug
Speech Traffic
31-Aug
4-Sep
3G Area 2
8-Sep
12-Sep
16-Sep
20-Sep
UMTS-900-C1
24-Sep
28-Sep
2-Oct
6-Oct
10-Oct
14-Oct
18-Oct
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0%
20-Jun
24-Jun
28-Jun
2-Jul
6-Jul
10-Jul
14-Jul
18-Jul
22-Jul
26-Jul
30-Jul
UMTS-2100-C1
3-Aug
7-Aug
11-Aug
15-Aug
19-Aug
23-Aug
UMTS-2100-C2
SpeechTraffic
27-Aug
31-Aug
3G Area 2
4-Sep
8-Sep
12-Sep
16-Sep
UMTS-900-C1
20-Sep
24-Sep
28-Sep
2-Oct
6-Oct
10-Oct
14-Oct
18-Oct
0
1000000
1500000
2000000
2500000
3000000
3500000
4000000
4500000
5000000
500000
20-Jun
24-Jun
28-Jun
2-Jul
6-Jul
10-Jul
14-Jul
18-Jul
22-Jul
26-Jul
UMTS-2100-C1
30-Jul
3-Aug
7-Aug
11-Aug
15-Aug
19-Aug
DataTraffic
23-Aug
UMTS-2100-C2
27-Aug
31-Aug
3G Area 2
4-Sep
8-Sep
12-Sep
16-Sep
UMTS-900-C1
20-Sep
24-Sep
28-Sep
2-Oct
6-Oct
10-Oct
14-Oct
18-Oct
100%
10%
20%
40%
50%
60%
70%
80%
0%
30%
90%
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
25-Jul
UMTS-2100-C1
30-Jul
4-Aug
9-Aug
14-Aug
19-Aug
24-Aug
DataTraffic
UMTS-2100-C2
29-Aug
3-Sep
3G Area 2
8-Sep
13-Sep
18-Sep
UMTS-900-C1
23-Sep
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
0
1
0.2
0.4
0.6
0.8
1.2
1.4
1.6
20-Jun
25-Jun
29-Jun
3-Jul
7-Jul
11-Jul
15-Jul
19-Jul
23-Jul
27-Jul
UMTS-2100-C1
31-Jul
4-Aug
8-Aug
12-Aug
16-Aug
CFR
20-Aug
24-Aug
UMTS-2100-C2
28-Aug
1-Sep
3G Area 2
5-Sep
9-Sep
13-Sep
18-Sep
22-Sep
UMTS-900-C1
26-Sep
30-Sep
4-Oct
8-Oct
12-Oct
16-Oct
0
1
0.2
0.4
0.6
0.8
1.2
20-Jun
24-Jun
28-Jun
2-Jul
6-Jul
10-Jul
14-Jul
18-Jul
23-Jul
27-Jul
31-Jul
UMTS-2100-C1
4-Aug
8-Aug
12-Aug
16-Aug
20-Aug
DCLR
24-Aug
UMTS-2100-C2
28-Aug
3G Area 2
1-Sep
5-Sep
9-Sep
13-Sep
17-Sep
21-Sep
UMTS-900-C1
25-Sep
29-Sep
3-Oct
7-Oct
11-Oct
15-Oct
0
2
4
6
8
10
12
14
20-Jun
25-Jun
29-Jun
3-Jul
7-Jul
11-Jul
15-Jul
19-Jul
24-Jul
28-Jul
1-Aug
UMTS-2100-C1
5-Aug
9-Aug
13-Aug
17-Aug
IRAT
21-Aug
25-Aug
UMTS-2100-C2
29-Aug
2-Sep
3G Area 2
6-Sep
10-Sep
14-Sep
18-Sep
22-Sep
UMTS-900-C1
26-Sep
30-Sep
4-Oct
8-Oct
12-Oct
16-Oct
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
20-Jun
25-Jun
29-Jun
3-Jul
7-Jul
11-Jul
15-Jul
19-Jul
24-Jul
28-Jul
1-Aug
5-Aug
9-Aug
13-Aug
Average of CFR
17-Aug
21-Aug
25-Aug
29-Aug
2-Sep
3G Area 2
2
3
4
5
6
8
9
7
20-Jun
25-Jun
29-Jun
3-Jul
7-Jul
11-Jul
15-Jul
19-Jul
24-Jul
28-Jul
1-Aug
5-Aug
9-Aug
13-Aug
17-Aug
21-Aug
Avg IRAT
25-Aug
29-Aug
2-Sep
3G Area 2
6-Sep
10-Sep
14-Sep
18-Sep
22-Sep
26-Sep
30-Sep
4-Oct
8-Oct
12-Oct
16-Oct
100000
60000
65000
70000
75000
80000
85000
90000
95000
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
25-Jul
30-Jul
4-Aug
9-Aug
14-Aug
19-Aug
24-Aug
Speech Traffic
29-Aug
3-Sep
8-Sep
13-Sep
18-Sep
23-Sep
3G Area 2 – Cluster
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
3G Area 2 – Cluster
Data Traffic Vs Hsdpa User Thrpt
6500000 800
6000000 700
600
5500000
500
5000000
400
4500000
300
4000000
200
3500000 100
3000000 0
13-Sep
18-Sep
23-Sep
28-Sep
4-Aug
9-Aug
3-Sep
8-Sep
14-Aug
19-Aug
24-Aug
29-Aug
13-Oct
18-Oct
20-Jun
25-Jun
30-Jun
5-Jul
10-Jul
15-Jul
20-Jul
25-Jul
30-Jul
3-Oct
8-Oct
Sum of DATA_TRAFFIC Sum of HSDPA_USER_Thr
10-Sep
14-Sep
18-Sep
22-Sep
26-Sep
30-Sep
1-Aug
5-Aug
9-Aug
2-Sep
6-Sep
13-Aug
17-Aug
21-Aug
25-Aug
29-Aug
12-Oct
16-Oct
14-Jun
18-Jun
22-Jun
26-Jun
30-Jun
12-Jul
16-Jul
20-Jul
24-Jul
28-Jul
4-Jul
8-Jul
4-Oct
8-Oct
Sum of DATA_TRAFFIC Sum of NON_CA_DL_User_Throu
Sum of CA_DL_User_Throu Sum of AVG_DL_USER_Thr
3G Area 3
10-Sep
14-Sep
18-Sep
22-Sep
26-Sep
30-Sep
1-Aug
5-Aug
9-Aug
2-Sep
6-Sep
13-Aug
17-Aug
21-Aug
25-Aug
29-Aug
12-Oct
16-Oct
4-Jul
8-Jul
4-Oct
8-Oct
14-Jun
18-Jun
22-Jun
26-Jun
30-Jun
12-Jul
16-Jul
20-Jul
24-Jul
28-Jul
Sum of CFR
9-Aug
13-Aug
17-Aug
21-Aug
CFR & DCLR
25-Aug
3G Area 3
29-Aug
2-Sep
Sum of DCLR
6-Sep
10-Sep
14-Sep
18-Sep
22-Sep
26-Sep
30-Sep
4-Oct
8-Oct
12-Oct
16-Oct
3G Area 3 - Summary
• It seems Seasonality Trends.
Agenda
• Area 1 Analysis
• Area 2 Analysis
• Area 3 Analysis
• Area 4 Analysis
2G Area 4
Speech Traffic Vs DCLR
45000 1.3
43000 1.25
41000 1.2
1.15
39000
1.1
37000
1.05
35000
1
33000
0.95
31000 0.9
29000 0.85
27000 0.8
12-Sep
17-Sep
22-Sep
27-Sep
3-Aug
8-Aug
13-Aug
18-Aug
23-Aug
28-Aug
2-Sep
7-Sep
12-Oct
17-Oct
2-Oct
7-Oct
14-Jul
19-Jul
24-Jul
29-Jul
14-Jun
19-Jun
24-Jun
29-Jun
4-Jul
9-Jul
0.1
0.2
0.3
0.4
0.5
0.7
0.8
0.9
0.6
14-Jun
19-Jun
24-Jun
29-Jun
4-Jul
9-Jul
14-Jul
19-Jul
24-Jul
29-Jul
3-Aug
8-Aug
Sum of CFR
13-Aug
18-Aug
24-Aug
AFR Vs CFR
29-Aug
2G Area 4
Sum of AFR
3-Sep
8-Sep
13-Sep
18-Sep
23-Sep
28-Sep
3-Oct
8-Oct
13-Oct
18-Oct
1
2
0
0.2
0.4
0.6
0.8
1.2
1.4
1.6
1.8
2.2
2.4
14-Jun
19-Jun
24-Jun
29-Jun
4-Jul
9-Jul
14-Jul
19-Jul
24-Jul
29-Jul
3-Aug
8-Aug
13-Aug
18-Aug
23-Aug
12-Sep
Sum of CFR 17-Sep
22-Sep
27-Sep
2-Oct
7-Oct
12-Oct
17-Oct
1
2
4
5
7
0
3
6
0
10000
20000
30000
40000
50000
60000
14-Jun
19-Jun
24-Jun
29-Jun
4-Jul
9-Jul
14-Jul
19-Jul
24-Jul
Sum of CS_Fails
29-Jul
3-Aug
8-Aug
13-Aug
18-Aug
23-Aug
28-Aug
2-Sep
3G Area 4
7-Sep
12-Sep
CS Failures Vs Un Availability
17-Sep
22-Sep
Sum of UnAvailability (Active)
27-Sep
2-Oct
7-Oct
12-Oct
17-Oct
0
1
2
3
4
5
6
7
2000
4000
6000
8000
0
10000
12000
14000
14-Jun
19-Jun
24-Jun
29-Jun
4-Jul
9-Jul
14-Jul
19-Jul
24-Jul
29-Jul
3-Aug
8-Aug
13-Aug
18-Aug
CS Drops
23-Aug
3G Area 4
28-Aug
2-Sep
7-Sep
12-Sep
17-Sep
22-Sep
27-Sep
2-Oct
7-Oct
12-Oct
17-Oct
450
550
600
650
700
750
500
14-Jun
19-Jun
24-Jun
29-Jun
4-Jul
9-Jul
14-Jul
19-Jul
24-Jul
29-Jul
3-Aug
8-Aug
13-Aug
18-Aug
23-Aug
28-Aug
3G Area 4
Hsdpa User Thrpt
2-Sep
7-Sep
12-Sep
17-Sep
22-Sep
27-Sep
2-Oct
7-Oct
12-Oct
17-Oct
Area 4 - Summary
• The area was suffering from un Availability
problem.
– 8th ➔ 18th of July 2020
– 18th of Aug ➔ 18th of Sept 2020
RF Planning Process & Capacity
Aspects
RF Planning Process
Radio Network Planning Objective
• Capacity:
To support the subscriber traffic with sufficiently low blocking
and delay.
• Coverage:
To obtain the ability of the network ensure the availability of
the service in the entire service area.
• Quality:
Linking the capacity and the coverage and still provide the
required QoS.
• Costs:
To enable an economical network implementation when the
service is established and a controlled network expansion
during the life cycle of the network.
Radio Channel
• Reflection, diffraction or scattering ,
shadowing and multipath fading.
• Radio channels are extremely random -not
easy analysis.
• Modeling the radio channel is so difficult and
is typically done in statistical fashion based on
measurements done for the particular case at
hand.
Link Budget
• Received power (dBm)=Transmitted power
(dBm)+Gains (dB)−Losses (dB)
Link Budget
• PRX=PTX+GTX+GRX−LTX−LFS−LP−LRX
•
Okumura Model
• One of the most widely used models for signal
prediction in urban area
• Applicable for
– Frequencies in the range 150 – 1920 MHz (used
up to 3000 MHz)
– Distances of 1 – 100 km
– BS antenna heights from 30 – 1000
Okumura Model
Interview Question
• We need to make a radio planning for an New
Area like New Capital City. Please tell me what
you will do?
Clutter Classes
Dense Urban Suburban
Urban Rural
Answer
• Define clutter classes.
– Dense urban ( Marg / Khsous / Shoubra)
– Urban ( Nasr city , Masr al Gideda)
– Sub urban ( 5th settlement)
– Rural
Abdelrahman M.Osama
The Need for 5G
Need for 5G
• Mobile data traffic is increasing tremendously with
expectation to reach more than 300 EB/month in 2028
• Exabyte ➔ 10^18 Byte
Internet of Things
• 3GPP:
– Creates and maintains the technical standards.
– It works within the guidelines and requirements
provided from the ITU.
IMT 2020
• IMT 2020 ➔ 5G
• IMT – Advanced ➔ 4G
• IMT – 2000 ➔ 3G
5G Use Cases
eMBB
mMTC uRLLC
5G Use Cases
• AR : Augmented Reality
– Adding digital elements to your reality like
Pokémon go
• VR : Virtual Reality
– Replaces reality by somewhere else
• FWA
• V2X
FWA
• Fixed wireless access (FWA) is a way to provide wireless internet access to
homes or businesses without laying fiber and cables.